Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:06092013"

From EGIWiki
Jump to navigation Jump to search
Line 35: Line 35:
* WLCG Taskforces
* WLCG Taskforces
  SL6 Migration. 31.10.13
  SL6 Migration. 31.10.13
https://twiki.cern.ch/twiki/bin/view/LCG/SL6DeploymentSites


==Round the sites==
==Round the sites==

Revision as of 11:21, 6 September 2013

Operations Meeting Main

Introduction

  • Minutes of last meeting

Announcements

  • Meetings/conferences
EGI Techincal Forum Madrid(16-20 Sep) 
http://tf2013.egi.eu/
CHEP 2013(14-18 Okt)
http://www.chep2013.org/

2013 WLCG Collaboration Workshop (11-12 November 2013)
https://indico.cern.ch/conferenceDisplay.py?confId=251191‎
  • Availability/reliability statistics
Jul: 93 % 95 %
  • Monitoring
  • Staged rollout/updates
  • new Sites
LRZ
MaiGrid -> mainzgrid
  • OnGoing
End of Security Updates and Support of dCache v. 1.9.12 is scheduled on 31-09-2013.

CAs should issue SHA-2 end-entity certificates by default as of 01-10-2013
SHA-2 compliant services:
- eu.egi.sec.CREAMCE-SHA-2
- eu.egi.sec.VOMS-SHA-2
- eu.egi.sec.WMS-SHA-2
  • WLCG Taskforces
SL6 Migration. 31.10.13
https://twiki.cern.ch/twiki/bin/view/LCG/SL6DeploymentSites

Round the sites

NGI-DE
  • BMRZ-FRANKFURT (Uni Frankfurt)
  • DESY-HH
  • DESY-ZN
  • FZJuelich
  • Goegrid
  • GSI
  • ITWM
  • KIT (GridKa, FZK-LCG2)
  • KIT (Uni Karlsruhe)
  • LRZ
  • MPI-K
  • MPPMU
  • RWTH Aachen
  • SCAI
  • Uni Bonn
  • Uni Dortmund
  • Uni Dresden
  • Uni Freiburg
  • Uni Mainz-Maigrid
  • Uni Siegen
  • Uni Wuppertal
SwiNG
  • CSCS
  • PSI
  • Switch

Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Status ROD

  • Any problematic tickets?
Take care of HSA2 tickets
37      09.09	 15.09	 Team6, CSCS/NGI-CH	
38	 16.09	 22.09	 Team1, DESY	
39	 23.09	 29.09	 Team2, FhG (SCAI)	
40	 30.09	 06.10	 Team3, KIT

AOB

If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.