Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:14062013"

From EGIWiki
Jump to navigation Jump to search
 
(6 intermediate revisions by 2 users not shown)
Line 7: Line 7:
  HepSpec:
  HepSpec:
  due to kernel performance depending on cores number -> 5-10% more performance.
  due to kernel performance depending on cores number -> 5-10% more performance.
  UMD 2.6.0 has been released
http://repository.egi.eu/2013/06/12/release-umd-2-6-0/


<pre>
<pre>
Line 33: Line 30:
* Meetings/conferences
* Meetings/conferences
* Availability/reliability statistics
* Availability/reliability statistics
Mai: 94 % 95 %
* Monitoring
* Monitoring
* Staged rollout/updates
* Staged rollout/updates
  UMD 2.6.0 has been released
http://repository.egi.eu/2013/06/12/release-umd-2-6-0/
* security
<pre>
2 Official advisories:
** AMBER information - Limited distribution **
EGI SVG  ADVISORY [EGI-SVG-2013-5268]
Title:      EGI SVG Advisory 'High' RISK - CREAM BUpdater improperly
validated input / arbitrary command execution [EGI-SVG-2013-5268]
Date:        2013-05-24
https://wiki.egi.eu/wiki/SVG:Advisory-SVG-2013-5268
** WHITE information - Unlimited distribution allowed
EGI CSIRT ADVISORY [EGI-ADV-20130514]
Title:      Linux kernel perf_event vulnerability (CVE-2013-2094)
[EGI-ADV-20130514]
Date:        2013-05-14
Updated:    2013-05-14
https://wiki.egi.eu/wiki/EGI_CSIRT:Alerts/kernel-2013-05-14
</pre>


==Round the sites==
==Round the sites==
Line 42: Line 64:
* DESY-HH
* DESY-HH
* DESY-ZN
* DESY-ZN
* FZJuelich
* FZJuelich
-Mathilde
nothing
* Goegrid
* Goegrid
* GSI
* GSI
* ITWM
* ITWM
Unfortunately we can not attend today. Here are some points:
** downtime of one DPM (raid disk replacement, more capacity)
** ticket because of insecure kernel version was resolved due to false positive
* KIT (GridKa, FZK-LCG2)
* KIT (GridKa, FZK-LCG2)
* KIT (Uni Karlsruhe)
* KIT (Uni Karlsruhe)
* LRZ
-Dimitri
https://helpdesk.ngi-de.eu/?mode=ticket_info&ticket_id=3334
 
* LRZ  
-Daniel
nothing special
question about MPI probes for globus(continue discussion offline)
* MPI-K
* MPI-K
* MPPMU
* MPPMU
Line 61: Line 100:
* Uni Wuppertal
* Uni Wuppertal
; SwiNG
; SwiNG
* CSCS
* CSCS
-Miguel
going to move WNs to SL6
* PSI
* PSI
-Fabio
+360TB fo starage
* Switch
* Switch


Line 72: Line 118:
* Handover of the ROD shift
* Handover of the ROD shift
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table
* ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table
UNICORE PROBES going to be critical next future


==AOB==
==AOB==


If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.

Latest revision as of 14:22, 14 June 2013

Operations Meeting Main

Introduction

  • Minutes of last meeting
HepSpec:
due to kernel performance depending on cores number -> 5-10% more performance.
 NOT in repository and why:
 For UMD-3:
- STS 1.1.0
- Hydra 3.0.0 (Also pending in UMD-2)
- Pseudonymity 1.2.0

For UMD-2:
- Globus OGSA-DAI
- CREAM-LSF

Note that the LSF module for CREAM has currently no early adopters, since the EA team migrated to EMI-3 (released in UMD-3).

SA2 is going to remove them from the Sw provisioning queue. If any of this product is relevant for your resource centres or your user communities, please contact me or the EGI Staged Rollout manager (João Pina) to agree on the staged rollout of these products.

SA2 is, of course, more than happy to release these products if requested and if there are sites willing to perform staged rollout.

Announcements

  • Meetings/conferences
  • Availability/reliability statistics
Mai: 94 % 95 %
  • Monitoring
  • Staged rollout/updates
 UMD 2.6.0 has been released
http://repository.egi.eu/2013/06/12/release-umd-2-6-0/


  • security
 2 Official advisories:

** AMBER information - Limited distribution **
EGI SVG   ADVISORY [EGI-SVG-2013-5268]
Title:       EGI SVG Advisory 'High' RISK - CREAM BUpdater improperly
validated input / arbitrary command execution [EGI-SVG-2013-5268]
Date:        2013-05-24
https://wiki.egi.eu/wiki/SVG:Advisory-SVG-2013-5268

** WHITE information - Unlimited distribution allowed
EGI CSIRT ADVISORY [EGI-ADV-20130514]
Title:       Linux kernel perf_event vulnerability (CVE-2013-2094)
[EGI-ADV-20130514]
Date:        2013-05-14
Updated:     2013-05-14
https://wiki.egi.eu/wiki/EGI_CSIRT:Alerts/kernel-2013-05-14

Round the sites

NGI-DE
  • BMRZ-FRANKFURT (Uni Frankfurt)
  • DESY-HH
  • DESY-ZN


  • FZJuelich
-Mathilde
nothing


  • Goegrid
  • GSI
  • ITWM
Unfortunately we can not attend today. Here are some points:
** downtime of one DPM (raid disk replacement, more capacity)
** ticket because of insecure kernel version was resolved due to false positive
  • KIT (GridKa, FZK-LCG2)
  • KIT (Uni Karlsruhe)
-Dimitri
https://helpdesk.ngi-de.eu/?mode=ticket_info&ticket_id=3334
  • LRZ
-Daniel
nothing special
question about MPI probes for globus(continue discussion offline)

  • MPI-K
  • MPPMU
  • RWTH Aachen
  • SCAI
  • Uni Bonn
  • Uni Dortmund
  • Uni Dresden
  • Uni Freiburg
  • Uni Mainz-Maigrid
  • Uni Siegen
  • Uni Wuppertal
SwiNG
  • CSCS
-Miguel
going to move WNs to SL6
  • PSI
-Fabio
+360TB fo starage
  • Switch

Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Status ROD

UNICORE PROBES going to be critical next future

AOB

If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.