Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI International Task Review MS109 Slovakia"

From EGIWiki
Jump to navigation Jump to search
 
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
[[Category:Metrics]]
{{NGI_InternationalTask_Review
{{NGI_InternationalTask_Review


<!-- User Services - Human Services -->
<!-- User Services - Human Services -->


| US_HS_RequirementsGathering_Assessment = write here
| US_HS_RequirementsGathering_Assessment = NGI_SK is trying to get new grid users by various means.
| US_HS_RequirementsGathering_Score = 0-5
| US_HS_RequirementsGathering_Score = 3
| US_HS_RequirementsGathering_HowToImprove = write here
| US_HS_RequirementsGathering_HowToImprove = More active participation with EGI.eu/NA3 is expected.


| US_HS_Application_Database_Assessment = write here
| US_HS_Application_Database_Assessment = Although we helped some of NGI_SK users to move their application to grid, we did not entered our results into the application database.
| US_HS_Application_Database_Score = 0-5
| US_HS_Application_Database_Score = 2
| US_HS_Application_Database_HowToImprove = write here
| US_HS_Application_Database_HowToImprove = Insert already gridified applications into database, even if the same application is already there, entered by other partner.


| US_HS_Training_Assessment = write here
| US_HS_Training_Assessment = Several trainings for grid users were provided (one course in October and several individual trainings).
| US_HS_Training_Score = 0-5
| US_HS_Training_Score = 3
| US_HS_Training_HowToImprove = write here
| US_HS_Training_HowToImprove = We expect that user community will slowly grow and more training courses will be provided on demand.


| US_HS_Consultancy_Assessment = write here
| US_HS_Consultancy_Assessment = We provided consultations to system administratons of NGI_SK sites and individual consultantions to users and potential users.
| US_HS_Consultancy_Score = 0-5
| US_HS_Consultancy_Score = 3
| US_HS_Consultancy_HowToImprove = write here
| US_HS_Consultancy_HowToImprove = Improving according to demands of admins and users is expected.


<!-- Operations Services - Human Services -->
<!-- Operations Services - Human Services -->


| OS_HS_RequirementsGathering_Assessment | your assessment here
| OS_HS_RequirementsGathering_Assessment = We did not received any specific requirements from our sites.
| OS_HS_RequirementsGathering_Score = 0-5
| OS_HS_RequirementsGathering_Score = 2
| OS_HS_RequirementsGathering_HowToImprove | how to improve
| OS_HS_RequirementsGathering_HowToImprove = As the NGI infrastructure will get larger we expect more requirements to be collected.


| OS_HS_Coordination_Assessment = write here
| OS_HS_Coordination_Assessment = NGI_SK participates on regular OMB and OM meetings.
| OS_HS_Coordination_Score = 0-5
| OS_HS_Coordination_Score = 3
| OS_HS_Coordination_HowToImprove = write here
| OS_HS_Coordination_HowToImprove = none


| OS_HS_Security_Assessment = write here
| OS_HS_Security_Assessment = Security related activities were properly propagated and followed.
| OS_HS_Security_Score = 0-5
| OS_HS_Security_Score = 3
| OS_HS_Security_HowToImprove = write here
| OS_HS_Security_HowToImprove = none


<!-- Operations Services - Infrastructure Services -->
<!-- Operations Services - Infrastructure Services -->


| OS_IS_SoftwareRollout_Assessment = write here
| OS_IS_SoftwareRollout_Assessment = NGI_SK did not participated in Software Rollout.
| OS_IS_SoftwareRollout_Score = 0-5
| OS_IS_SoftwareRollout_Score = 2
| OS_IS_SoftwareRollout_HowToImprove = write here
| OS_IS_SoftwareRollout_HowToImprove = We plan to setup EA resources and participate in Software Rollout for EMI 1.0


