Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:09032012"
Jump to navigation
Jump to search
Line 33: | Line 33: | ||
* GSI | * GSI | ||
* ITWM | * ITWM | ||
ITWM will not be able to attend the phone conference. There is nothing special to report. | |||
* KIT (GridKa, FZK-LCG2) | * KIT (GridKa, FZK-LCG2) | ||
* KIT (Uni Karlsruhe) | * KIT (Uni Karlsruhe) |
Revision as of 11:26, 9 March 2012
Introduction
- Minutes of last meeting
Announcements
- Meetings/conferences
- EGI Community Forum https://www.egi.eu/indico/conferenceDisplay.py?confId=679
- Ops-Workshop im April 2012 Agenda not yet available.
- Availability/reliability statistics
Feb: VoOps: Av/Re= 97% UNI BONN=69% BDII: Av/Re=99,3%
- Monitoring
https://helpdesk.ngi-de.eu/index.php?mode=ticket_info&ticket_id=1969 https://helpdesk.ngi-de.eu/index.php?mode=ticket_info&ticket_id=1978
- Staged rollout/updates
Round the sites
- NGI-DE
- BMRZ-FRANKFURT (Uni Frankfurt)
- DESY-HH
- DESY-ZN
- FZJuelich
- Goegrid
- GSI
- ITWM
ITWM will not be able to attend the phone conference. There is nothing special to report.
- KIT (GridKa, FZK-LCG2)
- KIT (Uni Karlsruhe)
- LRZ
- MPI-K
- MPPMU
- RWTH Aachen
- SCAI
- Uni Bonn
- Uni Dortmund
- Uni Dresden
- Uni Freiburg
- Uni Mainz-Maigrid
- Uni Siegen
- Uni Wuppertal
- SwiNG
- CSCS
- PSI
- Switch
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Status ROD
- Any problematic tickets?
- Handover of the ROD shift
- ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table
AOB
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.