Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "OMB"

From EGIWiki
Jump to navigation Jump to search
(Redirected page to Operations Management Board)
 
(122 intermediate revisions by 4 users not shown)
Line 1: Line 1:
===Operations Management Board (OMB)===
#REDIRECT [[Operations_Management_Board]]
 
OMB aims to define policies needed to provide a reliable transparent infrastructure composed of multiple national infrastructure providers
* [https://documents.egi.eu/document/117 Terms of Reference] (draft)
 
*'''Contact information''': noc-managers at mailman dot egi dot eu
*'''Membership''': NGI Operations Managers, EGI-InSPIRE SA1 task leaders, EGI.eu COO
*'''[https://www.egi.eu/indico/categoryDisplay.py?categId=19 Agenda pages]'''
*'''[https://documents.egi.eu/secure/ListBy?groupid=33 Documents from the EGI.eu Document DB]'''
*'''[https://rt.egi.eu/rt/Search/Results.html?Query=Queue%20%3D%20%27noc-managers%27%20AND%20%28Status%20%3D%20%27new%27%20OR%20Status%20%3D%20%27open%27%20OR%20Status%20%3D%20%27stalled%27%29 OMB Actions at EGI.eu RT]'''
 
==Operations Manager's Agenda==
 
===February 2011===
* DEADLINE: 10 Feb:
**'''Submmission of QR3 report and metrics''':
*** Please supply NGI reports and metrics for QR3 at [https://wiki.egi.eu/wiki/NGI_QR_Reports_and_Metrics here] 
*** Please supply SA1 task reports and metrics for QR2 at [https://wiki.egi.eu/wiki/SA1_Task_QR_Reports_and_Metrics here]
 
** Survey on supported OS platforms for EMI, LB, service management and monitoring
: We would like to launch the first SA1 survey covering the following capabilities: Logging and Bookkeeping, Service Management and and Auditing and gLite-CLUSTER. All these capabilities are relevant to EGI and feedback - after internal processing - will be provided to the EMI project, so it is very important that you give this survey high priority. For some of the questions, you may need to consult your site managers. [https://wiki.egi.eu/wiki/EGI_Operations_Surveys Instructions for submission]. on how to complete the survey are available at:
 
**'''Call for Requiements: EMI 2.0 and Nagios tests'''
: The requirement gathering process for EMI 2.0 (ARC, gLite and UNICORE) needs to start now, as EMI software development will start in May 2011, and all requirements need to be internally gathered and prioritized in the OMB and OTAG (depending on the type of requirement), and then discussed at the Technical Coordination Board of EGI.
: All requirements are gathered through the RT requirements queue (https://rt.egi.eu/rt/). Requirements can be submitted by sa1 task leaders and OMB members.
 
*** [https://wiki.egi.eu/wiki/Mw-requirements.html Instructions] for middleware requirements
*** [https://wiki.egi.eu/wiki/Nagios-requirements.html Instructions] for Nagios requirements
 
===January 2011===
* Action 6.2 Review document Proposal for extensions to availability and reliability calculations and send your comments and feedback to the noc-managers list
* Action 6.7 To send feedback and any new or missing requirement for EMI 1.0, and to prioritize the existing requirements list (the xls file was set to the noc-managers list on 23 Dec 2010)
* Action 6.10 To send comments on the usage of a single EGI monitoring VO (OPS). Is the NGi in favour or is this proposal rejected?
* Action 6.12 to review the current list of non-assigned components and volunteer to the staged rollout of those that are of interest to them ([https://wiki.egi.eu/wiki/Components table])
* To check the draft site certification [https://wiki.egi.eu/wiki/SiteCertMan manual] and provide comments input to V. Hansper and Operational-documentation-manuals (at) mailman.egi.eu
 
===December 2010===
* Dec 03: deadline for informing about UNICORE and/or GLOBUS deployment plans for year 2011. Mail to Tiziana.Ferrari at egi.eu
* By Dec 14: deadline of collection of requirements on Service Management. Input is collected on [https://rt.egi.eu/rt/Ticket/Display.html?id=563 RT]
* By Dec 20: provide feedback on training needs for the EGI user forum.''The EGI User Forum, which will take place in Vilnius during the week 11-15 April 2011, is approaching. This meeting will be organized in cooperation with the EMI project. Training sessions about EMI middleware and EGI Operations can be organized according to your needs. The User Forum is an opportunity for all NGIs, especially the ones constituted recently or under creation, to get training in different areas.''
* Dec 21: [https://www.egi.eu/indico/conferenceDisplay.py?confId=152 OMB meeting]
 
===November 2010===
* Nov 16: OTAG meeting ([https://www.egi.eu/indico/conferenceDisplay.py?confId=214 agenda]) on SAM requirements and developments
* Nov 23: OMB meeting ([https://www.egi.eu/indico/conferenceDisplay.py?confId=151 agenda])
** Please review OLA [https://documents.egi.eu/document/259 roadmap draft]
 
===October 2010===
Items for approval: https://www.egi.eu/indico/conferenceDisplay.py?confId=150
 
* Oct 6 (previous deadine has been anticipated): deadline for submitting your NGI deployment plan of regionalized tools.
::: FOLLOWUP (19 Oct): deployment plans will be summarized in Milestone [https://documents.egi.eu/public/ShowDocument?docid=128 MS406]
* Oct 11: deadline for submitting comments to the gLite 3.2 transition plan
** gLite Collaboration [https://twiki.cern.ch/twiki/bin/view/EGEE/LCGprioritiesgLite#23_09_2010 draft proposal]
** critical issues preventing deployment of gLite 3.2 components need to be reported on [https://rt.egi.eu/rt/Ticket/Display.html?id=263 RT]
::: FOLLOWUP (19 Oct): sent request of approval of the [http://glite.web.cern.ch/glite/packages/R3.1/default_calendar.asp gLite 3.1 end of support draft calendar]
* Oct 18: deadline for supplying requirements for ARC, gLite, UNICORE middleware (EMI project). Requirements are gathered on RT, ticket [https://rt.egi.eu/rt/Ticket/Display.html?id=331 331]
* Oct 20: deadline for providing requirements for operational tools (EGI-InSPIRE JRA1). Feedback to the OTAG mailing list
** tool development [https://documents.egi.eu/secure/ShowDocument?docid=50 roadmap]
** EGI-TF [https://www.egi.eu/indico/sessionDisplay.py?sessionId=20&slotId=0&confId=48#2010-09-16 tool roadmap session]
* Oct 26: deadline for submitting second EGI-InSPIRE QR

Latest revision as of 17:33, 10 December 2012