Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

NGI DE CH Operations Center:Operations Meeting:22072011

From EGIWiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Operations Meeting Main

Introduction

  • Evo web conference system
For this NGI-DE web conference we use the EVO online conference system. This procedure can take 15 minutes, if you do it the first  
time.
You can find more general information about EVO at https://wiki.egi.eu/wiki/NGI_DE:EVO 
The Channel is open starting at 14:30 to make tests possible. The meeting will start at 15:00.
The Meeting Access Information will be sent arround via email
  • Minutes of last meeting

Announcements

  • Meetings/conferences
The Steinbuch Centre for Computing of the Karlsruhe Institute of
Technology will run the 9th International GridKa School for Grid
and Cloud Computing
from September 5th to 9th, 2011.
You can find further information on our webpage:
http://www.kit.edu/gridka-school
This Grid educational event will use the DECH-VO and a small amount of resources. 
Q: Are there any objections?
A: No
  • Reminder: Quarter report
Dear NGI sites,
Jie Tao (email: jie.tao@kit.edu) is collecting the information for the coming quarter report (QR 5) covering May, June and July. She 
is expecting your contribution within the next week at the latest. 
As the last QR, she needs infos about:
Main achievements 
Issues and mitigations
conference/workshop organized  (date, location, title, participants, short report)
other conferences attended (date, location, title, participants, short report)
Publications (title, journal/conference, volume No., page No., authors)
ITWM, LRZ-LMU, JUELICH: how many staged rollout components do you have for the reported quarter? (i.e. number of patches tested)
Here you can find tha actual version of the QR:
https://wiki.egi.eu/wiki/Germany-QR5
https://wiki.egi.eu/wiki/Germany-KIT_Metrics
  • Availability/reliability statistics
The Availability/Reliability League statistics for June 2011 have been added to 
https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics
For your convenience, the pdf version of the statistics was send around via email.
Note that from May 2011 reports, suspension threshold is increased to 70% availability for 3 consecutive months per OMB decision,  
as it has been broadcasted already.
Site UNI_BONN and UNI-SIEGEN have just recertified in the month. UNI-BONN(1356) and TUDresden-ZIH(1355) have filled the ticket. But  
UNI-SIEGEN-HEP and UNI-KARLSRUHE have not yet answered the ticket. 
There is a ticket ID mistake. The two sites UNI-KARLSRUHE and UNI-SIEGEN –HEP got the same ticket id 1357. So UNI-KARLSRUHE has not  
got  the ticket at the end.
  • Monitoring
Dear NGI_DE sites,
please check this variable at your site bdii.
It is located in /opt/glite/etc/gip/ldif/glite-info-site.ldif and should be
GlueSiteOtherInfo: EGI_NGI=NGI_DE (or EGI_NGI=NGI_CH)
If configuring with yaim, set SITE_OTHER_EGI_NGI="NGI_DE".
After this parameter is set properly, you would find your site here:
http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_DE/
http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_CH/
  • Staged rollout/updates
  • Other
Operation Center NGI-DE/NGI-CH
https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center
All sites should have write access to these wiki pages. In consequence everyone has the possibility to enter the site reports and 
other things below the agenda of this operation meeting.

Round the sites

NGI-DE
  • BMRZ-FRANKFURT (Uni Frankfurt)
  • DESY-HH (Dmitri Ozerov)
ntr, business as usual
put new storage in the cluster (this was also reported in the past)
still high load
thinking about extension of the cluster within the next months
  • DESY-ZN
  • FZJuelich
  • Goegrid
  • GSI
  • ITWM (Martin Braun)
WN staged rollout: SAM test failed (this was also reported in the past)
gstat problem is solved
  • KIT (GridKa, FZK-LCG2, Dimitri Nilsen)
business as usual
currently testing the SGE
  • KIT (Uni Karlsruhe)
  • LRZ
  • MPI-K
  • MPPMU
  • RWTH Aachen
  • SCAI
  • Uni Bonn
  • Uni Dortmund
  • Uni Dresden
  • Uni Freiburg
  • Uni Mainz-Maigrid
  • Uni Siegen
  • Uni Wuppertal
SwiNG
  • CSCS (Pablo Fernandez)
not much to report
two links with different information are available concerning the ROD rotation table. Dimitri from KIT will replace the old  
link/information
  • PSI
  • Switch

Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Status ROD

  • Any problematic tickets?
No, couple of tickets but all were solved. One ticket was not updated but the test is green again->ticket  
can be closed if the alarm not reappears

AOB

If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.