Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "URT:Agenda-21-10-2013"

From EGIWiki
Jump to navigation Jump to search
 
(21 intermediate revisions by 7 users not shown)
Line 13: Line 13:


== Status of the products verification/staged rollout ==
== Status of the products verification/staged rollout ==
* dCache 2.2.17 is struggling to find early adopters. Apparently many sites are planning to move to 2.6.x (which should be good)


=== Ready for the release ===
=== Ready for the release ===
* '''UMD 2 update: as soon as dCache and BDII are ready'''
* '''UMD 2 update'''
** GSIssh
** GSIssh v.5.3.9
** CREAM GE
** CREAM GE v2.0.2
** BDII
** BDII Top and Core
** DPM 1.8.6
** DPM 1.8.6
== Issues found during release preparation ==
During the verification of the last emi-wn we encountered a problem with the missing 32bits libraries cumming from lcg_utils. This issue was partially solved after the PT sent the list of the update 32bits libraries also update since one of this 32bits libraries asked for a dependency of another 32bits libraries from another PT (grid-site).
Conclusion we needed to redo 4 PPA' s (WN, UI, gride-site and lcg_utils) which was time consuming and stressful.
Our release process doesn't automatically fetch all the necessary RPM from EPEL (otherwise we will fetch other dependencies not directly released by the PTs) meaning we always need an correct  list of RPM's for each release even the 32 bits (not the full 32 bits list but only the 32bits rpm's needed by the 64 bits version).


= Updates from the product teams =
= Updates from the product teams =
Line 30: Line 40:
** Other information:  
** Other information:  
== ARC ==
== ARC ==
* Release version 3.0.3 Expected: 2013-07-31
* Release 13.11 version 4.0.0 Expected: 2013-11-09
** Main changes: bugfix release
** Main changes: Major release, new BDB job storage, new infosys startup scripts, direct DQ2 support, improved WebDAV support, improved proxy handling
** Other information: none
** Other information: RC1 expected to be tagged 21-10-2013


== Argus ==
== Argus ==
Line 40: Line 50:
== dCache ==
== dCache ==
* dCache Release Schedule
* dCache Release Schedule
** Main changes: (including other products affected)
** Main changes: dcap client removed from EMI repos, now all dcap available via EPEL for SL5/SL6
** new Releases for UMD-2 dcache-server 2.2 and UMD-3 dcache-server 2.6 planned
** Other information:
** Other information:


Line 105: Line 116:
== CREAM ==
== CREAM ==


* Plan to release version:
* Plan to release version: Update EMI 2 & EMI 3 - 31 Oct.2013
** BLAH 1.20 4 (EMI 3)
** CREAM SLURM module 1.0.1 (EMI 3)
** CREAM TORQUE module 2.1.2 (EMI 3)
** CREAM 1.14.6 (EMI 2)
** Main changes:
** Main changes:
*** [https://ggus.eu/ws/ticket_info.php?ticket=96171 GGUS #96171 - Missing CE information from SLURM infoprovider]
*** [https://ggus.eu/ws/ticket_info.php?ticket=95751 GGUS #95751 - MPI support for SLURM jobs ]
*** [https://ggus.eu/ws/ticket_info.php?ticket=96703 GGUS #96703 - Wrong total cpu count from PBS infoprovider]
** Other information:
** Other information:


== STORM ==
== STORM ==


* Next release
* Next release: Oct. 2013
** STORM 1.11.3 (EMI 3)
** Main changes:
** Main changes:
*** Mainly WebDAV issues
** Other information:
** Other information:


== VOMS ==
== VOMS ==
* Next releases
* Next releases: Oct 2013
** Release version w.k.j Expected on: 2013-xx-yy
** VOMS Clients v. 3.0.4, VOMS API Java v. 3.0.2 (EMI 3)
*** Main changes: (including other products affected)
** VOMS Admin server v. 3.3.0 (EMI 3)
*** Other information:
** Main changes:
*** [https://ggus.eu/ws/ticket_info.php?ticket=97555 GGUS #97555 - Serializing private key using pkcs#8 encoding confuses dCache clients]
*** [https://ggus.eu/ws/ticket_info.php?ticket=95660 GGUS #95660 - Socket timeout can lead to VOMS Server hanging in endless loop]
*** Migrate Java API to CAnL 1.3
*** [https://issues.infn.it/jira/issues/?jql=project%20%3D%20VOMS%20AND%20fixVersion%20%3D%20%22VOMS%20Admin%20server%20v.%203.3.0%22%20AND%20resolution%20is%20not%20EMPTY VOMS Server fixed issues]
** Other information:
 


