Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:22072011"
Jump to navigation
Jump to search
m (moved NGI DE CH Operatons Center:Operations Meeting:22072011 to DECH:Operations Meeting:22072011) |
|||
(9 intermediate revisions by 2 users not shown) | |||
Line 21: | Line 21: | ||
This Grid educational event will use the DECH-VO and a small amount of resources. | This Grid educational event will use the DECH-VO and a small amount of resources. | ||
Q: Are there any objections? | Q: Are there any objections? | ||
A: No | |||
* Reminder: Quarter report | * Reminder: Quarter report | ||
Dear NGI sites, | Dear NGI sites, | ||
Line 31: | Line 32: | ||
other conferences attended (date, location, title, participants, short report) | other conferences attended (date, location, title, participants, short report) | ||
Publications (title, journal/conference, volume No., page No., authors) | Publications (title, journal/conference, volume No., page No., authors) | ||
ITWM, LRZ-LMU, | ITWM, LRZ-LMU, JUELICH: how many staged rollout components do you have for the reported quarter? (i.e. number of patches tested) | ||
Here you can find tha actual version of the QR: | Here you can find tha actual version of the QR: | ||
https://wiki.egi.eu/wiki/Germany-QR5 | https://wiki.egi.eu/wiki/Germany-QR5 | ||
Line 50: | Line 51: | ||
please check this variable at your site bdii. | please check this variable at your site bdii. | ||
It is located in /opt/glite/etc/gip/ldif/glite-info-site.ldif and should be | It is located in /opt/glite/etc/gip/ldif/glite-info-site.ldif and should be | ||
GlueSiteOtherInfo: EGI_NGI=NGI_DE | GlueSiteOtherInfo: EGI_NGI=NGI_DE (or EGI_NGI=NGI_CH) | ||
If configuring with yaim, set SITE_OTHER_EGI_NGI="NGI_DE". | If configuring with yaim, set SITE_OTHER_EGI_NGI="NGI_DE". | ||
After this parameter is set properly, you would find your site here: | After this parameter is set properly, you would find your site here: | ||
http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_DE/ | http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_DE/ | ||
http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_CH/ | |||
* Staged rollout/updates | * Staged rollout/updates | ||
* Other | |||
Operation Center NGI-DE/NGI-CH | |||
https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center | |||
All sites should have write access to these wiki pages. In consequence everyone has the possibility to enter the site reports and | |||
other things below the agenda of this operation meeting. | |||
==Round the sites== | ==Round the sites== | ||
Line 60: | Line 69: | ||
; NGI-DE | ; NGI-DE | ||
* BMRZ-FRANKFURT (Uni Frankfurt) | * BMRZ-FRANKFURT (Uni Frankfurt) | ||
* DESY-HH | * DESY-HH (Dmitri Ozerov) | ||
ntr, business as usual | |||
put new storage in the cluster (this was also reported in the past) | |||
still high load | |||
thinking about extension of the cluster within the next months | |||
* DESY-ZN | * DESY-ZN | ||
* FZJuelich | * FZJuelich | ||
* Goegrid | * Goegrid | ||
* GSI | * GSI | ||
* ITWM | * ITWM (Martin Braun) | ||
* KIT (GridKa, FZK-LCG2) | WN staged rollout: SAM test failed (this was also reported in the past) | ||
gstat problem is solved | |||
* KIT (GridKa, FZK-LCG2, Dimitri Nilsen) | |||
business as usual | |||
currently testing the SGE | |||
* KIT (Uni Karlsruhe) | * KIT (Uni Karlsruhe) | ||
* LRZ | * LRZ | ||
Line 81: | Line 98: | ||
* Uni Wuppertal | * Uni Wuppertal | ||
; SwiNG | ; SwiNG | ||
* CSCS | * CSCS (Pablo Fernandez) | ||
not much to report | |||
two links with different information are available concerning the ROD rotation table. Dimitri from KIT will replace the old | |||
link/information | |||
* PSI | * PSI | ||
* Switch | * Switch | ||
Line 89: | Line 109: | ||
==Status ROD== | ==Status ROD== | ||
* Any problematic tickets? | * Any problematic tickets? | ||
No, couple of tickets but all were solved. One ticket was not updated but the test is green again->ticket | |||
can be closed if the alarm not reappears | |||
* Handover of the ROD shift | * Handover of the ROD shift | ||
** this week: cw29 18.07 24.07 Team6, CSCS/NGI_CH switched wk 27/29 | ** this week: cw29 18.07 24.07 Team6, CSCS/NGI_CH switched wk 27/29 | ||
Line 95: | Line 117: | ||
** cw31 01.08 07.08 Team4, JUELICH | ** cw31 01.08 07.08 Team4, JUELICH | ||
** cw32 08.08 14.08 Team5, BADW-LRZ | ** cw32 08.08 14.08 Team5, BADW-LRZ | ||
* ROD shift schedule https://wiki.egi.eu/wiki/ | * ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table | ||
==AOB== | ==AOB== | ||
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list. | If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list. |
Latest revision as of 16:16, 5 September 2011
