Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "HOWTO02 Site Certification Required Documentation"

From EGIWiki
Jump to navigation Jump to search
(Deprecate page)
Tag: Replaced
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
{{Template: Op menubar}}
{{Template: Op menubar}} {{Template:Doc_menubar}}
{{Template:Doc_menubar}}


[[Category:Operations Manuals]]
{{DeprecatedAndMovedTo|new_location=https://docs.egi.eu/providers/operations-manuals/howto02_site_certification_required_documentation/}}
{{TOC_right}}


This is a table of documents required for Resource Centre registration and certification.
[[Category:Operations_Manuals]]
 
The Resource Centre administrators should read and understand the first five documents.
It is a further requirement that the OLA between the NGI and RC, and the Service Operations Policy are accepted by the Site Operations Manager.  Further, documents
referred within the Service Operations Policy should also be understood.
 
=Documentation=
{| border="1"
|- style="background-color: lightgray;"
| Documentation
| Link
| Description
|-
| Resource Centre Registration and Certification
| [[PROC09]]
| Procedure document describing the steps required to register new Resource Centres and certify new and suspended ones.
|-
| Service Operations Policy
| https://documents.egi.eu/document/3601
| This security policy presents the conditions that apply to anyone running a Service on the Infrastructure, or to anyone providing a Service that is part of the Infrastructure.
|-
| Resource Centre Operational Level Agreement (OLA)
| https://documents.egi.eu/document/31
|
|-
| Resource Centre Decommissioning Procedure
| [https://confluence.egi.eu/display/EGIPP/PROC11+Resource+Centre+Decommissioning PROC11]
| Procedure document describing the steps required to decommission a Resource Centre.
|-
| Production Service Decommissioning Procedure
| [https://confluence.egi.eu/display/EGIPP/PROC12+Production+Service+Decommissioning PROC12]
| Procedure document describing the steps required to decommission a production service.
|-
| GGUS Documentation and FAQs
| https://ggus.eu and [[GGUS:FAQ]]
| A collection of documentation relevant to GGUS.  GGUS User Guide, FAQ for direct site notification are probably the most helpful
|-
|}
 
=Tools=
{| border="1"
|- style="background-color: lightgray;"
| Tools
| Link
| Description
|-
| GOCDB
| https://goc.egi.eu/
|
|-
| Operations Dashboard
| http://operations-portal.egi.eu/
|
|-
| Service Availability Monitoring
| [[SAM]]
| The Service Availability Monitoring system (SAM) periodically checks the functionality of the grid services deplyoed/
|-
| GSTAT
| http://gstat.egi.eu/gstat/summary/
|
|-
| EGI Operations Architecture
| https://documents.egi.eu/document/218
| Document describing the roles and responsibilities of the various layers in EGI and also the architectural nomenclature.
|-
|}

Latest revision as of 14:33, 25 August 2021