Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Operations Management Board

From EGIWiki
Revision as of 18:36, 10 November 2014 by Krakow (talk | contribs)
Jump to navigation Jump to search
Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



The Operations Management Board (OMB) is a EGI policy board which aims to define policies needed to provide a reliable transparent infrastructure composed of multiple national infrastructure providers (Terms of Reference).


Contact information noc-managers at mailman dot egi dot eu
Membership NGI Operations Managers, EGI-InSPIRE SA1 task leaders, EGI.eu COO
Meetings OMB on Indico
OMB Documents Document DB
Google Calendar Google OMB calendar contains actions' deadlines and OMB events

Actions

ID Deadline Description Status Assigned to
10.2014/7 Contact Gergely Sypos or Peter Solagna to offer resources for the Long tail of Science,

or if your NGIs would make use of the long tail of science platform to support your users with your NGI’s resources.

Open NGIs
10.2014/6

If there is any outreach activity currently on-going at NGI level, not reported in the presentation, please contact the EGI User community support team, to share information about the activities.

Open NGIs
10.2014/5 November OMB Discuss with the teams depending on the WN framework for the probes (including EGI

security) and report on the next OMB what is their status for an upgrade to a version not depending on it

Open Emir Imamagic
10.2014/4 test the new feature in the GOC DB development instance Open NGI/EGI Operations
10.2014/3 Contact EGI Operations if want to be part of the pilots. In particular if interested in supporting the LTOS with resources. Open NGIs
10.2014/2 Circulate instructions for the A/R probe to ROD teams Done EGI.eu/Operations Support
10.2014/1 17.11.2014 Check with the sites the need to have production + not monitored services Open NGIs
9.2014/11
31.10.2014 follow up the dCache v. 2.2.X decommissioning, upgrade to supported version or open downtime until upgrade is performed Open
NGIs
9.2014/9 Find Early Adopters for: EMI3 CREAM-LSF,FTS3, CVMFS and SQUID Open NGIs
9.2014/7 Contact EGI Operations if want to be part of the Argus pilot Open NGIs
9.2014/2 ASAP follow up new ops VOMS configuration at sites Open NGIs
7.2014/5
express interest in participating in Ops Portal AB – contact operations at egi.eu Open NGIs
7.2014/7 ASAP
Upgrade to UMD3, all services including APEL clients, or open downtimes until upgrade is performed Open NGIs


Previous OMB actions