Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "HOWTO02 Site Certification Required Documentation"

From EGIWiki
Jump to navigation Jump to search
Line 11: Line 11:
! Description
! Description
|-
|-
| Site Certification Manual
| Site Certification Procedure
| https://wiki.egi.eu/wiki/SiteCertMan
| https://wiki.egi.eu/wiki/SiteCertMan
| A manual describing the steps required to register new sites and certify new and suspended sites.
| Procedure document describing the steps required to register new sites and certify new and suspended sites.
|-
|-
| Grid Site Operations Policy  
| Grid Site Operations Policy  
Line 31: Line 31:
| Any NGI SLA or OLA relevant to that NGI (an internal  NGI document, so no links.)  
| Any NGI SLA or OLA relevant to that NGI (an internal  NGI document, so no links.)  
Note: if the NGI and site wish, there is a template in EGI for creating an OLA between them.
Note: if the NGI and site wish, there is a template in EGI for creating an OLA between them.
|-
| Site Decommissioning Procedure
| Under construction
| Procedure document describing the steps required to unregister/decommission a site.
|-
|-
| GGUS Documentation
| GGUS Documentation

Revision as of 05:05, 2 February 2011

This is a table of documents required for Site registration and certification.

The Site personnel should read and understand at least the first five documents. It is a further requirement that the OLA between the NGI and Site, the Grid Site Operations Policy and Site Registration Security Policy are accepted by the Site Operations Manager. Further, documents referred within the latter two policy documents should also be understood.

Name Link Description
Site Certification Procedure https://wiki.egi.eu/wiki/SiteCertMan Procedure document describing the steps required to register new sites and certify new and suspended sites.
Grid Site Operations Policy https://documents.egi.eu/document/75 Policy document describing the various conditions that a site must uphold to be operational.
Site Registration Security Policy https://documents.egi.eu/document/76 Policy document describing the minimum requirements for registering a site that must be entered into the GOCDB.
Operational Procedures for NGIs and Sites. https://wiki.egi.eu/wiki/Operations:NGISandSitesOPSmanual Operational procedures for NGIs and sites, relevant to both managers and administrators.
SLA/OLA Any NGI SLA or OLA relevant to that NGI (an internal NGI document, so no links.)

Note: if the NGI and site wish, there is a template in EGI for creating an OLA between them.

Site Decommissioning Procedure Under construction Procedure document describing the steps required to unregister/decommission a site.
GGUS Documentation https://gus.fzk.de/pages/docu.php A collection of documentation relevant to GGUS. GGUS User Guide, FAQ for direct site notification are probably the most helpful
GOCDB https://goc.gridops.org
Operations Dashboard https://operations-portal.in2p3.fr/
NAGIOS NGI regional Link available via the dashboard This is the regional Nagios instance which sends out the regular checks of the infrastructure.
GSTAT http://gstat-prod.cern.ch/gstat/geo/openlayers
VO information


Back to SiteCertMan#Site_registration_procedure