Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

NGI International Task Review MS109 Georgia

From EGIWiki
Revision as of 18:53, 19 December 2012 by Krakow (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search



This page contains the assessment of the NGI International Task at year 1 of the EGI-InSPIRE project (one page per NGI). The NGI representatives are required to fill the tables according to the required information. The content will be integral part of the EGI-InSPIRE milestone MS109 "NGI International Task Review"

  • Main page with instructions
  • In order to edit this page, you need to log in with your EGI SSO account and click 'edit' on the tab (top of this page)

User Services

Human Services (Table 1)

Table 1: NGI Assessment: User Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA3.3N U-N-3 U-N-13 Requirements Gathering Currently only one application is running at GRENA-01-GE site. Requirements from user group are gathered in direct interaction with them. 3 Better system needs to be in place after application number will be increased.
NA3.3N U-N-14 U-N-15 Application Database We have not application database yet. 0 Inclusion of information regarding application database in trainings.
NA3.3N U-N-16 U-N-17 Training During October 25 – 29, 2010 the First CERN ATLAS‐South Caucasus Software / Computing Workshop & Tutorial was conducted in Georgia and GRENA was one of the organizer of the event. 2 More training and dissemination events are needed.
NA3.3N U-N-12 U-N-18 U-N-19 Consultancy Consultancy are provided through physical meetings and phone conferences. 3 In future better documentation will be needed for individual support cases.

Operations Services

Human Services (Table 2)

Table 2: NGI Assessment: Operations Services >> Human Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.4N O-N-9 Requirements Gathering NGI_GE has only one GRENA-01-GE site, because of this no specific requirements gathering process is in place. Requirements arise from daily operations. 3 Better system needs to be in place after number of sites and applications will be increased.
SA1.1N O-N-9 Operations Coordination NGI_GE has no funding in this activity. 0 write here
SA1.2N O-N-9 Security NGI_GE has no funding in this activity. 0 write here

Infrastructure Services (Table 3)

Table 3: NGI Assessment: Operations Services >> Infrastructure Services
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
SA1.3N O-N-9 Software Rollout NGI_GE has no funding in this activity. 0 write here
SA1.4N O-N-3 Monitoring Monitoring of GRENA-01-GE site is currently done by Serbian NGI. 0 NAGIOS monitoring will be deployed when new sites will be established at NGI_GE.
SA1.5N O-N-2 Accounting NGI_GE has no funding in this activity. 0 write here
SA1.4N O-N-1 O-N-4 Configuration Repository and Operations Portal We have not deployed the central configuration repository and the Operations Dashboard tools. 0 No plans to deploy these in the near future.
SA1.6N SA1.7N O-N-6 O-N-7 Helpdesk There is no need to deploy national helpdesk system. 3 Own RT system will be needed after number of sites and applications will be increased.
SA1.8N O-N-5 O-N-8 Core Services NGI_GE has no funding in this activity. 0 write here

Other (Table 4)

Table 4: NGI Assessment: Other
EGI-InSPIRE EGI_DS Name Assessment Score How to Improve
NA2.3N Policy Development NGI_GE has no funding in this activity. 0 write here
NA2.2N E-N-2 Dissemination NGI_GE has no funding in this activity. 0 write here