Line 36: Line 36:
  For the problem of UNI-Siegen-HEP we will wait untill the statistics of August and we will see if the situation has improved.
  For the problem of UNI-Siegen-HEP we will wait untill the statistics of August and we will see if the situation has improved.
* Monitoring
* Monitoring
Our Nagios box was updated. Last week there were some problems with notifications and the tests were not up to date. This problem 
was caused by the central instance at CERN. EGI monitoring team is involved.
* Staged rollout/updates
* Staged rollout/updates



Revision as of 09:15, 7 September 2011

Operations Meeting Main

How to connect

Connect Via Phone:

Following DFN ISDN Gateways are available: Germany - Berlin:+49-30-2541080 Germany - Stuttgart:+49-711-6330190

If requested please enter following conference number: 97922688

Introduction

  • Minutes of last meeting

Announcements

  • Meetings/conferences
5-9 September 2011
GridKa School 
Karlsruhe, Germany
http://gridka-school.scc.kit.edu/2011) 
8-9 September 2011
Paradiso workshop
Brussels, Belgium 
http://www.paradiso-fp7.eu )
19 -23 September 2011
EGI Technical Forum
Lyon, France (http://tf2011.egi.eu/)
  • Availability/reliability statistics
There was the question from John Alan Kennedy from MPPMU why MPPMU's scheduled downtime  [08-07-2011 16:00 to 15-07-2011 16:00 
UTC] was not taken into account. Explanation from Dimitris Zilaskos: Downtime was only marked as 'at warning'.
For the problem of UNI-Siegen-HEP we will wait untill the statistics of August and we will see if the situation has improved.
  • Monitoring
Our Nagios box was updated. Last week there were some problems with notifications and the tests were not up to date. This problem  
was caused by the central instance at CERN. EGI monitoring team is involved.
  • Staged rollout/updates

Round the sites

NGI-DE
  • BMRZ-FRANKFURT (Uni Frankfurt)
  • DESY-HH
new wn's (exchange the old hardware), now we have 37kHS and ~4800 jobs slots at DESY-HH.
100% occupancy (mostly cms, atlas, but also ilc, and hera).
  • DESY-ZN
  • FZJuelich
  • Goegrid
  • GSI
  • ITWM
  • KIT (GridKa, FZK-LCG2)
Business as usual.
GridKA school next week. 
  • KIT (Uni Karlsruhe)
  • LRZ
  • MPI-K
  • MPPMU
  • RWTH Aachen
  • SCAI
  • Uni Bonn
  • Uni Dortmund
  • Uni Dresden
  • Uni Freiburg
  • Uni Mainz-Maigrid
  • Uni Siegen
  • Uni Wuppertal
SwiNG
  • CSCS
Business as usual despite some issues with Lustre filesystem (scratch) that we hope to fix in the upcoming weeks by replacing it  
by GPFS with SSDs for metadata.
  • PSI
  • Switch

Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.

Status ROD

  • Any problematic tickets?
  • Handover of the ROD shift

(from DESY-HH, week before) - nothing serious to report, but to mention that In NGI_DE there is discrepancy in the number of published job slots (GoeGrid - two times then in reality) and in the apel statistics (MPPMU - wrong SI2K). Proposal - can we have the table in NGI_DE wiki with the actual number of job slots, total HS for all sites in NGI_DE, so that we can compare this with the information from bddi,gstat,gridview and contact sites in case of disagreement?

This week: 35 29.08 04.09 Team2, FhG (SCAI)

Next weeks:

36 05.09 11.09 Team3, KIT

37 12.09 18.09 Team4, JUELICH

38 19.09 25.09 Team5, BADW-LRZ

  • ROD Workshop @ EGI TechForum.
ROD team’s session on Thursday September 22nd in afternoon at 4. Have a
look at the agenda at: https://www.egi.eu/indico/contributionDisplay.py?contribId=35&confId=452.

AOB

If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.