Difference between revisions of "NGI DE:GOP-2013-Annex/NGI-DE other procedures"
Jump to navigation
Jump to search
Line 10: | Line 10: | ||
* Site Migration from D-Grid to NGI-DE/EGI | * Site Migration from D-Grid to NGI-DE/EGI | ||
** if needed | ** if needed | ||
* | * Final documentation of VO work in de-registration process of projects | ||
</onlyinclude><!-- Do not remove this line --> | </onlyinclude><!-- Do not remove this line --> |
Latest revision as of 20:32, 29 November 2012
Draft - not an approved document
GOP-2013-Annex/NGI-DE other procedures
GOP-2013-Annex
Annex “NGI-DE other procedures”
Appendixes:
- “D-Grid procedure about end of D-Grid-VO” http://www.d-grid.de/fileadmin/user_upload/documents/Kern-D-Grid/Betriebskonzept/D-Grid-Betriebskonzept-VO-Ausscheiden-1.0.pdf
- VO-Migration Service from D-Grid to NGI-DE/EGI
- if needed
- Site Migration from D-Grid to NGI-DE/EGI
- if needed
- Final documentation of VO work in de-registration process of projects