Difference between revisions of "PDT:MOU advancement"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1871 SAGA M4.1 The milestone is achieved by advertising the start of the collaboration (April 2011)] | *[https://rt.egi.eu/rt/Ticket/Display.html?id=1871 SAGA M4.1 The milestone is achieved by advertising the start of the collaboration (April 2011)] | ||
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1873 SAGA M1.1: Requires a report listing the inputs to the UMD Roadmap for the EGI-InSPIRE deliverable due in July 2011] | |||
=== Planned for next month === | === Planned for next month === |
Revision as of 11:58, 4 July 2011
MoU Advancement
Report for Jun 30
Achieved
Planned for next month
Late / Not Completed
Report for May 31
Achieved
- WeNMR A.5: A.3 Participation in UCB Alexandre Bonvin has attended these meetings and is documented in the UCB Minutes
Planned for next month
Late / Not Completed
Balazs will provide a report by 10th May 2011
This activity will not be done as there is another milestone to hold this kind of meeting at the TF, therefore, this one cannot be moved to there. StratusLab held a workshop and a training course as well as participated in the UVW in May, but each had a specified milestone marked as "achieved".
MoU Status
- MoU Status (Signed, Negotiation Phase, Planned, DocDB link, Process Owner, etc.)