Introduction
- Evo web conference system
For this NGI-DE web conference we use the EVO online conference system. This procedure can take 15 minutes, if you do it the first time. You can find more general information about EVO at https://wiki.egi.eu/wiki/NGI_DE:EVO The Channel is open starting at 14:30 to make tests possible. The meeting will start at 15:00. The Meeting Access Information will be sent arround via email
- Minutes of last meeting
Announcements
- Meetings/conferences
The Steinbuch Centre for Computing of the Karlsruhe Institute of Technology will run the 9th International GridKa School for Grid and Cloud Computing from September 5th to 9th, 2011. You can find further information on our webpage: http://www.kit.edu/gridka-school This Grid educational event will use the DECH-VO and a small amount of resources. Q: Are there any objections? A: No
- Reminder: Quarter report
Dear NGI sites, Jie Tao (email: jie.tao@kit.edu) is collecting the information for the coming quarter report (QR 5) covering May, June and July. She is expecting your contribution within the next week at the latest. As the last QR, she needs infos about: Main achievements Issues and mitigations conference/workshop organized (date, location, title, participants, short report) other conferences attended (date, location, title, participants, short report) Publications (title, journal/conference, volume No., page No., authors) ITWM, LRZ-LMU, JUELICH: how many staged rollout components do you have for the reported quarter? (i.e. number of patches tested) Here you can find tha actual version of the QR: https://wiki.egi.eu/wiki/Germany-QR5 https://wiki.egi.eu/wiki/Germany-KIT_Metrics
- Availability/reliability statistics
The Availability/Reliability League statistics for June 2011 have been added to https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics For your convenience, the pdf version of the statistics was send around via email. Note that from May 2011 reports, suspension threshold is increased to 70% availability for 3 consecutive months per OMB decision, as it has been broadcasted already.
Site UNI_BONN and UNI-SIEGEN have just recertified in the month. UNI-BONN(1356) and TUDresden-ZIH(1355) have filled the ticket. But UNI-SIEGEN-HEP and UNI-KARLSRUHE have not yet answered the ticket. There is a ticket ID mistake. The two sites UNI-KARLSRUHE and UNI-SIEGEN –HEP got the same ticket id 1357. So UNI-KARLSRUHE has not got the ticket at the end.
- Monitoring
Dear NGI_DE sites, please check this variable at your site bdii. It is located in /opt/glite/etc/gip/ldif/glite-info-site.ldif and should be GlueSiteOtherInfo: EGI_NGI=NGI_DE (or EGI_NGI=NGI_CH) If configuring with yaim, set SITE_OTHER_EGI_NGI="NGI_DE". After this parameter is set properly, you would find your site here: http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_DE/ http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_CH/
- Staged rollout/updates
- Other
Operation Center NGI-DE/NGI-CH https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center All sites should have write access to these wiki pages. In consequence everyone has the possibility to enter the site reports and other things below the agenda of this operation meeting.
Round the sites
- NGI-DE
- BMRZ-FRANKFURT (Uni Frankfurt)
- DESY-HH (Dmitri Ozerov)
ntr, business as usual put new storage in the cluster (this was also reported in the past) still high load thinking about extension of the cluster within the next months
- DESY-ZN
- FZJuelich
- Goegrid
- GSI
- ITWM (Martin Braun)
WN staged rollout: SAM test failed (this was also reported in the past) gstat problem is solved
- KIT (GridKa, FZK-LCG2, Dimitri Nilsen)
business as usual currently testing the SGE
- KIT (Uni Karlsruhe)
- LRZ
- MPI-K
- MPPMU
- RWTH Aachen
- SCAI
- Uni Bonn
- Uni Dortmund
- Uni Dresden
- Uni Freiburg
- Uni Mainz-Maigrid
- Uni Siegen
- Uni Wuppertal
- SwiNG
- CSCS (Pablo Fernandez)
not much to report two links with different information are available concerning the ROD rotation table. Dimitri from KIT will replace the old link/information
- PSI
- Switch
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Status ROD
- Any problematic tickets?
No, couple of tickets but all were solved. One ticket was not updated but the test is green again->ticket can be closed if the alarm not reappears
- Handover of the ROD shift
- this week: cw29 18.07 24.07 Team6, CSCS/NGI_CH switched wk 27/29
- next week: cw30 25.07 31.07 Team3, KIT
- cw31 01.08 07.08 Team4, JUELICH
- cw32 08.08 14.08 Team5, BADW-LRZ
- ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table
AOB
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.