Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "Operations Management Board"

From EGIWiki
Jump to navigation Jump to search
(Remove deprecated content)
 
(14 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Template:Op menubar}} {{TOC_right}}  
{{Template:Op menubar}} {{TOC_right}}  


The '''Operations Management Board''' (OMB) is a EGI policy board which aims to define policies needed to provide a reliable transparent infrastructure composed of multiple national infrastructure providers ([https://documents.egi.eu/document/117 Terms of Reference]).
{{DeprecatedAndMovedTo|new_location=https://confluence.egi.eu/display/EGIBG/Operations+Management+Board}}
 
----
 
{|
|-
| '''Contact information'''
| noc-managers at mailman dot egi dot eu
|-
| '''Membership'''
| NGI Operations Managers, EGI-InSPIRE SA1 task leaders, EGI.eu COO
|-
| '''Meetings'''
| [https://www.egi.eu/indico/categoryDisplay.py?categId=19 OMB on Indico]
|-
| '''OMB Documents'''
| [https://documents.egi.eu/secure/ListBy?groupid=33 Document DB]
|-
| '''Google Calendar'''
| [https://www.google.com/calendar/embed?src=egi.eu_jeurpkcavjbfnrkukvk06jv6rg@group.calendar.google.com&ctz=Europe/Amsterdam&gsessionid=XXg8f08wSdjfGkBuxqC_XQ Google OMB calendar] contains actions' deadlines and OMB events
|}
 
== Actions  ==
 
{| style="valign=top; vertical-align:top"
|- valign="top"
|
{| border="1" class="wikitable"
|-
! ID
! Deadline
! Description
! Status
! Assigned to
|-
| <div id="9.2014.2F11">9.2014/11</div>
| 31.10.2014
| follow up the dCache v. 2.2.X decommissioning, upgrade to supported version or open downtime until upgrade is performed
| Open<br>
| NGIs
|-
| 9.2014/10
| October OMB
| discuses offline Ava/Rel Ops Portal probe issue and come up with proposal at October OMB
| To be reported
| EGI Operations (Malgorzata)
|-
| 9.2014/9
|
| Find Early Adopters for: EMI3 CREAM-LSF,FTS3, CVMFS and SQUID
| Open
| NGIs
|-
| 9.2014/8
| October OMB<br>
| Answer to RA survey https://wiki.egi.eu/wiki/RA_policy_survey
| To be reported
| NGIs
|-
| 9.2014/7
|
| Contact EGI Operations if want to be part of the Argus pilot
| Open
| NGIs
|-
| 9.2014/6
|
| Investigate need to have separate service type for NGI Argus’es
| To be reported
| EGI Operations (Peter)
|-
| 9.2014/5
|
| Evaluate changes in the certification status at site level. Discuss binding setting "PRODUCTION" &amp; "MONITORED" statuses in GOC DB.
| To be reported<br>
| EGI Operations
|-
| 9.2014/4
|
| Merge the site certification procedures (no. 9 and 18)
| Done
| EGI Operations (Malgorzata)
|-
| 9.2014/3
|
| to check the OPS VOMS configuration in Perun
| Done
| CESNET
|-
| 9.2014/2
| ASAP
| follow up new ops VOMS configuration at sites
| Open
| NGIs
|-
| 9.2014/1
| October OMB
| provide comments to [https://documents.egi.eu/public/ShowDocument?docid=2166 EGI.eu SLA] and [https://documents.egi.eu/public/ShowDocument?docid=2282 Technology Provider SLA]<br>
| Done
| NGIs
|-
| 7.2014/4
| 25.09.2014<br>
| provide comments to [https://documents.egi.eu/public/ShowDocument?docid=463 RP OLA] and [https://documents.egi.eu/public/ShowDocument?docid=31 RC OLA]
| Done
| NGIs
|-
| 7.2014/5
| <br>
| express interest in participating in Ops Portal AB – contact operations at egi.eu
| Open
| NGIs
|-
| 7.2014/7
| ASAP<br>
| Upgrade to UMD3, all services including APEL clients, or open downtimes until upgrade is performed
| Open
| NGIs
|}
 
<br>
 
|
{{#widget:Google_Calendar
|id=egi.eu_jeurpkcavjbfnrkukvk06jv6rg@group.calendar.google.com
|color=528800
|title= EGI Meetings
|weekstart=1
|lang  = en
| view =AGENDA
| height =600
|width =300
}}  
 
|}
 
== Previous [[OMB actions history|OMB actions]]  ==


[[Category:Operations_Management_Board|*]]
[[Category:Operations_Management_Board|*]]

Latest revision as of 18:14, 10 September 2021