Difference between revisions of "Service for AAI: EGI Catchall Availability and continuity Plan"

From EGIWiki
Jump to navigation Jump to search
 
(20 intermediate revisions by 2 users not shown)
Line 14: Line 14:
|-
|-
! scope="row"| Risks assessment
! scope="row"| Risks assessment
| 2018-10-24
| 2021-07-02
| Q4 2019
| Q3 2022
|-
|-
! scope="row"| Av/Co plan
! scope="row"| Av/Co plan
| 2018-11-07
| 2021-07-02
| Q4 2019
| Q3 2022
|-
|-
|}
|}
Line 31: Line 31:
*Reliability 99%
*Reliability 99%


<pre style="color: blue"> Other availability requirements:
Other availability requirements:
- the service is accessible through X509 certificate and/or other authentication system
* the service is accessible through X509 certificate
- The service is accessible via CLI and/or webUI
* The service is accessible via CLI and/or webUI
- (depending on the service, specific requirements can be identified. In case, for each requirement report what is the action/measure in case of failure)


The service availability is regularly tested by nagios probe eu.egi.VOMS-CertValidity: https://argo-mon.egi.eu/nagios/cgi-bin/status.cgi?host=voms2.hellasgrid.gr&style=detail
The service availability is regularly tested by nagios probe ''eu.egi.VOMS-CertValidity'': https://argo-mon.egi.eu/nagios/cgi-bin/status.cgi?host=voms2.hellasgrid.gr&style=detail
</pre>


The performances reports in terms of Availability and Reliability are produced by [http://egi.ui.argo.grnet.gr/egi/OPS-MONITOR-Critical ARGO] on an almost real time basis and they are also periodically collected into the [https://documents.egi.eu/public/ShowDocument?docid=2324 Documentation Database].
The performances reports in terms of Availability and Reliability are produced by [http://argo.egi.eu/egi/OPS-MONITOR-Critical ARGO] on an almost real time basis and they are also periodically collected into the [https://documents.egi.eu/public/ShowDocument?docid=2324 Documentation Database].


Over the past years, '''EGI Catchall''' hadn't particular Av/Co issues highlighted by the performances that need to be further investigated.
Over the past years, '''EGI Catchall''' hadn't particular Av/Co issues highlighted by the performances that need to be further investigated.
Line 45: Line 43:
= Risks assessment and management =
= Risks assessment and management =


For more details, please look at the [https://docs.google.com/spreadsheets/d/18d2kEdrXFScD2U-JDD344TFx82iCw8WGo0pEWHDw0j8/edit#gid=754960400 google spreadsheet]. We will report here a summary of the assessment.
For more details, please look at the [https://docs.google.com/spreadsheets/d/139SKSKIUjztWKGLbMgBW2NGX9J763mAZvnLCPy8kGss/edit#gid=1081336570 google spreadsheet]. We will report here a summary of the assessment.


