The formal outputs from the project (milestones and deliverables) will pass through a formal review process. The review process is timed to ensure the output is available to the EC at the end of the project month (PM) that the material is due.
#REDIRECT [[EGI-InSPIRE:Review process for deliverables and milestones]]
 
*'''STEP1'''
 
Once the '''author''' has completed the  document, and put his/her name, the activity code and the date in the deliver slip on page 2, it should be uploaded to DocDB with all the metadata filled in. This is when the review process can start.
 
*'''STEP2'''
 
In the next step an RT ticket is created for the document by the '''Quality Officer''' in order to track the status of the document as it passes through the review process. This ticket should include the names of the moderators and reviewers together with the DocDB url(s) for the document itself and the review space.
 
*'''STEP3'''
 
The chosen '''moderators''' and '''reviewers''' are informed by e-mail by the '''Project Office''' about their duty, with a deadline for completing the task and the urls for the document and the feedback form.
 
*'''STEP4'''
 
'''Reviewers''' and '''moderators''' should upload their completed feedback forms to the related Feedback DocDB space (the url for this is always provided in the notification e-mail!). If the '''reviewer''' or '''moderator''' creates a new version of the revised document with comments and/or tracked changes, that should also be uploaded to the feedback space. It should NOT be uploaded by updating the original document. In each case the ‘’Add files’’ option must be used in the DocDB when uploading. '''Reviewers''' should notify the '''moderator''' when the feedback is available.
 
*'''STEP5'''
 
Once the feedback forms are available, the '''author''' should be notified by the '''moderator'''. The '''author''' should check them and provide responses to each of the reviewers’ comments on the feedback forms. The new versions with the responses included should also be uploaded to the DocDB feedback space by the '''author'''. The '''author''' should then include any necessary changes in the main document and produce a new version. This should be be uploaded with major changes tracked to the document space by the '''author'''. The '''author''' should then notify the '''moderator''' that a new version is available. The versions of the document must be recorded to the Document Log (page 2) by the '''author''' again.
 
*'''STEP6'''
 
The''' moderator''' should check the new version and ask the '''reviewers''' to confirm that their comments have been addressed to their satisfaction. If not, a second internal review round may be necessary. If the '''reviewers''' and '''moderator''' are happy, the moderator should notify the '''Quality Officer''', who can then update the ticket to move the document from ‘External Review’ to ‘AMB review’. The '''Quality Officer''' also has to make sure that the Delivery Slip of each document is filled in properly.
 
 
Once the review process has been completed, the '''Project Office''' will produce a PDF of the document and upload this to the document repository and submit the material to the EC.