Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "PDT:MOU advancement"

From EGIWiki
Jump to navigation Jump to search
Line 10: Line 10:
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2655 CHAIN M6.1 Report to CHAIN about the identification of research groups that are part of EGI VRCs and active in CHAIN’s regions of interest (Sept 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2655 CHAIN M6.1 Report to CHAIN about the identification of research groups that are part of EGI VRCs and active in CHAIN’s regions of interest (Sept 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2656 CHAIN M1.1 Roadmap for interoperation and integration aligned with the EGI Model and based on CHAIN’s understanding of Regional Grid Infrastructures (Sept 2011)]
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2656 CHAIN M1.1 Roadmap for interoperation and integration aligned with the EGI Model and based on CHAIN’s understanding of Regional Grid Infrastructures (Sept 2011)]
== Jan 2012  ==
=== Expected  ===
=== Achieved  ===


== Dec 2011  ==
== Dec 2011  ==
Line 15: Line 20:
=== Expected  ===
=== Expected  ===


*[https://rt.egi.eu/rt/Ticket/Display.html?id=1460 EMI M1.1(update): Report listing the inputs to the UMD Roadmap for the EGI-InSPIRE deliverable]
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2609 MAPPER M2.4: EGI to provide monitoring infrastructure needed to check status of deployed services. MAPPER delivers EGI compatible monitoring connectors (Dec 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2609 MAPPER M2.4: EGI to provide monitoring infrastructure needed to check status of deployed services. MAPPER delivers EGI compatible monitoring connectors (Dec 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2610 MAPPER M8.1: Training material published by MAPPER on the EGI Training Marketplace (Dec 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2610 MAPPER M8.1: Training material published by MAPPER on the EGI Training Marketplace (Dec 2011)]  
Line 31: Line 37:


=== Expected  ===
=== Expected  ===


*[https://rt.egi.eu/rt/Ticket/Display.html?id=1455 EMI M4.2: Requires a report on dissemination activities]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1455 EMI M4.2: Requires a report on dissemination activities]  

Revision as of 19:30, 29 November 2011

MoU Advancement

Late Milestones

Jan 2012  

Expected  

Achieved

Dec 2011

Expected

Achieved

Nov 2011

Expected

Achieved

Oct 2011

Expected

Achieved

Sept 2011

Expected

Achieved

Aug 2011

Achieved

Jul 2011

Achieved

Jun 2011

Achieved

May 2011

Achieved

Others

This activity will not be done as there is another milestone to hold this kind of meeting at the TF, therefore, this one cannot be moved to there. StratusLab held a workshop and a training course as well as participated in the UVW in May, but each had a specified milestone marked as "achieved".

MoU Status

  • MoU Status (Signed, Negotiation Phase, Planned, DocDB link, Process Owner, etc.)