Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

URT:Agenda-04-11-2013

From EGIWiki
Jump to navigation Jump to search
Audio conference link Conference system is Adobe Connect, no password required.
Audio conference details Indico page


UMD releases status

Status of the products verification/staged rollout

  • UI v. 3.0.3 / WN v. 3.0.1
    • Canl v. 2.1.4
    • Gridsite v. 2.1.3
  • CREAM-CE v. 1.16.2
    • BLAH 1.20.3
  • EMI.arc-ce.sl6.x86_64-3.0.3
  • LFC v. 1.8.7
  • Emi-cluster v. 2.0.1
  • IGE security-integration v. 3.0.0
  • IGE globus-default-security v. 5.2.4
  • Unicore-hila v. 2.4.0


Ready for the release

  • Cream-torque v. 2.1.1
  • ProxyRenewal (Px) v. 1.3.34
  • Gridway.sl5.x86_64-5.14.1
  • Dpm.sl6.x86_64-1.8.7
  • Bdii-top.sl5.x86_64-1.1.3
  • Bdii-core.sl5.x86_64-1.5.4

Updates from the product teams

This section is directly contributed by the product teams. Please, add under your section the scheduled releases with a short comment about the updates introduced and where they are going to be released (EMI repositories, EPEL, private repositories ecc), linking external pages with these information is ok, but please add at least the expected date of the next release. It is important to discuss, within the URT, changes that may affect directly or indirectly other products. The text will be copied into the agenda of the next URT meeting, PT will just need to check that all the information are up to date. Please, feel free to alter the template if it doesn't feet with your needs.

APEL

  • Release version x.y.z Expected: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

ARC

  • Release 13.11 version 4.0.0 Expected: 2013-11-09
    • Main changes: Major release, new BDB job storage, new infosys startup scripts, direct DQ2 support, improved WebDAV support, improved proxy handling
    • Other information: RC2 expected to be tagged this week

Argus

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

dCache

  • dCache Release Schedule
    • Main changes: dcap client removed from EMI repos, now all dcap available via EPEL for SL5/SL6
    • new Releases for UMD-2 dcache-server 2.2 and UMD-3 dcache-server 2.6 planned
    • Other information:

DPM/LFC

GFAL/lcg_utils

  • Release version: 1.16.0 has been released to EPEL

FTS

  • Release version FTS3 (v3.1) is available in EPEL
    • Main changes:
    • Other information:

BDII

  • Release version:
    • Main changes:
    • Other information:

EMIR

  • Release version:
    • Main changes:
    • Other information:

UNICORE

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

LB

Gridsite

  • Release version:
    • Main changes:
    • Other information:


Proxyrenewal

  • Release version:
    • Main changes:
    • Other information:

CANL

  • Release version:
    • Main changes:
    • Other information:

gLite- security

  • Release version w.k.j Expected on: 2013-xx-yy
    • Main changes: (including other products affected)
    • Other information:

CREAM

STORM

  • Next release: Oct. 2013
    • STORM 1.11.3 (EMI 3)
    • Main changes:
      • Mainly WebDAV issues
    • Other information:

VOMS


WMS


Globus

  • Release version 5.2.5 Expected "soon".
    • Main changes: Bug fixes, most important is the fix for hanging gridftp server processes, http://jira.globus.org/browse/GT-428, also many IGE/EGCF provided patches have been accepted upstream.
    • Other information: No tags mad in CVS yet, so it will still take a few days, but the above mentioned bug that was blocking the release is reported fixed.

QCG

  • Release version 3.2.0 Expected on: 2013-11-15
    • Main changes:
      • SHA2 support
      • integration with EGI Information System (if we manage to implement this).
      • many improvements in QCG-SimpleClient
        • configurable columns in qcg-list tool
        • new #QCG directive in job description (#QCG include)
        • qcg-resub - command
    • Other information:

Other topics

QC Document v6 released

The new QC document is ready to be used in verification. Available on HitHub. This release simplifies the verification process by reducing the number of criteria to check and by letting verifiers decide what functionality to test depending on the available effort and type of release.

Along with the QC document, there is also some complementary information:

Verifiers should start using them for any new products released. Please use the verifiers (sw-rel-qc@mailman.egi.eu) or the URT mailing list for questions doubts on the process.

Everything is linked from the verifiers guideline, so this is the main link to keep in mind.

AOB

Minutes

Audio conference details

Room link: http://connect.ct.infn.it/egi-inspire-sa1/

Please provide you Name and product team/affiliation as Guest Name.

In left top corner you will find "Meeting->Audio Setup Wizard" Button which will help you to configure your audio.

You can test Your Computer with this link http://connect.ct.infn.it/common/help/en/support/meeting_test.htm

Adobe Connect tutorials: http://tv.adobe.com/show/learn-adobe-connect-8/

Adobe connect is flash-based, please if you have issues with your configuration try Chrome as browser.

Back to the URT agendas list page: URT_meetings_agendas