| OS_IS_Monitoring_Assessment = write here
| OS_IS_Monitoring_Assessment = National Nagios instance is maintained and kept up-to-date.
| OS_IS_Monitoring_Score = 0-5
| OS_IS_Monitoring_Score = 3
| OS_IS_Monitoring_HowToImprove = write here
| OS_IS_Monitoring_HowToImprove = none


| OS_IS_Accounting_Assessment = write here
| OS_IS_Accounting_Assessment = All NGI_SK sites have migrated to ActiveMQ well ahead before the deadline.
| OS_IS_Accounting_Score = 0-5
| OS_IS_Accounting_Score = 3
| OS_IS_Accounting_HowToImprove = write here
| OS_IS_Accounting_HowToImprove = none


| OS_IS_Configuration_OpPortal_Assessment = write here
| OS_IS_Configuration_OpPortal_Assessment = We are using central GOCDB and Dashboard.
| OS_IS_Configuration_OpPortal_Score = 0-5
| OS_IS_Configuration_OpPortal_Score = 0
| OS_IS_Configuration_OpPortal_HowToImprove = write here
| OS_IS_Configuration_OpPortal_HowToImprove = none


| OS_IS_Helpdesk_Assessment = write here
| OS_IS_Helpdesk_Assessment = We provide dedicated support unit in central GGUS.
| OS_IS_Helpdesk_Score = 0-5
| OS_IS_Helpdesk_Score = 3
| OS_IS_Helpdesk_HowToImprove = write here
| OS_IS_Helpdesk_HowToImprove = Currently the support unit in central GGUS is sufficient for us, this might be revised in the future as infrastructure will get larger.


| OS_IS_CoreServices_Assessment = write here
| OS_IS_CoreServices_Assessment = NGI_SK provides national instance of top level BDII, WMS and PX for regional VO (VOCE), national CA, more local UIs.
| OS_IS_CoreServices_Score = 0-5
| OS_IS_CoreServices_Score = 3
| OS_IS_CoreServices_HowToImprove = write here
| OS_IS_CoreServices_HowToImprove = Operation of national top BDII was stable, however we are in the process of setting up HA cluster for it to ensure availability in the case of HW failure.


<!-- Others - Policy -->
<!-- Others - Policy -->


| O_Policy_Assessment = write here
| O_Policy_Assessment = NGI_SK implements EGI policies and procedures, and as we are small NGI, we do not actively participate in policy development.
| O_Policy_Score = 0-5
| O_Policy_Score = 3
| O_Policy_HowToImprove = write here
| O_Policy_HowToImprove = More actively participate in developing EGI policies and procedures, develop and sign national policies and procedures that are in alignment with those of EGI.


<!-- Others - Dissemination -->
<!-- Others - Dissemination -->


| O_Dissemination_Assessment =  
| O_Dissemination_Assessment =
- Organization of annual International Workshop on Grid Computing for Complex Problems in Bratislava
SlovakGrid SK
- Press conference organization
* Organization of annual International Workshop on Grid Computing for Complex Problems in Bratislava
- Dissemination and popularization articles in Slovak journals
* Press conference organization
- Presentations and papers on grid computing in proceedings of scientific conferences
* Dissemination and popularization articles in Slovak journals
- Preparation of study materials on grid computing (CD in Slovak)
* Presentations and papers on grid computing in proceedings of scientific conferences
- SlovakGrid website creation and actualization [http://www.slovakgrid.sk]
* Preparation of study materials on grid computing (CD in Slovak)
- Preparation of materials for Ministry of education of Slovak republic, regarding participation of SR in EGI
* SlovakGrid website creation and actualization [http://www.slovakgrid.sk]
- Public events organised by NGI team
* Preparation of materials for Ministry of education of Slovak republic, regarding participation of SR in EGI
* Public events organised by NGI team
| O_Dissemination_Score = 4
| O_Dissemination_Score = 4
| O_Dissemination_HowToImprove = Visibility of Slovak NGI - SlovakGrid should be increased
| O_Dissemination_HowToImprove = Visibility of Slovak NGI - SlovakGrid should be increased.


