Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "PROC19"

From EGIWiki
Jump to navigation Jump to search
(Deprecate page)
Tag: Replaced
 
(120 intermediate revisions by 6 users not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{Template:Doc_menubar}}{{Template:Under_construction}} {{TOC_right}}  
{{Template:Op menubar}} {{Template:Doc_menubar}}
 
[[Category:Deprecated]]
 
{| style="border:1px solid black; background-color:lightgrey; color: black; padding:5px; font-size:140%; width: 90%; margin: auto;"
 
| style="padding-right: 15px; padding-left: 15px;" |  
{{Ops_procedures
|[[File:Alert.png]] This page is '''Deprecated'''; the content has been moved to https://confluence.egi.eu/display/EGIPP/PROC19+Integration+of+new+cloud+management+framework+or+middleware+stack+in+the+EGI+Infrastructure
|Doc_title = Introducing new cloud stack and grid middleware in EGI Production Infrastructure
|Doc_link = [[PROC19|https://wiki.egi.eu/wiki/PROC19]]
|Version =
|Policy_acronym = OMB
|Policy_name = Operations Management Board
|Contact_group = operations-support@mailman.egi.eu
|Doc_status = DRAFT
|Approval_date =
|Procedure_statement = A procedure for the steps to introduce new cloud stack (Cloud platform) or grid middleware (Grid Platform) in EGI Production Infrastructure.
}}
 
 
 
= Overview  =
 
To assure production quality of EGI Infrastructure every stack (Cloud platform) or middleware (Grid Platform) supported by Production Resource Centres needs to fulfil certain requirements. The goal of this procedure is to assure EGI Infrastructure compliance.
 
= Definitions  =
 
*'''cloud stack''': software for creating, managing, and deploying infrastructure cloud services.
*'''grid middleware''': software which allows the users to execute jobs in grid infrastructure.
 
 
Please refer to the [[Glossary|EGI Glossary]] for the definitions of the terms used in this procedure.<br>
 
The key words "MUST", "MUST NOT", "REQUIRED", "SHALL", "SHALL NOT", "SHOULD", "SHOULD NOT", "RECOMMENDED", “MAY", and "OPTIONAL" in this document are to be interpreted as described in RFC 2119.
 
= Entities involved in the procedure  =
 
*'''Technology Provider team leader''':
*'''EGI Operations''':
*'''[[Operations_Management_Board|Operations Management Board]]''': EGI operations policy board
 
= Prerequisites =
 
= Steps  =
== Sending a request  ==
 
The requested can be send by:
# Resource Centre administrators
# Operations Centre
# EGI Operations
# Technology Provider team leader
 
== Validation  ==
 
 
 
== Integration steps  ==
 
 
 
 
Integration covers following areas:
 
#'''Management '''- integration with Grid Configuration Database [GOCDB] ([http://goc.egi.eu/ http://goc.egi.eu/])<br>
#*e.g. creation of a service type<br>
#'''Monitoring '''- integration with Service Availability Monitoring [SAM] <br>
#*development of monitoring probes <br>
#*integration of probes into SAM release<br>
#*integration of probes with Ava/Rel profile<br>
#'''Accounting '''- integration with EGI Accounting Infrastructure<br>
#*enabling all the accounting data to be collected in one place for a unified view<br>
#'''Support '''- integration with EGI Helpdesk [GGUS] ([http://ggus.eu http://ggus.eu])<br>
#*creation of support unit and using it to provide support<br>
#'''Dashboard '''- integration with Operations Portal ([http://operations-portal.egi.eu/ http://operations-portal.egi.eu/])
#*integration of probes into Operations Tests pool
#'''Documentation '''- integration with existing operations procedures <br>
#*integration with Resource Center OLA
#*integration with Resource Center registration and certyfication procedure
#**creation of how to manually test the middleware
#'''Information System''' - integration with EGI Information system
 
{| class="wikitable"
|-
! #
! Responsible
! Action
|- valign="top"
| 0
| RC
|
'''Contact your Resource Infrastructure Operations Manager''' (contact information is available at [http://www.egi.eu/community/resource-providers/ EGI web site]).
 
*Provide the required information according to the template available in the [[HOWTO01|Required information]] page.
 
|- valign="top"
| 1
| RP
|
'''Accept or reject registration request''' and communicate this result back to applicant.
 
*If the Resource Centre is accepted, notify the relevant Operations Centre, handle the Resource Centre information received, and put the Operations Centre in contact with the Resource Centre Operations Manager.
 
|- valign="top"
| 2
| OC
|
#'''Forward all documentation''':
#*[[HOWTO02|necessary to be read and accept]]
#*documentation how to install and configure the Resource Centre services
#Clarify any doubts or questions.
 
Include the Operations Centre ROD, CSIRT,&nbsp; or help-desk teams in the step if necessary.
 
|- valign="top"
| 3
| OC
|
#'''Add the Resource Centre to the [https://goc.egi.eu/ GOCDB]'''and flag it as "Candidate".
#*Only Regional Management level users (D') can add a site to the NGI and can update the certification status of the site, see [[GOCDB/Input System User Documentation#Roles]]
#Notify the Resource Centre Operations Manager that he/she should [[EGI Operations Start Guide#Joining_operations|Join operations]]
#*In the [https://goc.egi.eu/ GOCDB] he/she should request the 'Resource Centre Operations Manager' role. Approve it when done.
#Notify the Resource Centre Operations Manager that person responsible for security should [[EGI Operations Start Guide#Joining_operations|Join operations]]
#*In the [https://goc.egi.eu/ GOCDB] he/she should request the 'Resource Centre Security Officer' role. Approve it when done.
 
|- valign="top"
| 4
| RC
|
#'''Complete any missing information for the Resource Centre's entry in the GOCDB'''
#*It includs services that are to be integrated into the infrastructure. See [[Fedcloud-tf:WorkGroups:Scenario5#GOCDB|instruction]]
#Notify the Operations Centre that the Resource Centre information update is concluded.
#Note: If the external RC is considering buying host certs, please make sure they source them from an EGI recognised authority. [http://www.eugridpma.org/members/worldmap/ The local national CA] (usually for free or at flat rate) is likely the best source of their SSL certificates.
 
|- valign="top"
| 5
| OC
|
'''Check [http://goc.egi.eu/ GOC DB]''' that the Resource Centre's information is correct.
 
*Resource Centre (site) roles and any other additional information.
*Check that contacts receive email (if they are mailing lists, check that outside EGI members are allowed to post there). Site administrator MUST reply to the test email.<br>
*Check that the required services for a Resource Centre are properly registered.<br>
*Check domain names and forward and reverse DNS.
 
|- valign="top"
| 6
| OC
|
'''Any other Operations Centre-specific requirements''' (e.g. join a certain VO and/or mailing list, etc.)
 
|- valign="top"
| 7
| OC
|
If all previous actions have been completed with success, notify the Resource Centre Operations Manager that the Registration is completed, and contact the Resource Infrastructure Operations Manager to notify that a new candidate Resource Centre exists and is ready to be certified.
 
|}
|}
After the successful completion of all these steps, the registration phase is completed and the Resource Centre is ready for the start of the <span class="il">certification</span> phase.
= Revision History  =
{| class="wikitable"
|-
! Version
! Authors
! Date
! Comments
|-
| <br>
|
|
| <br>
|}
[[Category:Operations_Procedures]]

Latest revision as of 16:19, 23 August 2022