== Risks analysis ==
== Risks analysis ==
<pre style="color: blue"> to update </pre>
{| class="wikitable"
{| class="wikitable"
! Risk id
! Risk id
Line 63: Line 58:
| Service unavailable / loss of data due to hardware failure
| Service unavailable / loss of data due to hardware failure
| VOMS database, MyProxy proxy files
| VOMS database, MyProxy proxy files
| The VOMS database and the MyProxy proxy directory are regularly backuped. Additionally, they are running on a redundant VM environment, on a redundant storage  
| The VOMS database and the MyProxy proxy directory are regularly backuped (reactive). Additionally, they are running on a redundant VM environment, on a redundant storage (preventive)
| style="background: green"| Low  
| style="background: green"| Low  
| Service restored from backups
| Service restored from backups
Line 71: Line 66:
| Service unavailable / loss of data due to software failure
| Service unavailable / loss of data due to software failure
| VOMS database, MyProxy proxy files
| VOMS database, MyProxy proxy files
| The VOMS database and the MyProxy proxy directory are regularly backuped. Additionally, they are running on a redundant VM environment, on a redundant storage
| The VOMS database and the MyProxy proxy directory are regularly backuped (reactive). Additionally, they are running on a redundant VM environment, on a redundant storage (preventive)
| style="background: green"| Low  
| style="background: green"| Low  
| Service restored from backups
| Service restored from backups
Line 79: Line 74:
| service unavailable / loss of data due to human error
| service unavailable / loss of data due to human error
| VOMS database, MyProxy proxy files
| VOMS database, MyProxy proxy files
| The VOMS database and the MyProxy proxy directory are regularly backuped. Additionally, they are running on a redundant VM environment, on a redundant storage
| The VOMS database and the MyProxy proxy directory are regularly backuped (reactive). Additionally, they are running on a redundant VM environment, on a redundant storage (preventive)
| style="background: green"| Low  
| style="background: green"| Low  
| Service restored from backups
| Service restored from backups
Line 87: Line 82:
| service unavailable for network failure (Network outage with causes external of the site)
| service unavailable for network failure (Network outage with causes external of the site)
| VOMS, MyProxy
| VOMS, MyProxy
| There are redundant uplinks connecting the data center to the public network.
| There are redundant uplinks connecting the data center to the public network (preventive).
| style="background: yellow"| Medium  
| style="background: yellow"| Medium  
| Service restored from backups
| GRNET NOC will take actions for restoring the network connection
| 1 working day
| 1 working day
|-
|-
Line 95: Line 90:
| Unavailability of key technical and support staff (holidays period, sickness, ...)
| Unavailability of key technical and support staff (holidays period, sickness, ...)
| VOMS, MyProxy
| VOMS, MyProxy
| There is always one member of the team available.  
| There is always one member of the team available (preventive).  
| style="background: green"| Low  
| style="background: green"| Low  
| -
| -
Line 103: Line 98:
| Major disruption in the data centre. Fire, flood  or electric failure for example
| Major disruption in the data centre. Fire, flood  or electric failure for example
| VOMS database, MyProxy proxy files
| VOMS database, MyProxy proxy files
| The data center is well maintained, with UPS, diesel generator and fire suppression system.  
| The data center is well maintained, with UPS, diesel generator and fire suppression system (preventive).  
| style="background: yellow"| Medium
| style="background: yellow"| Medium
| Service restored from backups
| Service restored from backups
Line 111: Line 106:
| Major security incident. The system is compromised by external attackers and needs to be reinstalled and restored.
| Major security incident. The system is compromised by external attackers and needs to be reinstalled and restored.
| VOMS database, MyProxy proxy files
| VOMS database, MyProxy proxy files
| The VOMS database and the MyProxy proxy directory are regularly backuped.
| The VOMS database and the MyProxy proxy directory are regularly backuped (reactive).
| style="background: green"| Low  
| style="background: green"| Low  
| Service restored from backups
| Service restored from backups
Line 119: Line 114:
| (D)DOS attack. The service is unavailable because of a coordinated DDOS.
| (D)DOS attack. The service is unavailable because of a coordinated DDOS.
| VOMS, MyProxy
| VOMS, MyProxy
| The network is monitored for DDOS attacks by GRNET NOC.
| The network is monitored for DDOS attacks by GRNET NOC (reactive).
| style="background: yellow"| Medium   
| style="background: yellow"| Medium   
| Service restored from backups
| GRNET NOC will take proper actions
| 1 working day
| 1 working day
|}
|}


== Additional information ==
== Outcome ==
<pre style="color: blue">
- procedures for the several countermeasures to invoke in case of risk occurrence (put a link if public)


- the Availability targets don't change in case the plan is invoked.
The level of all the identified risks is acceptable and the countermeasures already adopted are considered satisfactory


- recovery requirements:
== Additional information ==
-- Maximum tolerable period of disruption (MTPoD) (the maximum amount of time that a service can be unavailable or undelivered after an event that causes disruption to operations, before its stakeholders perceive unacceptable consequences): 2 days
-- Recovery time objective (RTO) (the acceptable amount of time to restore the service in order to avoid unacceptable consequences associated with a break in continuity (this has to be less than MTPoD)): 1 day
-- Recovery point objective (RPO) (the acceptable latency of data that will not be recovered): 2 days


- approach for the return to normal working conditions as reported in the risk assessment.
* procedures for the several countermeasures to invoke in case of risk occurrence are available to the component provider
</pre>
* the Availability targets don't change in case the plan is invoked.
 
* recovery requirements:
== Outcome ==
** Maximum tolerable period of disruption (MTPoD) (the maximum amount of time that a service can be unavailable or undelivered after an event that causes disruption to operations, before its stakeholders perceive unacceptable consequences): 5 days
<pre style="color: blue"> to update </pre>
** Recovery time objective (RTO) (the acceptable amount of time to restore the service in order to avoid unacceptable consequences associated with a break in continuity (this has to be less than MTPoD)): 3 days
 
** Recovery point objective (RPO) (the acceptable latency of data that will not be recovered): n.a.
The level of all the identified risks is acceptable and the countermeasures already adopted are considered satisfactory
* approach for the return to normal working conditions as reported in the risk assessment.


= Availability and Continuity test =
= Availability and Continuity test =
<pre style="color: blue"> to update </pre>


The critical level of this service is low.
The critical level of this service is low.


Taking into account the availability and continuity measures adopted by the provider, and considering that the VOMS and MyProxy services are quite easy to install, we don't require a continuity/recovery test for this service: the team has extensive experience with VOMS and is able to to install a new instance rapidly if its needed.
Taking into account the availability and continuity measures adopted by the provider, and considering that the VOMS and MyProxy services are quite easy to install, we don't require a continuity/recovery test for this service: the team has extensive experience with VOMS and is able to to install a new instance rapidly if it's needed.


