TSA2.5 Deployed Middleware Support Unit

From EGIWiki
Jump to navigation Jump to search

Purpose

The purpose of DMSU work is twofold: to find solution to middleware-related problems problems which do not require changes in code, documentation, ... (whatever is released by the TP), and to provide thorough analysis, yielding well-specified bug report otherwise.

DMSU also carries sufficient expertise to provide emergency fixes to middleware problems in the unlikely case the TP fails to deliver, for whatever reason.

People and expertise

DMSU_People_Institutes page provides the list of people with their expertise.

Interaction with TPM and 3rd line support

All accountable interaction with DMSU on middleware issues happens through assignment of GGUS tickets.

TPM

TPM assigns tickets to DMSU to start handling them.

DMSU may reassign a ticket back to TPM when it appears not to be a middleware issues. In this case, clear description of the reason for assigning back must be given in the comment.

3rd line support units

DMSU assigns tickets 3rd line support unit when it is confirmed that solving the issue requires changes to some artifact released by the TP (code, documentation, default configuration etc.).

Exceptionally, a ticket can be reassigned if DMSU lacks the required expertise.

In both cases, the last DMSU comment on the ticket should contain summary of the problem and its analysis (unless the history of the ticket is very brief).

3rd line support unit can reassign back to DMSU if it turns out that the issue was easy to solve, and no fix in any artefact is required, therefore the issue should have been fixed by DMSU. In this case, description of the reason of assigning back (e.g. pointers to appropriate documentation) must be given.

On top priority and very urgent tickets 3rd line support are expected to assign ETA (details bellow). DMSU checks ETA assignment, and it may trigger its renegotiation.

If the 3rd line support finds a workaround which may lead to lowering priority, DMSU must be informed, and the change in priority must be approved (eventually after consulting EGI operations).

Ticket priorities

In GGUS, tickets are classified to 4 priority levels. Middleware ticket handling in DMSU and 3rd line support differs according to their priority as described bellow.

Top Priority

Issues which affect the entire infrastructure, its significant portion, or a very large number of users, with paralyzing impact. Immediate reaction is required.

DMSU reaction -- immediate within working hours. DMSU work is restricted for the sake of speed, mostly to assessment whether the ticket really deserves Top-priority category. Once this is confirmed, the appropriate 3rd line support unit is involved (to get an early warning). In general, no thorough, time-consuming analysis is done, and the ticket is reassigned to 3rd line quickly.

TP reaction -- typically, SLA guarantees 4 hour reaction. The reaction should contain estimation of ETA (Estimated Time of Arrival of the fix). The time is not formally bounded, however, it should be within a few days; fix of a top-priority issue triggers an emergency release typically.

ETA monitoring the top priority tickets are quite rare, currently we evaluate ETA manually.

Very Urgent

Issues of broad impact, where no workaround is known or feasible.

DMSU reaction -- preferably on the same day, the ticket handling guidelines above apply, however, the ticket should not be delayed for more than 2 working days before reassignment to 3rd line.

TP reaction -- typically, SLA guarantees 2 working days. ETA specification is required again. The problem is expected to be fixed in 45 days (as a safe upper limit), typically in the next scheduled bugfix release.

ETA monitoring -- support in GGUS will be required, to be negotiated, though not urgent, the number of very-urgent tickets is quite low too.

Urgent

Issues of impact on significant user community, however, affecting only some patterns of their work, and with a workaround generally available.

DMSU reaction -- preferably in 2 working days to assess the priority and in 5 working days to produce first results of the ticket analysis.

TP reaction -- typically, SLA guarantees 5 working days. The fix is scheduled according to the actual release plan of the TP. The only requirement is that urgent issues should precede less urgent ones.

ETA monitoring -- no ETA assigned.

Less Urgent

Less significant issues with either easy workaround or marginal impact.

DMSU reaction -- within 2 weeks to produce first results of the ticket analysis.

TP reaction -- typically, SLA guarantees 15 working days. Less urgent issues are fixed on the best effort basis.

ETA monitoring --- no ETA assigned.

Followup of tickets with 3rd line support units

Besides handling the incoming tickets DMSU also performs elementary followup of the tickets assigned to the 3rd line. This work is restricted (due to limited available effort) to checking high priority categories, and to basic aggregate checks on others.

Approach to the ticket is differentiated according to their priority:

Top Priority and Very Urgent

Experience shows that these priority levels are very rare, top priority occurs only once per several months, and there are only upto few dozens very urgent ones per year. Therefore it is feasible to give special care to these tickets, including manual one-by-one followup.

When such ticket is assigned to 3rd line, the TP is obliged, withing the reaction time given by SLA, to assign ETA to the ticket. Assignment of ETA is essential for EGI Operation to plan accordingly (e.g. whether to deploy emergency workarounds).

The assignment of ETA is checked by DMSU.

When the ETA time arrives, DMSU checks whether the fix was delivered. If not, TP is requested to provide a new estimate and an appropriate justification. If there are doubts, the tickets can be escalated to TCB.

Urgent and Less Urgent

The process described bellow is tentative, and further discussion is required.

On the contrary, there are typically 200 tickets of these priorities handled by DMSU every quarter. These numbers make any one-by-one followup in a centralized way not reasonable.

