Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI International Task Review MS109 Slovenia"

From EGIWiki
Jump to navigation Jump to search
Line 39: Line 39:
| OS_IS_SoftwareRollout_HowToImprove = write here
| OS_IS_SoftwareRollout_HowToImprove = write here


| OS_IS_Monitoring_Assessment = write here
| OS_IS_Monitoring_Assessment = We have a central national Nagios, both sites are monitored through this software. Each site has a site egee-Nagios as well. We are monitoring bandwidth, disk usage, network usage, load etc. by cacti. Mails and messages are sent to site administrators when a problem occurs.
| OS_IS_Monitoring_Score = 0-5
| OS_IS_Monitoring_Score = 5
| OS_IS_Monitoring_HowToImprove = write here
| OS_IS_Monitoring_HowToImprove = We will add monitoring the I/O operations as well.


| OS_IS_Accounting_Assessment = write here
| OS_IS_Accounting_Assessment = Both sites are publishing, for gLite and Arc.
| OS_IS_Accounting_Score = 0-5
| OS_IS_Accounting_Score = 0-5
| OS_IS_Accounting_HowToImprove = write here
| OS_IS_Accounting_HowToImprove = For Arc, we do not have information by VOs.


| OS_IS_Configuration_OpPortal_Assessment = write here
| OS_IS_Configuration_OpPortal_Assessment = write here

Revision as of 14:34, 23 March 2011



This page contains the assessment of the NGI International Task at year 1 of the EGI-InSPIRE project (one page per NGI). The NGI representatives are required to fill the tables according to the required information. The content will be integral part of the EGI-InSPIRE milestone MS109 "NGI International Task Review"

  • Main page with instructions
  • In order to edit this page, you need to log in with your EGI SSO account and click 'edit' on the tab (top of this page)

User Services

Human Services (Table 1)

Table 1: NGI Assessment: User Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA3.3N U-N-3 U-N-13 Requirements Gathering Some information was received on our mailing list, we have obtained a lot of useful feedback from the representatives of organizations on the NGI meeting, organized in November 2011. It appears that users need HPC cluster for their work (at the moment we do not provide one). 4 Since there is a need of HPC cluster, we will set up one in 2011.
NA3.3N U-N-14 U-N-15 Application Database write here 0-5 write here
NA3.3N U-N-16 U-N-17 Training ARC school was organized in May 2010, since then no trainings for users were organized. We have organized NGI meeting in November 2010 and invited the interested faculties, institutes and agencies. Further technical support was available by mailing lists and (video)conferences. We have provided a detailed documentation for the end users and for site administrators. 3 When needed we will organize a workshop for end users (more interest for Nordugrid Arc middleware).
NA3.3N U-N-12 U-N-18 U-N-19 Consultancy Since we have a small grid community, we have provided all the necessary support by mailing lists and instant messaging. Some face to face meetings we arranged as well, where we have advised our users individually. 4 We are satisfied with the work done, but there is always room for improvements. Face to face meetings are hard to arrange (we do not have a lot of staff with time and/or necessary skills).

Operations Services

Human Services (Table 2)

Table 2: NGI Assessment: Operations Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.4N O-N-9 Requirements Gathering your assessment here 0-5 how to improve
SA1.1N O-N-9 Operations Coordination write here 0-5 write here
SA1.2N O-N-9 Security write here 0-5 write here

Infrastructure Services (Table 3)

Table 3: NGI Assessment: Operations Services >> Infrastructure Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.3N O-N-9 Software Rollout write here 0-5 write here
SA1.4N O-N-3 Monitoring We have a central national Nagios, both sites are monitored through this software. Each site has a site egee-Nagios as well. We are monitoring bandwidth, disk usage, network usage, load etc. by cacti. Mails and messages are sent to site administrators when a problem occurs. 5 We will add monitoring the I/O operations as well.
SA1.5N O-N-2 Accounting Both sites are publishing, for gLite and Arc. 0-5 For Arc, we do not have information by VOs.
SA1.4N O-N-1 O-N-4 Configuration Repository and Operations Portal write here 0-5 write here
SA1.6N SA1.7N O-N-6 O-N-7 Helpdesk write here 0-5 write here
SA1.8N O-N-5 O-N-8 Core Services write here 0-5 write here

Other (Table 4)

Table 4: NGI Assessment: Other
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA2.3N Policy Development write here 0-5 write here
NA2.2N E-N-2 Dissemination write here 0-5 write here