}}
}}

Latest revision as of 18:55, 19 December 2012



This page contains the assessment of the NGI International Task at year 1 of the EGI-InSPIRE project (one page per NGI). The NGI representatives are required to fill the tables according to the required information. The content will be integral part of the EGI-InSPIRE milestone MS109 "NGI International Task Review"

  • Main page with instructions
  • In order to edit this page, you need to log in with your EGI SSO account and click 'edit' on the tab (top of this page)

User Services

Human Services (Table 1)

Table 1: NGI Assessment: User Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA3.3N U-N-3 U-N-13 Requirements Gathering NGI_SK is trying to get new grid users by various means. 3 More active participation with EGI.eu/NA3 is expected.
NA3.3N U-N-14 U-N-15 Application Database Although we helped some of NGI_SK users to move their application to grid, we did not entered our results into the application database. 2 Insert already gridified applications into database, even if the same application is already there, entered by other partner.
NA3.3N U-N-16 U-N-17 Training Several trainings for grid users were provided (one course in October and several individual trainings). 3 We expect that user community will slowly grow and more training courses will be provided on demand.
NA3.3N U-N-12 U-N-18 U-N-19 Consultancy We provided consultations to system administratons of NGI_SK sites and individual consultantions to users and potential users. 3 Improving according to demands of admins and users is expected.

Operations Services

Human Services (Table 2)

Table 2: NGI Assessment: Operations Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.4N O-N-9 Requirements Gathering We did not received any specific requirements from our sites. 2 As the NGI infrastructure will get larger we expect more requirements to be collected.
SA1.1N O-N-9 Operations Coordination NGI_SK participates on regular OMB and OM meetings. 3 none
SA1.2N O-N-9 Security Security related activities were properly propagated and followed. 3 none

Infrastructure Services (Table 3)

Table 3: NGI Assessment: Operations Services >> Infrastructure Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.3N O-N-9 Software Rollout NGI_SK did not participated in Software Rollout. 2 We plan to setup EA resources and participate in Software Rollout for EMI 1.0
SA1.4N O-N-3 Monitoring National Nagios instance is maintained and kept up-to-date. 3 none
SA1.5N O-N-2 Accounting All NGI_SK sites have migrated to ActiveMQ well ahead before the deadline. 3 none
SA1.4N O-N-1 O-N-4 Configuration Repository and Operations Portal We are using central GOCDB and Dashboard. 0 none
SA1.6N SA1.7N O-N-6 O-N-7 Helpdesk We provide dedicated support unit in central GGUS. 3 Currently the support unit in central GGUS is sufficient for us, this might be revised in the future as infrastructure will get larger.
SA1.8N O-N-5 O-N-8 Core Services NGI_SK provides national instance of top level BDII, WMS and PX for regional VO (VOCE), national CA, more local UIs. 3 Operation of national top BDII was stable, however we are in the process of setting up HA cluster for it to ensure availability in the case of HW failure.

Other (Table 4)

Table 4: NGI Assessment: Other
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA2.3N Policy Development NGI_SK implements EGI policies and procedures, and as we are small NGI, we do not actively participate in policy development. 3 More actively participate in developing EGI policies and procedures, develop and sign national policies and procedures that are in alignment with those of EGI.
NA2.2N E-N-2 Dissemination SlovakGrid SK
  • Organization of annual International Workshop on Grid Computing for Complex Problems in Bratislava
  • Press conference organization
  • Dissemination and popularization articles in Slovak journals
  • Presentations and papers on grid computing in proceedings of scientific conferences
  • Preparation of study materials on grid computing (CD in Slovak)
  • SlovakGrid website creation and actualization [1]
  • Preparation of materials for Ministry of education of Slovak republic, regarding participation of SR in EGI
  • Public events organised by NGI team
4 Visibility of Slovak NGI - SlovakGrid should be increased.