Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Operations Management Board"

From EGIWiki
Jump to navigation Jump to search
Line 30: Line 30:
{| border="1" class="wikitable"
{| border="1" class="wikitable"
|-
|-
! ID
! ID  
! Deadline  
! Deadline  
! Description  
! Description  
! Assigned to
! Assigned to
|-
|-
| 7.2014/1<br>
| 9.2014/10
| 28.08.2014<br>
| October OMB
| Double check NGI info in GOC DB
| discuses offline Ava/Rel Ops Portal probe issue and come up with proposal at October OMB
| NGIs<br>
| EGI Operations (Malgorzata) 
|-
|-
| 7.2014/2  
| 9.2014/9
| 01.08.2014<br>  
|
| Submit QR17 metrics
| Find Early Adopters for: EMI3 CREAM-LSF,FTS3, CVMFS and SQUID
| NGIs
|-
| 9.2014/8
| October OMB<br>
| Answer to RA survey https://wiki.egi.eu/wiki/RA_policy_survey
| NGIs
|-
| 9.2014/7
|
| Contact EGI Operations if want to be part of the Argus pilot
| NGIs
|-
| 9.2014/6
|
| Investigate need to have separate service type for NGI Argus’es
| EGI Operations (Peter)
|-
| 9.2014/5
|
| Evaluate changes in the certification status at site level. Discuss binding setting "PRODUCTION" & "MONITORED" statuses in GOC DB.
| EGI Operations
|-
| 9.2014/4
|
| Merge the site certification procedures (no. 9 and 18)
| EGI Operations (Malgorzata)
|-
| 9.2014/3
|
| to check the OPS VOMS configuration in Perun
| CESNET
|-
| 9.2014/2
| ASAP
| follow up new ops VOMS configuration at sites
| NGIs
|-
| 9.2014/1
| October OMB
| provide comments to [https://documents.egi.eu/public/ShowDocument?docid=2166 EGI.eu SLA] and [https://documents.egi.eu/public/ShowDocument?docid=2282 Technology Provider SLA]<br>
| NGIs
| NGIs
|-
|-
| 7.2014/4  
| 7.2014/4  
| 5.09.2014<br>  
| 25.09.2014<br>  
| provide comments to [https://documents.egi.eu/public/ShowDocument?docid=463 RP OLA] and [https://documents.egi.eu/public/ShowDocument?docid=31 RC OLA]  
| provide comments to [https://documents.egi.eu/public/ShowDocument?docid=463 RP OLA] and [https://documents.egi.eu/public/ShowDocument?docid=31 RC OLA]  
| NGIs
| NGIs
Line 53: Line 93:
| <br>  
| <br>  
| express interest in participating in Ops Portal AB – contact operations at egi.eu  
| express interest in participating in Ops Portal AB – contact operations at egi.eu  
| NGIs
|-
| 7.2014/6
| <br>
| express interest in participating in SAM probes refactoring activity – contact operations at egi.eu
| NGIs
| NGIs
|-
|-
| 7.2014/7  
| 7.2014/7  
| 10.08.2014<br>  
| ASAP<br>  
| Upgrade to UMD3, all services including APEL clients, or open downtimes until upgrade is performed  
| Upgrade to UMD3, all services including APEL clients, or open downtimes until upgrade is performed  
| NGIs
| NGIs
|-
| 7.2014/8
| <br>
| Discuss the catch-all VO - how to setup, what is the support, the implications having it in the infrastructure
| EGI.eu User support + Operations
|-
| 7.2014/9
| <br>
| Contact NGIs to find-out the situation of the RA local policies
| Resource Allocation team
|}
|}


<br>
<br>  


== Previous [[OMB actions history|OMB actions]]  ==
== Previous [[OMB actions history|OMB actions]]  ==
|
{{#widget:Google_Calendar
|id=egi.eu_jeurpkcavjbfnrkukvk06jv6rg@group.calendar.google.com
|color=528800
|title= EGI Meetings
|weekstart=1
|lang  = en
| view =AGENDA
| height =600
|width =300
}}


|}
|}


[[Category:Operations_Management_Board|*]]
[[Category:Operations_Management_Board|*]]

Revision as of 16:32, 19 September 2014

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



The Operations Management Board (OMB) is a EGI policy board which aims to define policies needed to provide a reliable transparent infrastructure composed of multiple national infrastructure providers (Terms of Reference).


Contact information noc-managers at mailman dot egi dot eu
Membership NGI Operations Managers, EGI-InSPIRE SA1 task leaders, EGI.eu COO
Meetings OMB on Indico
OMB Documents Document DB
Google Calendar Google OMB calendar contains actions' deadlines and OMB events

Actions

ID Deadline Description Assigned to
9.2014/10 October OMB discuses offline Ava/Rel Ops Portal probe issue and come up with proposal at October OMB EGI Operations (Malgorzata)
9.2014/9 Find Early Adopters for: EMI3 CREAM-LSF,FTS3, CVMFS and SQUID NGIs
9.2014/8 October OMB
Answer to RA survey https://wiki.egi.eu/wiki/RA_policy_survey NGIs
9.2014/7 Contact EGI Operations if want to be part of the Argus pilot NGIs
9.2014/6 Investigate need to have separate service type for NGI Argus’es EGI Operations (Peter)
9.2014/5 Evaluate changes in the certification status at site level. Discuss binding setting "PRODUCTION" & "MONITORED" statuses in GOC DB. EGI Operations
9.2014/4 Merge the site certification procedures (no. 9 and 18) EGI Operations (Malgorzata)
9.2014/3 to check the OPS VOMS configuration in Perun CESNET
9.2014/2 ASAP follow up new ops VOMS configuration at sites NGIs
9.2014/1 October OMB provide comments to EGI.eu SLA and Technology Provider SLA
NGIs
7.2014/4 25.09.2014
provide comments to RP OLA and RC OLA NGIs
7.2014/5
express interest in participating in Ops Portal AB – contact operations at egi.eu NGIs
7.2014/7 ASAP
Upgrade to UMD3, all services including APEL clients, or open downtimes until upgrade is performed NGIs


Previous OMB actions