Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:14092012"

From EGIWiki
Jump to navigation Jump to search
Line 8: Line 8:


* Meetings/conferences
* Meetings/conferences
EMI: Technical Forum Prag next week
* Availability/reliability statistics
* Availability/reliability statistics
* Monitoring
* Monitoring
* Staged rollout/updates
* Staged rollout/updates

Revision as of 13:41, 14 September 2012

Operations Meeting Main

Introduction

  • Minutes of last meeting

Announcements

  • Meetings/conferences
EMI: Technical Forum Prag next week
  • Availability/reliability statistics
  • Monitoring
  • Staged rollout/updates

Round the sites

NGI-DE
  • BMRZ-FRANKFURT (Uni Frankfurt)
  • DESY-HH
  • DESY-ZN
  • FZJuelich
  • Goegrid
  • GSI
  • ITWM
  • KIT (GridKa, FZK-LCG2)
  • KIT (Uni Karlsruhe)
emi migration. plans to update WN to EMI 2. any experience whit emi-wn?
  • LRZ
  • MPI-K
  • MPPMU
- deployement of CVMFS
  • RWTH Aachen
  • SCAI
  • Uni Bonn
  • Uni Dortmund
  • Uni Dresden
  • Uni Freiburg
  • Uni Mainz-Maigrid
  • Uni Siegen
  • Uni Wuppertal
SwiNG
  • CSCS
  • PSI
  • Switch

Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Status ROD

AOB

If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.