Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:13042012"

From EGIWiki
Jump to navigation Jump to search
Line 26: Line 26:
* DESY-HH
* DESY-HH
* DESY-ZN
* DESY-ZN
* FZJuelich
* FZJuelich (Mathilda Romberg)
ntr
* Goegrid
* Goegrid
* GSI
* GSI
Line 57: Line 58:
  old Sun Blades and new network design, we'll move from hybrid
  old Sun Blades and new network design, we'll move from hybrid
  ethernet/infiniband to all-infiniband. The downtime should last no longer than 3 weeks.
  ethernet/infiniband to all-infiniband. The downtime should last no longer than 3 weeks.
* PSI
* PSI
* Switch
* Switch (Alessandro Ussai)


Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Revision as of 09:21, 23 April 2012

Operations Meeting Main

Introduction

  • Minutes of last meeting

Announcements

  • Availability/reliability statistics
https://documents.egi.eu/public/ShowDocument?docid=1091
BDII: 92%. but see: https://ggus.eu/ws/ticket_info.php?ticket=81094
NGI_DE: A:92 % R:96 %. first green month.
  • Monitoring
  • Staged rollout/updates

Round the sites

NGI-DE
  • BMRZ-FRANKFURT (Uni Frankfurt)
  • DESY-HH
  • DESY-ZN
  • FZJuelich (Mathilda Romberg)
ntr
  • Goegrid
  • GSI
  • ITWM
  • KIT (GridKa, FZK-LCG2)
auger SoftwareManager role.
  • KIT (Uni Karlsruhe)
  • LRZ
  • MPI-K
  • MPPMU
  • RWTH Aachen
  • SCAI
  • Uni Bonn
  • Uni Dortmund
  • Uni Dresden
  • Uni Freiburg
  • Uni Mainz-Maigrid
  • Uni Siegen
  • Uni Wuppertal
SwiNG
  • CSCS
All has been working fine until yesterday, when a network problem caused the GPFS scratch filesystem to die.
We were unable to  recover it and today we have rebuilt it from scratch:
ARC is still not working, but all gLite/EGI services are up and running.
This was an unscheduled downtime that will certainly affect A&R of this month.
Next week the grid cluster at CSCS enters a scheduled downtime.
We will move the hardware from the old building to the new datacentre
and introduce major changes in the infrastructure: new WNs to replace
old Sun Blades and new network design, we'll move from hybrid
ethernet/infiniband to all-infiniband. The downtime should last no longer than 3 weeks.
  • PSI
  • Switch (Alessandro Ussai)

Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Status ROD

Again tickets for ROD.

AOB

If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.