Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "HOWTO02 Site Certification Required Documentation"

From EGIWiki
Jump to navigation Jump to search
(Deprecate page)
Tag: Replaced
 
(14 intermediate revisions by 4 users not shown)
Line 1: Line 1:
This is a table of documents required for Resource Centre registration and certification.
{{Template: Op menubar}} {{Template:Doc_menubar}}


The Resource Centre administrators should read and understand the first five documents.
{{DeprecatedAndMovedTo|new_location=https://docs.egi.eu/providers/operations-manuals/howto02_site_certification_required_documentation/}}
It is a further requirement that the OLA between the NGI and Site, the Grid Site Operations Policy
and Site Registration Security Policy are accepted by the Site Operations Manager.  Further, documents
referred within the latter two policy documents should also be understood.


=Documentation=
[[Category:Operations_Manuals]]
{| border="1"
|- style="background-color: lightgray;"
| Documentation
| Link
| Description
|-
| Site Certification Procedure
| https://wiki.egi.eu/wiki/PROC09
| Procedure document describing the steps required to register new Resource Centres and certify new and suspended ones.
|-
| Grid Site Operations Policy
| https://documents.egi.eu/document/75
| Policy document describing the various conditions that a site must uphold to be operational.
|-
| Site Registration Security Policy
| https://documents.egi.eu/document/76
| Policy document describing the minimum requirements for registering a site that must be entered into the GOCDB.
|-
| Operational Procedures for NGIs and Sites.
| https://wiki.egi.eu/wiki/Operations:NGISandSitesOPSmanual
| Operational procedures for NGIs and sites, relevant to both managers and administrators.
|-
| Resource Centre Operational Level Agreement (OLA)
| https://documents.egi.eu/document/31
|
|-
| Site Decommissioning Procedure
| Under construction
| Procedure document describing the steps required to unregister/decommission a site.
|-
| GGUS Documentation and FAQs
| https://gus.fzk.de/pages/docu.php and https://wiki.egi.eu/wiki/GGUS:FAQ
| A collection of documentation relevant to GGUS.  GGUS User Guide, FAQ for direct site notification are probably the most helpful
|-
|}
 
 
=Tools=
{| border="1" cellspacing="0" cellpadding="4" align="left"
! Tools
! Link
! Description
|-
| GOCDB
| https://goc.egi.eu/
|
|-
| Operations Dashboard
| http://operations-portal.egi.eu/
|
|-
| Service Availability Monitoring
| https://wiki.egi.eu/wiki/SAM
| The Service Availability Monitoring system (SAM) periodically checks the functionality of the grid services deplyoed/
|-
| GSTAT
| http://gstat.egi.eu/gstat/summary/
|
|-
| EGI Operations Architecture
| https://documents.egi.eu/document/218
| Document describing the roles and responsibilities of the various layers in EGI and also the architectural nomenclature.
|-
|}

Latest revision as of 14:33, 25 August 2021