Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "OMB"

From EGIWiki
Jump to navigation Jump to search
(Redirected page to Operations Management Board)
 
(11 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Template:Op menubar}}
#REDIRECT [[Operations_Management_Board]]
{{TOC_right}}
 
[[Category:Operations Management Board|*]]
 
The '''Operations Management Board''' (OMB) is a EGI policy board which aims to define policies needed to provide a reliable transparent infrastructure composed of multiple national infrastructure providers ([https://documents.egi.eu/document/117 Terms of Reference]).
 
----
{|
|-
|'''Contact information'''
|noc-managers at mailman dot egi dot eu
|-
|'''Membership'''
|NGI Operations Managers, EGI-InSPIRE SA1 task leaders, EGI.eu COO
|-
|'''Meetings'''
|[https://www.egi.eu/indico/categoryDisplay.py?categId=19 OMB on Indico]
|-
|'''OMB Documents'''
| [https://documents.egi.eu/secure/ListBy?groupid=33 Document DB]
|-
|'''Actions'''
| [https://rt.egi.eu/rt/Search/Results.html?Query=Queue%20%3D%20%27noc-managers%27%20AND%20%28Status%20%3D%20%27new%27%20OR%20Status%20%3D%20%27open%27%20OR%20Status%20%3D%20%27stalled%27%29 noc-managers] queue on EGI Request Tracker
|}
== Agenda==
 
=== November 2012 ===
* ACTION 1. '''DEADLINE 02 November''' Submission of EGI-InSPIRE QR10 NGI [[NGI_QR_Reports|reports]]
* ACTION 2. '''DEADLINE 26 November''' Provide feedback about the following proposal: from 01 Nov lcg-ce tests are removed from the three SAM profiles: ROC, ROC_OPERATORS (the list of tests generating alarms into the operations portal), and ROC_CRITICAL (the list of tests generating results that are taken into account for Availability/Reliability reports)
 
=== October 2012 ===
* ACTION 1. '''DEADLINE 12 October''' NGIs with sites interested in deploying CREAM in HA cluster setup are requested to provide feedback to the OMB about site setup configurations for what concerns: used shared file systems (NFS, GPFS, etc), used gateways (DNS, Apache server), load balancing algorithms in use (Round Robin, Weight based, etc), data replications [https://indico.egi.eu/indico/materialDisplay.py?contribId=57&sessionId=11&materialId=slides&confId=1019 see slides].
* ACTION 2. '''DEADLINE 29 October''' Provide comments about new versions of Resource Centre Registration and Certification Procedure (https://wiki.egi.eu/wiki/PROC09/Draft) and VO Registration Procedure
(https://wiki.egi.eu/wiki/PROC14)
 
=== September 2012 ===
* ACTION 1. '''DEADLINE 07 September''' All NGIs are requested to provide information about national and site-specific resource allocation policies. This information is needed to allow for better support and capacity allocation for new international user communities. It must be provided at: https://wiki.egi.eu/wiki/Operations/Resource_Allocation
* ACTION 2. '''DEADLINE 07 September''' To report experience about VOs running on EMI WN at the following wiki page: https://wiki.egi.eu/wiki/NGI-VO_WN_tests. In case of issues, a security support of gLite 3.2 WN needs to be requested. Feedback from NGIs is fundamental.
* ACTION 3. '''DEADLINE 07 September''' All NGIs are requested to provide information about their sustainability status after May 2014 and about the EGI Global operations services. Information will be used for the discussion at the OMB workshop hosted by the Technical Forum 2012. Please participate to the survey (see [[EGI_Operations_Surveys#Sustainability_of_the_EGI.2FNGIs_operations_service| instructions]]).
 
=== Previous [[OMB agendas]] ===

Latest revision as of 16:33, 10 December 2012