It's agreed that solving all submitted tickets may also reach beyond the capabilities of TP. Therefore the Fedora approach of closing low-priority tickets on major release, regardless of the fix availability, is taken. This is a tradeoff approach, avoiding the ever-increasing backlog of tickets. If the reported problems persist in the new release, and users are still affected, they are expected to submit new tickets.

More specifically, the following is expected from TP (assuming the major release at month X):

  1. When a fix is available in a revision or minor release, the ticket is closed as solved.
  2. Before a major release, e.g. at month X-1, the TP is expected to run a pre-release campaign on all open tickets.
  3. Issues that can be solved with feasible effort are fixed in this campaign and the fixes are scheduled for the upcoming major release.
  4. All issues submitted earlier than month X-1 are closed as unsolved once the release is available.

This round should happen for major releases, and it is optional for minor ones. We also require that it is done at least once per year if major releases are less frequent. As long as the process is followed, every major release is started with a clean table.

Finally, DMSU checks, at time point X+delta, i.e. well after the release, that there are no open tickets submitted before X-1.

Internal ticket handling guidelines

  • The first mandatory step of DMSU work on a ticket is understanding what is the reason of the reported problem. The outcome of the analysis is documented with the ticket, preferably as a response to the user. The analysis may or may not include thorough reproduction of the problem; it is left to common sense.
  • During the analysis DMSU also assesses the priority of the ticket (see bellow) and adjusts Type of problem and Ticket category fields eventually.
  • Typically, the analysis involves communication with the users. DMSU sets ticket state to Waiting-for-reply whenever expecting feedback by the user. It is foreseen GGUS will implement automatic switch to In-progress when the user answers.
  • DMSU expertise should cover most tickets. When necessary developers (i.e. the 3rd line support) can be involved for brief consultation. As long as no considerable effort is required from the 3rd line support, the control on the ticket is still kept within DMSU, i.e. the ticket is not reassigned to another support unit. On the other hand, tough issues when DMSU expertise runs out should be still reassigned.
  • If solution of the problem does not induce changes in code, documentation, default configuration etc., i.e. release of anything by the technology provider, DMSU closes the ticket.
  • Otherwise, the ticket is reassigned to the appropriate 3rd line support unit. In this case, the most recent comment (i.e. on reassignment) should contain a brief summary of the DMSU analysis on the ticket, pointing to what is wrong exactly, how to reproduce the problem etc., so that 3rd line supporters don't have to gather all information from the ticket correspondence, which tends to be rather long.

A special case are tickets that were solved in DMSU but they require comment by th 3rd line, i.e. to confirm feasibility of the solution. Those tickets should be closed in DMSU just with a comment indicating the 3rd line was contacted, and the 3rd line approached by other means. The standard GGUS workflow must not be used for this communication, in order to keep the statistics clean, mostly.

If a ticket is wrongly assigned to 3rd line support, i.e. the problem is quite simple and it should have been solved by DMSU preferably, then:

  • 3rd line support reassign back the ticket to DMSU. A comment pointing to appropriate documentation or giving justification why this is a trivial issue must be given in this case.
  • this mechanism will be used as a metric of DMSU failures, and checked thoroughly, therefore it should not be abused.

When the user does not react on a raised question, she is typically reminded weekly, on the DMSU meetings. If there is no reaction for more than one month, the ticket is closed as unsolved.


DMSU shifts

The main purpose of DMSU shift is no surprise: keep the things running, not to leave an important issue without fast reaction etc.

The shifts are held by groups of people with expertise on different middleware stacks. However, due to the prevailing gLite-related traffic in DMSU only gLite shifts are formally organized currently, the other stacks are handled on the best effort basis.

The specific duties of the person on shift are:

  • to follow incoming emails from GGUS, being able to react within approx. 2 hours in normal working hours
  • to identify "top priority" and "very urgent" issues, not only by the priority set by the submitter but also by using common sense, and to make sure an appropriate expert starts looking into the issue; this includes assigning the ticket to a specific person
  • to keep checking that there is reasonable response time, namely as a reaction to further submitter's correspondence; it should be almost immediate on "top priority", and we can probably afford upto 1 week for "less urgent"

One person holds the shift for one week, the duty is passed to the other on Monday afternoon.

Shift schedule

Dec 5 Zdeněk Salvet
Dec 12 INFN
Dec 19 Aleš Křenek
Dec 26 best effort
Jan 2 Aleš Křenek
Jan 9 Alessandro Paolini
Jan 16 Zdeněk Salvet
Jan 23 Sergio Traldi
Jan 30 Aleš Křenek
Feb 06 Sara Bertocco
Feb 13 Zdeněk Salvet

DMSU Digests

Brief description and indexing of issues solved within DMSU that are likely to have broader impact on EGI Operations.

Maintained on separate page Middleware_issues_and_solutions

Operations Documentation

DMSU contributes to maintenance of EGI Operations_Manuals, in particular


Systems available for DMSU

In order to debug issues and design workaround availability to some systems is needed. DMSU_machines page contains the list of systems available for the DMSU staff per partner.

Obsolete stuff

DMSU_Old_Stuff

Not used anymore but keeping the old links here.