Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "PDT:MOU advancement"

From EGIWiki
Jump to navigation Jump to search
Line 11: Line 11:
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2656 CHAIN M1.1 Roadmap for interoperation and integration aligned with the EGI Model and based on CHAIN’s understanding of Regional Grid Infrastructures (Sept 2011)]
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2656 CHAIN M1.1 Roadmap for interoperation and integration aligned with the EGI Model and based on CHAIN’s understanding of Regional Grid Infrastructures (Sept 2011)]


EGI takes over the  operations of the StratusLab virtual appliance Marketplace
beyond the end of the StratusLab project via a suitable partner (requires a report
led by Tiziana Ferrari, EGI.eu)
== Apr 2012  ==
=== Expected  ===
*[https://rt.egi.eu/guest/Ticket/Display.html?id=1946 StratusLab M7.2: EGI takes over the  operations of the StratusLab virtual appliance Marketplace
beyond the end of the StratusLab project via a suitable partner]
=== Achieved  ===
== Mar 2012  ==
=== Expected  ===
=== Achieved  ===


== Feb 2012  ==
== Feb 2012  ==


=== Expected  ===
=== Expected  ===
=== Achieved  ===
=== Achieved  ===


Line 60: Line 81:
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1515 IGE M4.2: Report on dissemination activities (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1515 IGE M4.2: Report on dissemination activities (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2883 SIENA M2.1: EGI-InSPIRE provides contribution to development of the SIENA cloud standards profile (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2883 SIENA M2.1: EGI-InSPIRE provides contribution to development of the SIENA cloud standards profile (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=3158 SHIWA M2.1: Advertise the start of the collaboration in each Party’s website with a dedicated static page and article or press release (Nov 2011)]
*[https://rt.egi.eu/rt/Ticket/Display.html?id=3158 SHIWA M2.1: Advertise the start of the collaboration in each Party’s website with a dedicated static page and article or press release (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2550 DECIDE M4.1: DECIDE Sustainability Plan (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2550 DECIDE M4.1: DECIDE Sustainability Plan (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2547 DECIDE M3.1: Help desk integration (Sept 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2547 DECIDE M3.1: Help desk integration (Sept 2011)]  
Line 186: Line 207:
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2254 StratusLab M1.1: Technical meeting on grid-cloud integration at EGI UF 2011 (April 2011)]
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2254 StratusLab M1.1: Technical meeting on grid-cloud integration at EGI UF 2011 (April 2011)]


This activity will not be done as there is another milestone to hold this kind of meeting at the TF, therefore, this one cannot be moved to there. StratusLab held a workshop and a training course as well as participated in the UVW in May, but each had a specified milestone marked as "achieved".
This activity will not be done as there is another milestone to hold this kind of meeting at the TF, therefore, this one cannot be moved to there. StratusLab held a workshop and a training course as well as participated in the UVW in May, but each had a specified milestone marked as "achieved".  


= MoU Status  =
= MoU Status  =


*[https://wiki.egi.eu/wiki/PDT:Agreements MoU Status] (Signed, Negotiation Phase, Planned, DocDB link, Process Owner, etc.)
*[https://wiki.egi.eu/wiki/PDT:Agreements MoU Status] (Signed, Negotiation Phase, Planned, DocDB link, Process Owner, etc.)

Revision as of 11:44, 30 November 2011

MoU Advancement

Late Milestones


EGI takes over the operations of the StratusLab virtual appliance Marketplace beyond the end of the StratusLab project via a suitable partner (requires a report led by Tiziana Ferrari, EGI.eu)

Apr 2012

Expected

beyond the end of the StratusLab project via a suitable partner]

Achieved

Mar 2012

Expected

Achieved

Feb 2012

Expected

Achieved

Jan 2012

Expected

Achieved

Dec 2011

Expected

Achieved

Nov 2011

Expected

Achieved

Oct 2011

Expected

Achieved

Sept 2011

Expected

Achieved

Aug 2011

Achieved

Jul 2011

Achieved

Jun 2011

Achieved

May 2011

Achieved

Others

This activity will not be done as there is another milestone to hold this kind of meeting at the TF, therefore, this one cannot be moved to there. StratusLab held a workshop and a training course as well as participated in the UVW in May, but each had a specified milestone marked as "achieved".