Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:02092011"
Jump to navigation
Jump to search
Line 23: | Line 23: | ||
* Availability/reliability statistics | * Availability/reliability statistics | ||
There was the question from John Alan Kennedy from MPPMU why MPPMU's scheduled downtime [08-07-2011 16:00 to 15-07-2011 16:00 | There was the question from John Alan Kennedy from MPPMU why MPPMU's scheduled downtime [08-07-2011 16:00 to 15-07-2011 16:00 | ||
UTC] was not taken into account. Explanation: Downtime was only marked as 'at warning'. | UTC] was not taken into account. Explanation from Dimitris Zilaskos: Downtime was only marked as 'at warning'. | ||
For the problem of UNI-Siegen-HEP we will wait untill the statistics of August and we will see if the situation has improved. | For the problem of UNI-Siegen-HEP we will wait untill the statistics of August and we will see if the situation has improved. |
Revision as of 11:31, 2 September 2011
Introduction
- Minutes of last meeting
Announcements
- Meetings/conferences
5-9 September 2011 GridKa School Karlsruhe, Germany http://gridka-school.scc.kit.edu/2011)
8-9 September 2011 Paradiso workshop Brussels, Belgium http://www.paradiso-fp7.eu )
19 -23 September 2011 EGI Technical Forum Lyon, France (http://tf2011.egi.eu/)
- Availability/reliability statistics
There was the question from John Alan Kennedy from MPPMU why MPPMU's scheduled downtime [08-07-2011 16:00 to 15-07-2011 16:00 UTC] was not taken into account. Explanation from Dimitris Zilaskos: Downtime was only marked as 'at warning'.
For the problem of UNI-Siegen-HEP we will wait untill the statistics of August and we will see if the situation has improved.
- Monitoring
- Staged rollout/updates
Round the sites
- NGI-DE
- BMRZ-FRANKFURT (Uni Frankfurt)
- DESY-HH
- DESY-ZN
- FZJuelich
- Goegrid
- GSI
- ITWM
- KIT (GridKa, FZK-LCG2)
- KIT (Uni Karlsruhe)
- LRZ
- MPI-K
- MPPMU
- RWTH Aachen
- SCAI
- Uni Bonn
- Uni Dortmund
- Uni Dresden
- Uni Freiburg
- Uni Mainz-Maigrid
- Uni Siegen
- Uni Wuppertal
- SwiNG
- CSCS
- PSI
- Switch
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Status ROD
- Any problematic tickets?
- Handover of the ROD shift
- ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE_CH_Operations_Center:Operations_Teams#Shifts_rotation_table
AOB
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.