Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "PDT:MOU advancement"

From EGIWiki
Jump to navigation Jump to search
Line 31: Line 31:


=== Expected  ===
=== Expected  ===
*[https://rt.egi.eu/guest/Ticket/Display.html?id=2352 gSLM M2.2: Report analysing the result of the obstacles and requirements survey]
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1455 M4.2: Requires a report on dissemination activities]
*[https://rt.egi.eu/guest/Ticket/Display.html?id=2353 gSLM M3.2: Requires a report on dissemination activities; EGI.eu participationin MDGS 2011]
*[https://rt.egi.eu/guest/Ticket/Display.html?id=2352 gSLM M2.2: Report analysing the result of the obstacles and requirements survey]  
*[https://rt.egi.eu/guest/Ticket/Display.html?id=2353 gSLM M3.2: Requires a report on dissemination activities; EGI.eu participationin MDGS 2011]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1942 StratusLab M7.1: Requires a report on dissemination activities (report led by Catherine Gater, EGI.eu)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=1942 StratusLab M7.1: Requires a report on dissemination activities (report led by Catherine Gater, EGI.eu)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2608 MAPPER M5.1: Deliver MAPPER D5.2 vertical integration plan (Nov 2011)]  
*[https://rt.egi.eu/rt/Ticket/Display.html?id=2608 MAPPER M5.1: Deliver MAPPER D5.2 vertical integration plan (Nov 2011)]  

Revision as of 19:27, 29 November 2011

MoU Advancement

Late Milestones

Dec 2011

Expected

Achieved

Nov 2011

Expected

Achieved

Oct 2011

Expected

Achieved

Sept 2011

Expected

Achieved

Aug 2011

Achieved

Jul 2011

Achieved

Jun 2011

Achieved

May 2011

Achieved

Others

This activity will not be done as there is another milestone to hold this kind of meeting at the TF, therefore, this one cannot be moved to there. StratusLab held a workshop and a training course as well as participated in the UVW in May, but each had a specified milestone marked as "achieved".

MoU Status

  • MoU Status (Signed, Negotiation Phase, Planned, DocDB link, Process Owner, etc.)