Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:22072011"

From EGIWiki
Jump to navigation Jump to search
Line 2: Line 2:


==Introduction==
==Introduction==
 
* Evo web conference system
For this NGI-DE web conference we use the EVO online conference system. This procedure can take 15 minutes, if you do it the first 
time.
You can find more information about EVO at https://wiki.egi.eu/wiki/NGI_DE:EVO
The Channel is open starting at 14:30 to make tests possible.
The Meeting Access Information will be sent arround via email
* Minutes of last meeting
* Minutes of last meeting



Revision as of 09:26, 21 July 2011

Operations Meeting Main

Introduction

  • Evo web conference system
For this NGI-DE web conference we use the EVO online conference system. This procedure can take 15 minutes, if you do it the first  
time.
You can find more information about EVO at https://wiki.egi.eu/wiki/NGI_DE:EVO 
The Channel is open starting at 14:30 to make tests possible.
The Meeting Access Information will be sent arround via email
  • Minutes of last meeting

Announcements

  • Meetings/conferences
The Steinbuch Centre for Computing of the Karlsruhe Institute of
Technology will run the 9th International GridKa School for Grid
and Cloud Computing
from September 5th to 9th, 2011.
You can find further information on our webpage:
http://www.kit.edu/gridka-school
  • Reminder: Quarter report
Dear NGI sites,
Jie Tao (email: jie.tao@kit.edu) is collecting the information for the coming quarter report (QR 5) covering May, June and July. She 
is expecting your contribution within the next week at the latest. 
As the last QR, she needs infos about:
Main achievements 
Issues and mitigations
conference/workshop organized  (date, location, title, participants, short report)
other conferences attended (date, location, title, participants, short report)
Publications (title, journal/conference, volume No., page No., authors)
ITWM, LRZ-LMU, JUERLICH: how many staged rollout components do you have for the reported quarter? (i.e. number of patches tested)
  • Availability/reliability statistics
The Availability/Reliability League statistics for June 2011 have been added to 
https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics
For your convenience, the pdf version of the statistics was send around via email.
Note that from May 2011 reports, suspension threshold is increased to 70% availability for 3 consecutive months per OMB decision,  
as it has been broadcasted already.
  • Monitoring
Dear NGI_DE sites,
please check this variable at your site bdii.
It is located in /opt/glite/etc/gip/ldif/glite-info-site.ldif and should be
GlueSiteOtherInfo: EGI_NGI=NGI_DE
If configuring with yaim, set SITE_OTHER_EGI_NGI="NGI_DE".
After this parameter is set properly, you would find your site here:
http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_DE/
  • Staged rollout/updates

Round the sites

NGI-DE
  • BMRZ-FRANKFURT (Uni Frankfurt)
  • DESY-HH
  • DESY-ZN
  • FZJuelich
  • Goegrid
  • GSI
  • ITWM
  • KIT (GridKa, FZK-LCG2)
  • KIT (Uni Karlsruhe)
  • LRZ
  • MPI-K
  • MPPMU
  • RWTH Aachen
  • SCAI
  • Uni Bonn
  • Uni Dortmund
  • Uni Dresden
  • Uni Freiburg
  • Uni Mainz-Maigrid
  • Uni Siegen
  • Uni Wuppertal
SwiNG
  • CSCS
  • PSI
  • Switch

Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Status ROD

AOB

If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.