Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Operations Management Board"

From EGIWiki
Jump to navigation Jump to search
Line 40: Line 40:
* ACTION 3. 27-09-2013 ARGUS NGI. We need to progress with the implementation of the proof of concept of the ARGUS global banning infrastructure. Unless all NGI sites run an Argus, the NGI needs to provide an NGI Argus instance, i.e. a full Argus (with PDP and PEPd) is needed. Please contact EGI operations if you are planning to deploy an NGI ARGUS instance.
* ACTION 3. 27-09-2013 ARGUS NGI. We need to progress with the implementation of the proof of concept of the ARGUS global banning infrastructure. Unless all NGI sites run an Argus, the NGI needs to provide an NGI Argus instance, i.e. a full Argus (with PDP and PEPd) is needed. Please contact EGI operations if you are planning to deploy an NGI ARGUS instance.
* ACTION 4. 30-09-2013 NGIs to check that OPS VO is supported by all site services and that LFC tests are not disabled (results are missing for some NGI in ROC OPERATORS profile). To check which results are missing: http://grid-monitoring.egi.eu/myegi/gridmap/?groupname=&sitename=&vo=37&profile=26&dview=Status&grouptype=2&size=1&date=09-09-2013+13%3A17%3A54
* ACTION 4. 30-09-2013 NGIs to check that OPS VO is supported by all site services and that LFC tests are not disabled (results are missing for some NGI in ROC OPERATORS profile). To check which results are missing: http://grid-monitoring.egi.eu/myegi/gridmap/?groupname=&sitename=&vo=37&profile=26&dview=Status&grouptype=2&size=1&date=09-09-2013+13%3A17%3A54
=== August 2013 ===
* ACTION 1. 02-08-2013 Submission of EGI-InSPIRE QR13
* ACTION 2. 23-08-2013 To report on results of interoperability results conducted locally in order to contribute information to https://wiki.egi.eu/wiki/Middleware_argus_interoperability by August 23
* ACTION 3. Deadline for commenting the Oct 2013-Feb 2014 OMB Calendar
=== June 2013 ===
* ACTION 1. DEADLINE 14-06-2013 Provide feedback about the draft procedure for the decommissioning of service types (https://wiki.egi.eu/wiki/PROC17)
* ACTION 2. DEADLINE 14-06-2013 To provide comments about the switching of VO SAM and NGI SAM monitoring metrics to OPERATIONS (see ticket https://ggus.eu/ws/ticket_info.php?ticket=94374)
* ACTION 3. DEADLINE 17-06-2013 RODs to provide feedback about test eu.egi.MPI-GOCDB-Check
* ACTION 4. DEADLINE 30-06-2013 Sites supporting MPI jobs through cream to register eu.egi.MPI service end-points in GOCDB (https://operations-portal.egi.eu/broadcast/archive/id/941)
=== July 2013 ===
* ACTION 1. DEADLINE 12-07-2013 Participate to the survey on NGI services provisioning and usage (https://www.surveymonkey.com/s/NGI_services_provisioning_and_usage )


=== Previous [[OMB actions history|OMB actions]]  ===
=== Previous [[OMB actions history|OMB actions]]  ===

Revision as of 10:59, 10 September 2013

Main EGI.eu operations services Support Documentation Tools Activities Performance Technology Catch-all Services Resource Allocation Security



The Operations Management Board (OMB) is a EGI policy board which aims to define policies needed to provide a reliable transparent infrastructure composed of multiple national infrastructure providers (Terms of Reference).


Contact information noc-managers at mailman dot egi dot eu
Membership NGI Operations Managers, EGI-InSPIRE SA1 task leaders, EGI.eu COO
Meetings OMB on Indico
OMB Documents Document DB
Actions noc-managers queue on EGI Request Tracker
Google Calendar Google OMB calendar contains actions' deadlines and OMB events

Actions

October 2013

  • ACTION 1. 01-10-2013 Deadline for upgrade of NGI SAM instances to SAM Update 22. This deadline will be changed in case of significant changes to the current SAM Update 22 tentative release calendar

September 2013

  • ACTION 1. 20-09-2013 Deadline for submitting an expression of interest for coordinating EGI IPv6 testing activities. Expressions of interest to OMB or operations at egi.eu
  • ACTION 2. 30-09-2013 NGIs deploying a national ARGUS instance to register that (emi.ARGUS) in GOCDB as part of the NGI service site/grouping
  • ACTION 3. 27-09-2013 ARGUS NGI. We need to progress with the implementation of the proof of concept of the ARGUS global banning infrastructure. Unless all NGI sites run an Argus, the NGI needs to provide an NGI Argus instance, i.e. a full Argus (with PDP and PEPd) is needed. Please contact EGI operations if you are planning to deploy an NGI ARGUS instance.
  • ACTION 4. 30-09-2013 NGIs to check that OPS VO is supported by all site services and that LFC tests are not disabled (results are missing for some NGI in ROC OPERATORS profile). To check which results are missing: http://grid-monitoring.egi.eu/myegi/gridmap/?groupname=&sitename=&vo=37&profile=26&dview=Status&grouptype=2&size=1&date=09-09-2013+13%3A17%3A54

Previous OMB actions