== WMS ==
== WMS ==
* Release version w.k.j Expected on: 2013-xx-yy
* Next releases: EMI 3 - 31 Oct. 2013
** Main changes: (including other products affected)
** WMS 3.6.1 (EMI 3)
** Other information:  
** Main changes:
*** Sec. Vulnerabilities
*** [https://ggus.eu/ws/ticket_info.php?ticket=96733 GGUS #96733 - glite_wms_wmproxy_server prints taint check warnings]
*** Other information:  
 
 
== Globus ==
== Globus ==
* Release version w.k.j Expected on: 2013-xx-yy
* Release version 5.2.5 Expected "soon".
** Main changes: (including other products affected)
** Main changes: Bug fixes, most important is the fix for hanging gridftp server processes, http://jira.globus.org/browse/GT-428, also many IGE/EGCF provided patches have been accepted upstream.
** Other information:  
** Other information: No tags mad in CVS yet, so it will still take a few days, but the above mentioned bug that was blocking the release is reported fixed.


== QCG ==
== QCG ==
* Release version w.k.j Expected on: 2013-xx-yy
* Release version 3.2.0 Expected on: 2013-11-15
** Main changes: (including other products affected)
** Main changes:  
** Other information:  
*** SHA2 support
*** integration with EGI Information System (if we manage to implement this).
*** many improvements in QCG-SimpleClient
**** configurable columns in qcg-list tool
**** new #QCG directive in job description (#QCG include)
**** qcg-resub - command
** Other information:
'''IMPORTANT:''' We are waiting for new Verification Criteria for QCG services.


= Other topics =
= Other topics =
== EPEL testing ==
== EPEL testing ==
Successfully created the following entries in the UMD provisioning process:
* DPM 1.8.7
* LFC 1.8.7
Upcoming:
* dcap
Small wiki page available to describe the information needed to create an entry from EPEL: [[EPEL as a source for UMD]]
== Keep Product ID cards up to date ==
Product teams should keep the [[URT:UMD_products_ID_cards]] up to date. In particular PTs who are releasing not in the EMI/IGE repositories anymore. For example, if the product components are split across EPEL and EMI (metapackage, yaim components..), add: "EPEL, EMI"


= AOB =  
= AOB =  
* Update about the Quality Criteria document to be circulated during the week through the ML.
* Next meeting: 4 November 2013 15:00


- Next meeting: 4 November 2013 15:00
= Minutes =
 
Minutes available on the [https://indico.egi.eu/indico/materialDisplay.py?materialId=minutes&confId=1910 indico page] of the meeting.
= Audio conference details =
= Audio conference details =
<i>
<i>

Latest revision as of 13:41, 4 November 2013

Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page


UMD releases status

Status of the products verification/staged rollout

  • dCache 2.2.17 is struggling to find early adopters. Apparently many sites are planning to move to 2.6.x (which should be good)

Ready for the release

  • UMD 2 update
    • GSIssh v.5.3.9
    • CREAM GE v2.0.2
    • BDII Top and Core
    • DPM 1.8.6


Issues found during release preparation

During the verification of the last emi-wn we encountered a problem with the missing 32bits libraries cumming from lcg_utils. This issue was partially solved after the PT sent the list of the update 32bits libraries also update since one of this 32bits libraries asked for a dependency of another 32bits libraries from another PT (grid-site). Conclusion we needed to redo 4 PPA' s (WN, UI, gride-site and lcg_utils) which was time consuming and stressful.

Our release process doesn't automatically fetch all the necessary RPM from EPEL (otherwise we will fetch other dependencies not directly released by the PTs) meaning we always need an correct list of RPM's for each release even the 32 bits (not the full 32 bits list but only the 32bits rpm's needed by the 64 bits version).

