Difference between revisions of "NGI International Task Review MS109 Slovakia"
Jump to navigation
Jump to search
m |
|||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
[[Category:Metrics]] | |||
{{NGI_InternationalTask_Review | {{NGI_InternationalTask_Review | ||
Line 4: | Line 5: | ||
| US_HS_RequirementsGathering_Assessment = NGI_SK is trying to get new grid users by various means. | | US_HS_RequirementsGathering_Assessment = NGI_SK is trying to get new grid users by various means. | ||
| US_HS_RequirementsGathering_Score = | | US_HS_RequirementsGathering_Score = 3 | ||
| US_HS_RequirementsGathering_HowToImprove = More active participation with EGI.eu/NA3 is expected. | | US_HS_RequirementsGathering_HowToImprove = More active participation with EGI.eu/NA3 is expected. | ||
| US_HS_Application_Database_Assessment = Although we helped some of NGI_SK users to move their application to grid | | US_HS_Application_Database_Assessment = Although we helped some of NGI_SK users to move their application to grid, we did not entered our results into the application database. | ||
| US_HS_Application_Database_Score = | | US_HS_Application_Database_Score = 2 | ||
| US_HS_Application_Database_HowToImprove = Insert already gridified applications into database, even if the same application is already there. | | US_HS_Application_Database_HowToImprove = Insert already gridified applications into database, even if the same application is already there, entered by other partner. | ||
| US_HS_Training_Assessment = Several trainings for grid users were provided (one course in October and several individual trainings). | | US_HS_Training_Assessment = Several trainings for grid users were provided (one course in October and several individual trainings). | ||
Line 36: | Line 37: | ||
| OS_IS_SoftwareRollout_Assessment = NGI_SK did not participated in Software Rollout. | | OS_IS_SoftwareRollout_Assessment = NGI_SK did not participated in Software Rollout. | ||
| OS_IS_SoftwareRollout_Score = | | OS_IS_SoftwareRollout_Score = 2 | ||
| OS_IS_SoftwareRollout_HowToImprove = We plan to setup EA resources and participate in Software Rollout for EMI 1.0 | | OS_IS_SoftwareRollout_HowToImprove = We plan to setup EA resources and participate in Software Rollout for EMI 1.0 | ||
Line 43: | Line 44: | ||
| OS_IS_Monitoring_HowToImprove = none | | OS_IS_Monitoring_HowToImprove = none | ||
| OS_IS_Accounting_Assessment = All NGI_SK sites have migrated to ActiveMQ | | OS_IS_Accounting_Assessment = All NGI_SK sites have migrated to ActiveMQ well ahead before the deadline. | ||
| OS_IS_Accounting_Score = 3 | | OS_IS_Accounting_Score = 3 | ||
| OS_IS_Accounting_HowToImprove = none | | OS_IS_Accounting_HowToImprove = none | ||
| OS_IS_Configuration_OpPortal_Assessment = We are using central GOCDB and Dashboard. | | OS_IS_Configuration_OpPortal_Assessment = We are using central GOCDB and Dashboard. | ||
| OS_IS_Configuration_OpPortal_Score = | | OS_IS_Configuration_OpPortal_Score = 0 | ||
| OS_IS_Configuration_OpPortal_HowToImprove = none | | OS_IS_Configuration_OpPortal_HowToImprove = none | ||
Line 55: | Line 56: | ||
| OS_IS_Helpdesk_HowToImprove = Currently the support unit in central GGUS is sufficient for us, this might be revised in the future as infrastructure will get larger. | | OS_IS_Helpdesk_HowToImprove = Currently the support unit in central GGUS is sufficient for us, this might be revised in the future as infrastructure will get larger. | ||
| OS_IS_CoreServices_Assessment = NGI_SK provides national instance of top level BDII. | | OS_IS_CoreServices_Assessment = NGI_SK provides national instance of top level BDII, WMS and PX for regional VO (VOCE), national CA, more local UIs. | ||
| OS_IS_CoreServices_Score = 3 | | OS_IS_CoreServices_Score = 3 | ||
| OS_IS_CoreServices_HowToImprove = Operation of national top BDII was stable, however we are in the process of setting up HA cluster for it to ensure availability in the case of HW failure. | | OS_IS_CoreServices_HowToImprove = Operation of national top BDII was stable, however we are in the process of setting up HA cluster for it to ensure availability in the case of HW failure. | ||
Line 62: | Line 63: | ||
