Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

URT:Agenda-10-06-2013

From EGIWiki
Revision as of 09:35, 10 June 2013 by Malandes (talk | contribs) (→‎BDII)
Jump to navigation Jump to search
Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page


UMD releases status

Next UMD releases

Status of the products verification/staged rollout

For UMD-3 a comprehensive view can be found in this RT dashboard. Please note that the page could take time to load.

UMD-3: Products recently verified

UMD-3: Products in staged rollout

UMD-3: Products ready for the next UMD release

UMD-2: General status of new updates

Updates from the product teams

This section is directly contributed by the product teams. Please, add under your section the scheduled releases with a short comment about the updates introduced and where they are going to be released (EMI repositories, EPEL, private repositories ecc), linking external pages with these information is ok, but please add at least the expected date of the next release. It is important to discuss, within the URT, changes that may affect directly or indirectly other products. The text will be copied into the agenda of the next URT meeting, PT will just need to check that all the information are up to date. Please, feel free to alter the template if it doesn't feet with your needs.


APEL

  • Release version x.y.z Expected: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

ARC

  • Release version x.y.z Expected: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

Argus

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

DPM/LFC

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

GFAL/lcg_utils

This release depends on Davix 0.2 (initial preview version of http/webdav toolkit) which is under EPEL review. It will take 2-3 weeks to be reviewed and released and then few more days to release GFAL.

FTS

FTS 3 is about to be released in EPEL testing where it will stay for at least a couple of weeks.

BDII

  • Release version: Update 2 Expected on: end of July 2013

This is a minor release to fix a security vulnerability and implement some enhancements in both BDII configuration and glue-validator.

UNICORE

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

LB

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

Gridsite

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

Proxyrenewal

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

CANL

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

gLite- security

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

CREAM

  • Release version 1.15.2 Expected on: 2013-05-30
    • Main changes:
      • Increased default size for CREAM log files
      • Removed spurious files for CREAM-ES and CEMonitor when those services are not enabled
      • Reduced number of tomcat restart in YAIM
    • Other information:

STORM

  • Release version 1.11.1 Expected on: 2013-05-27
    • Main changes:
      • StorM publishes wrong values for storage area sizes in the information system
      • Change GPFS Quota Job to leverage native quota info call
      • Ensure storm-gridhttps-server starts automatically on boot
      • Duplicate PtG on a file incorrectly marks it as busy
      • Ensure StoRM services RPM packaging requires OpenJDK
      • Improve PROPFIND performance
    • Other information:

VOMS

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

WMS

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

Globus

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

QCG

  • Release version 3.0.x Expected on: 2013-06-30
    • Main changes: Candidate for the first UMD release
    • Other information: RPMs SL6/6 of three main QCG components (QCG-Broker, QCG-Computing, QCG-Notifications including dependencies) and QCG-BrokerClient. The release will be published using the offical QCG repository: http://www.qoscosgrid.org/qcg-packages/sl5/x86_64/


Status of the PT ID Cards

Status of the SHA-2 baseline versions page

Audio conference details

Room link: http://connect.ct.infn.it/egi-inspire-sa1/

Please provide you Name and product team/affiliation as Guest Name.

In left top corner you will find "Meeting->Audio Setup Wizard" Button which will help you to configure your audio.

You can test Your Computer with this link http://connect.ct.infn.it/common/help/en/support/meeting_test.htm

Adobe Connect tutorials: http://tv.adobe.com/show/learn-adobe-connect-8/

Adobe connect is flash-based, please if you have issues with your configuration try Chrome as browser.