Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:22072011"
Jump to navigation
Jump to search
Line 32: | Line 32: | ||
as it has been broadcasted already. | as it has been broadcasted already. | ||
* Monitoring | * Monitoring | ||
Dear NGI_DE sites, | |||
please check this variable at your site bdii. | |||
It is located in /opt/glite/etc/gip/ldif/glite-info-site.ldif and should be | |||
GlueSiteOtherInfo: EGI_NGI=NGI_DE | |||
If configuring with yaim, set SITE_OTHER_EGI_NGI="NGI_DE". | |||
After this parameter is set properly, you would find your site here: | |||
http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_DE/ | |||
* Staged rollout/updates | * Staged rollout/updates | ||
Revision as of 09:22, 21 July 2011
Introduction
- Minutes of last meeting
Announcements
- Meetings/conferences
The Steinbuch Centre for Computing of the Karlsruhe Institute of Technology will run the 9th International GridKa School for Grid and Cloud Computing from September 5th to 9th, 2011. You can find further information on our webpage: http://www.kit.edu/gridka-school
- Reminder: Quarter report
Dear NGI sites, Jie Tao (email: jie.tao@kit.edu) is collecting the information for the coming quarter report (QR 5) covering May, June and July. She is expecting your contribution within the next week at the latest. As the last QR, she needs infos about: Main achievements Issues and mitigations conference/workshop organized (date, location, title, participants, short report) other conferences attended (date, location, title, participants, short report) Publications (title, journal/conference, volume No., page No., authors) ITWM, LRZ-LMU, JUERLICH: how many staged rollout components do you have for the reported quarter? (i.e. number of patches tested)
- Availability/reliability statistics
The Availability/Reliability League statistics for June 2011 have been added to https://wiki.egi.eu/wiki/Availability_and_reliability_monthly_statistics For your convenience, the pdf version of the statistics was send around via email. Note that from May 2011 reports, suspension threshold is increased to 70% availability for 3 consecutive months per OMB decision, as it has been broadcasted already.
- Monitoring
Dear NGI_DE sites, please check this variable at your site bdii. It is located in /opt/glite/etc/gip/ldif/glite-info-site.ldif and should be GlueSiteOtherInfo: EGI_NGI=NGI_DE If configuring with yaim, set SITE_OTHER_EGI_NGI="NGI_DE". After this parameter is set properly, you would find your site here: http://gstat.egi.eu/gstat/summary/EGI_NGI/NGI_DE/
- Staged rollout/updates
Round the sites
- NGI-DE
- BMRZ-FRANKFURT (Uni Frankfurt)
- DESY-HH
- DESY-ZN
- FZJuelich
- Goegrid
- GSI
- ITWM
- KIT (GridKa, FZK-LCG2)
- KIT (Uni Karlsruhe)
- LRZ
- MPI-K
- MPPMU
- RWTH Aachen
- SCAI
- Uni Bonn
- Uni Dortmund
- Uni Dresden
- Uni Freiburg
- Uni Mainz-Maigrid
- Uni Siegen
- Uni Wuppertal
- SwiNG
- CSCS
- PSI
- Switch
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Status ROD
- Any problematic tickets?
- Handover of the ROD shift
- ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE:ROD-DE
AOB
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.