= Revision History  =
= Revision History  =
Line 175: Line 164:
| starting the yearly review....
| starting the yearly review....
|-
|-
|
| <br>
| Alessandro Paolini
| 2020-03-18
| review completed, no changes
|-
| <br>
| Alessandro Paolini
| 2021-07-02
| yearly review completed, updated the risk assessment section
|-
|  
|  
|  
|  
|  
|  
|  
|}
|}

Latest revision as of 15:33, 2 July 2021

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security


Documentation menu: Home Manuals Procedures Training Other Contact For: VO managers Administrators


Back to main page: Services Availability Continuity Plans

Introduction

This page reports on the Availability and Continuity Plan for the EGI Catchall and it is the result of the risks assessment conducted for this service: a series of risks and treats has been identified and analysed, along with the correspondent countermeasures currently in place. Whenever a countermeasure is not considered satisfactory for either avoiding or reducing the likelihood of the occurrence of a risk, or its impact, it is agreed with the service provider a new treatment for improving the availability and continuity of the service. The process is concluded with an availability and continuity test.

Last Next
Risks assessment 2021-07-02 Q3 2022
Av/Co plan 2021-07-02 Q3 2022

Previous plans are collected here: https://documents.egi.eu/secure/ShowDocument?docid=3543

Performances

In the OLA it was agreed the following performances targets, on a monthly basis:

  • Availability: 95%
  • Reliability 99%

Other availability requirements:

  • the service is accessible through X509 certificate
  • The service is accessible via CLI and/or webUI

The service availability is regularly tested by nagios probe eu.egi.VOMS-CertValidity: https://argo-mon.egi.eu/nagios/cgi-bin/status.cgi?host=voms2.hellasgrid.gr&style=detail

The performances reports in terms of Availability and Reliability are produced by ARGO on an almost real time basis and they are also periodically collected into the Documentation Database.

Over the past years, EGI Catchall hadn't particular Av/Co issues highlighted by the performances that need to be further investigated.

Risks assessment and management

For more details, please look at the google spreadsheet. We will report here a summary of the assessment.

Risks analysis

Risk id Risk description Affected components Established measures Risk level Treatment Expected duration of downtime / time for recovery
1 Service unavailable / loss of data due to hardware failure VOMS database, MyProxy proxy files The VOMS database and the MyProxy proxy directory are regularly backuped (reactive). Additionally, they are running on a redundant VM environment, on a redundant storage (preventive) Low Service restored from backups 1 working day
2 Service unavailable / loss of data due to software failure VOMS database, MyProxy proxy files The VOMS database and the MyProxy proxy directory are regularly backuped (reactive). Additionally, they are running on a redundant VM environment, on a redundant storage (preventive) Low Service restored from backups 1 working day
3 service unavailable / loss of data due to human error VOMS database, MyProxy proxy files The VOMS database and the MyProxy proxy directory are regularly backuped (reactive). Additionally, they are running on a redundant VM environment, on a redundant storage (preventive) Low Service restored from backups 1 working day
4 service unavailable for network failure (Network outage with causes external of the site) VOMS, MyProxy There are redundant uplinks connecting the data center to the public network (preventive). Medium GRNET NOC will take actions for restoring the network connection 1 working day
5 Unavailability of key technical and support staff (holidays period, sickness, ...) VOMS, MyProxy There is always one member of the team available (preventive). Low - -
6 Major disruption in the data centre. Fire, flood or electric failure for example VOMS database, MyProxy proxy files The data center is well maintained, with UPS, diesel generator and fire suppression system (preventive). Medium Service restored from backups 1 or more working days
7 Major security incident. The system is compromised by external attackers and needs to be reinstalled and restored. VOMS database, MyProxy proxy files The VOMS database and the MyProxy proxy directory are regularly backuped (reactive). Low Service restored from backups 1 working day
8 (D)DOS attack. The service is unavailable because of a coordinated DDOS. VOMS, MyProxy The network is monitored for DDOS attacks by GRNET NOC (reactive). Medium GRNET NOC will take proper actions 1 working day

Outcome

The level of all the identified risks is acceptable and the countermeasures already adopted are considered satisfactory

Additional information

  • procedures for the several countermeasures to invoke in case of risk occurrence are available to the component provider
  • the Availability targets don't change in case the plan is invoked.
  • recovery requirements:
    • Maximum tolerable period of disruption (MTPoD) (the maximum amount of time that a service can be unavailable or undelivered after an event that causes disruption to operations, before its stakeholders perceive unacceptable consequences): 5 days
    • Recovery time objective (RTO) (the acceptable amount of time to restore the service in order to avoid unacceptable consequences associated with a break in continuity (this has to be less than MTPoD)): 3 days
    • Recovery point objective (RPO) (the acceptable latency of data that will not be recovered): n.a.
  • approach for the return to normal working conditions as reported in the risk assessment.

Availability and Continuity test

The critical level of this service is low.

Taking into account the availability and continuity measures adopted by the provider, and considering that the VOMS and MyProxy services are quite easy to install, we don't require a continuity/recovery test for this service: the team has extensive experience with VOMS and is able to to install a new instance rapidly if it's needed.

Revision History

Version Authors Date Comments

Alessandro Paolini 2018-11-02 first draft, discussing with the provider

Alessandro Paolini 2018-11-07 plan finalised

Alessandro Paolini 2019-11-26 starting the yearly review....

Alessandro Paolini 2020-03-18 review completed, no changes

Alessandro Paolini 2021-07-02 yearly review completed, updated the risk assessment section