| O_Policy_Assessment = NGI_SK implements EGI policies and procedures, and as we are small NGI, we do not actively participate in policy development. | | O_Policy_Assessment = NGI_SK implements EGI policies and procedures, and as we are small NGI, we do not actively participate in policy development. | ||
| O_Policy_Score = | | O_Policy_Score = 3 | ||
| O_Policy_HowToImprove = More actively participate in developing EGI policies and procedures, develop and sign national policies and procedures that are in alignment with those of EGI. | | O_Policy_HowToImprove = More actively participate in developing EGI policies and procedures, develop and sign national policies and procedures that are in alignment with those of EGI. | ||
Latest revision as of 18:55, 19 December 2012
User Services
Human Services (Table 1)
EGI-InSPIRE | EGI_DS | Name | Assessment | Score | How to Improve |
---|---|---|---|---|---|
NA3.3N | U-N-3 U-N-13 | Requirements Gathering | NGI_SK is trying to get new grid users by various means. | 3 | More active participation with EGI.eu/NA3 is expected. |
NA3.3N | U-N-14 U-N-15 | Application Database | Although we helped some of NGI_SK users to move their application to grid, we did not entered our results into the application database. | 2 | Insert already gridified applications into database, even if the same application is already there, entered by other partner. |
NA3.3N | U-N-16 U-N-17 | Training | Several trainings for grid users were provided (one course in October and several individual trainings). | 3 | We expect that user community will slowly grow and more training courses will be provided on demand. |
NA3.3N | U-N-12 U-N-18 U-N-19 | Consultancy | We provided consultations to system administratons of NGI_SK sites and individual consultantions to users and potential users. | 3 | Improving according to demands of admins and users is expected. |
Operations Services
Human Services (Table 2)
EGI-InSPIRE | EGI_DS | Name | Assessment | Score | How to Improve |
---|---|---|---|---|---|
SA1.4N | O-N-9 | Requirements Gathering | We did not received any specific requirements from our sites. | 2 | As the NGI infrastructure will get larger we expect more requirements to be collected. |
SA1.1N | O-N-9 | Operations Coordination | NGI_SK participates on regular OMB and OM meetings. | 3 | none |
SA1.2N | O-N-9 | Security | Security related activities were properly propagated and followed. | 3 | none |
Infrastructure Services (Table 3)
EGI-InSPIRE | EGI_DS | Name | Assessment | Score | How to Improve |
---|---|---|---|---|---|
SA1.3N | O-N-9 | Software Rollout | NGI_SK did not participated in Software Rollout. | 2 | We plan to setup EA resources and participate in Software Rollout for EMI 1.0 |
SA1.4N | O-N-3 | Monitoring | National Nagios instance is maintained and kept up-to-date. | 3 | none |
SA1.5N | O-N-2 | Accounting | All NGI_SK sites have migrated to ActiveMQ well ahead before the deadline. | 3 | none |
SA1.4N | O-N-1 O-N-4 | Configuration Repository and Operations Portal | We are using central GOCDB and Dashboard. | 0 | none |
SA1.6N SA1.7N | O-N-6 O-N-7 | Helpdesk | We provide dedicated support unit in central GGUS. | 3 | Currently the support unit in central GGUS is sufficient for us, this might be revised in the future as infrastructure will get larger. |
SA1.8N | O-N-5 O-N-8 | Core Services | NGI_SK provides national instance of top level BDII, WMS and PX for regional VO (VOCE), national CA, more local UIs. | 3 | Operation of national top BDII was stable, however we are in the process of setting up HA cluster for it to ensure availability in the case of HW failure. |
Other (Table 4)
EGI-InSPIRE | EGI_DS | Name | Assessment | Score | How to Improve |
---|---|---|---|---|---|
NA2.3N | Policy Development | NGI_SK implements EGI policies and procedures, and as we are small NGI, we do not actively participate in policy development. | 3 | More actively participate in developing EGI policies and procedures, develop and sign national policies and procedures that are in alignment with those of EGI. | |
NA2.2N | E-N-2 | Dissemination | SlovakGrid SK
|
4 | Visibility of Slovak NGI - SlovakGrid should be increased. |