Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Transition

From EGIWiki
Jump to navigation Jump to search

Staged rollout process during the transition phase

This page is oriented to the EA sites, and describe the workflow for SR during this phase.

The page Early Adopters contain a table showing the EA sites and the components they do SR.

  • The EA will work on the savannah project jra1mdw on the standard patches.

These patches contain the tracking of "node types" or metapackages. [https://savannah.cern.ch/patch/?group=jra1mdw]

  • The site is notified by savannah when the SR coordinator triggers a state transition
Ready for rollout -> Rolling out
  • The patch contains the release notes that should be used by the EA.
  • The delta repos will still be created, so that's what EA's will use in

the installation/upgrade.

  • The patch will contain a comment field with a simplified report template,

which each EA doing the SR for a given node should fill (copy/paste it to a new comment)

  • This means that EA's will work on the patch, if there are more than one EA

doing SR on a node/metapackage, they all should work on the same savannah jra1mdw patch.