Difference between revisions of "NGI DE CH Operations Center:Operations Meeting:01072011"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
* Monitoring | * Monitoring | ||
* Staged rollout/updates | * Staged rollout/updates | ||
* Other | |||
Site UNI-SIEGEN-HEP and site UNI-BONN are full recertified and back to the production | |||
==Round the sites== | ==Round the sites== |
Revision as of 11:45, 30 June 2011
Introduction
- Minutes of last meeting
Announcements
- Meetings/conferences
- Availability/reliability statistics
NGI-DE in average 97%/98% problem site (BMRZ-FRANKFURT) ticket 1304, 73%/73% Solution: Cause: gLite 3.2 migration, misconfigurations and some disk space issues. Problems have been solved
- Monitoring
- Staged rollout/updates
- Other
Site UNI-SIEGEN-HEP and site UNI-BONN are full recertified and back to the production
Round the sites
- NGI-DE
- BMRZ-FRANKFURT (Uni Frankfurt)
- DESY-HH
- DESY-ZN
- FZJuelich
- Goegrid
- GSI
- ITWM
- KIT (GridKa, FZK-LCG2)
CREAM CE Instability still there
- KIT (Uni Karlsruhe)
- LRZ
- MPI-K
- MPPMU
- RWTH Aachen
- SCAI
- Uni Bonn
- Uni Dortmund
- Uni Dresden
- Uni Freiburg
- Uni Mainz-Maigrid
- Uni Siegen
- Uni Wuppertal
- SwiNG
- CSCS
- PSI
- Switch
Note: please update your entry at https://wiki.egi.eu/wiki/NGI_DE:Sites if needed.
Status ROD
- Any problematic tickets?
- Handover of the ROD shift
- ROD shift schedule https://wiki.egi.eu/wiki/NGI_DE:ROD-DE
AOB
If you have additional topics to be discussed during the meeting, please submit them in advance via our email list email list.