Updates from the product teams

This section is directly contributed by the product teams. Please, add under your section the scheduled releases with a short comment about the updates introduced and where they are going to be released (EMI repositories, EPEL, private repositories ecc), linking external pages with these information is ok, but please add at least the expected date of the next release. It is important to discuss, within the URT, changes that may affect directly or indirectly other products. The text will be copied into the agenda of the next URT meeting, PT will just need to check that all the information are up to date. Please, feel free to alter the template if it doesn't feet with your needs.

APEL

  • Release version x.y.z Expected: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

ARC

  • Release 13.11 version 4.0.0 Expected: 2013-11-09
    • Main changes: Major release, new BDB job storage, new infosys startup scripts, direct DQ2 support, improved WebDAV support, improved proxy handling
    • Other information: RC1 expected to be tagged 21-10-2013

Argus

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

dCache

  • dCache Release Schedule
    • Main changes: dcap client removed from EMI repos, now all dcap available via EPEL for SL5/SL6
    • new Releases for UMD-2 dcache-server 2.2 and UMD-3 dcache-server 2.6 planned
    • Other information:

DPM/LFC

GFAL/lcg_utils

  • Release version: 1.16.0 has been released to EPEL

FTS

  • Release version FTS3 (v3.1) is available in EPEL
    • Main changes:
    • Other information:

BDII

  • Release version:
    • Main changes:
    • Other information:

EMIR

  • Release version:
    • Main changes:
    • Other information:

UNICORE

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

LB

Gridsite

  • Release version:
    • Main changes:
    • Other information:


Proxyrenewal

  • Release version:
    • Main changes:
    • Other information:

CANL

  • Release version:
    • Main changes:
    • Other information:

gLite- security

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

CREAM

STORM

  • Next release: Oct. 2013
    • STORM 1.11.3 (EMI 3)
    • Main changes:
      • Mainly WebDAV issues
    • Other information:

VOMS


WMS


Globus

  • Release version 5.2.5 Expected "soon".
    • Main changes: Bug fixes, most important is the fix for hanging gridftp server processes, http://jira.globus.org/browse/GT-428, also many IGE/EGCF provided patches have been accepted upstream.
    • Other information: No tags mad in CVS yet, so it will still take a few days, but the above mentioned bug that was blocking the release is reported fixed.

QCG

  • Release version 3.2.0 Expected on: 2013-11-15
    • Main changes:
      • SHA2 support
      • integration with EGI Information System (if we manage to implement this).
      • many improvements in QCG-SimpleClient
        • configurable columns in qcg-list tool
        • new #QCG directive in job description (#QCG include)
        • qcg-resub - command
    • Other information:

IMPORTANT: We are waiting for new Verification Criteria for QCG services.

Other topics

EPEL testing

Successfully created the following entries in the UMD provisioning process:

  • DPM 1.8.7
  • LFC 1.8.7

Upcoming:

  • dcap

Small wiki page available to describe the information needed to create an entry from EPEL: EPEL as a source for UMD

Keep Product ID cards up to date

Product teams should keep the URT:UMD_products_ID_cards up to date. In particular PTs who are releasing not in the EMI/IGE repositories anymore. For example, if the product components are split across EPEL and EMI (metapackage, yaim components..), add: "EPEL, EMI"

AOB

  • Update about the Quality Criteria document to be circulated during the week through the ML.
  • Next meeting: 4 November 2013 15:00

Minutes

Minutes available on the indico page of the meeting.

Audio conference details

Room link: http://connect.ct.infn.it/egi-inspire-sa1/

Please provide you Name and product team/affiliation as Guest Name.

In left top corner you will find "Meeting->Audio Setup Wizard" Button which will help you to configure your audio.

You can test Your Computer with this link http://connect.ct.infn.it/common/help/en/support/meeting_test.htm

Adobe Connect tutorials: http://tv.adobe.com/show/learn-adobe-connect-8/

Adobe connect is flash-based, please if you have issues with your configuration try Chrome as browser.

Back to the URT agendas list page: URT_meetings_agendas