Technology Software Component Delivery Software Provisioning UMD Middleware Cloud Middleware Distribution Containers Distribution Technology Glossary


Quality Assurance | Quality Criteria Definition | Quality Criteria Dissemination | Quality Criteria Verification | Verifier Guideline | Verification Testbed | Glossary





Objective

The main objective of the TSA2.3 is to verify the quality of the software provided by the TP before entering the SR phase and going to production. By doing so we prevent that software that might work enters into the SR and even goes into production but that doesn´t follow the quality criteria defined in TSA2.2. Some of the reasons for doing the verification before the software enters the stage rollout are:

- Check that the bugs reported in the previous release of the software have been corrected (work in collaboration with DMSU) by the TP.

- Software can work well in the SR but might not have all the functionalities required

- Software might not be safe, well documented, or have the necessary installation rules or licenses

The Verification Process

When a new product is available, the TP has to follow the NSRW. Once the software is correctly uploaded to the repository, the release enters into the verification phase. The requirements are that the TP has to provide all the necessary information to the verifier (QCV) so that the QCV can assess that the TP has tested in advance the quality of the software. Depending on the type of release, different actions will be taken by the QCV, Verification process is described in detail in the EGI Verifier Guideline.

QC Verification Reports

RT workflow and Verification Templates links are available in this page. First of all verifiers must check QC service mapping to know which test must be verified for each product. This service mapping is available here QC Verification service mapping and Verification/Executive Summary templates are available here: QC Verification Templates.

Verifiers must fill all required fields for each product and write a Verification process summary into Executive Summary, this summary should include:

  • A short summary of the installation and configuration process: Installation and configuration were successful?, If not explain any issue or bug found. If the product was rejected explain why.
  • If its necessary Verifiers should include a comment for StageRollout: Configuration changes or minor issues found verifying the product.
  • If a new QC is necessary and is not included, Verifiers must write a comment to SA2.2 to change current QC.

Verification Team

Verifiers team is updated for each UMD release and it is available here: SA2.3 Verifiers List. All verifiers are included in the SSO sw-rel-qc group that includes a mailing list and permissions to modify RT tickets related with the verification process.

Reference Documents

DocDB link Release Date Document
364 11. 08. 2011 UMD Quality Criteria
418 11. 08. 2011 UMD Products service mapping
417 11. 08. 2011 QC Verification Templates

Metrics

Metric Description
M.SA2.4 Number of new releases validated against defined criteria: Measures the workload on the validation team.
M.SA2.5 Mean time taken to validate a releas: Indicates how responsive the team is to validating releases.
M.SA2.6 Number of releases failing validation: Indicates the quality assurance process of the software providers.

SLAs

EGI SLAs negotiated with the TPs

EMI-EGI SLA

Verification engineer skill matrix

Verification Cheat Sheet
Product\Institute CESGA IFCA IFIC INFN JÜLICH LIP COMMENTS
ARC CE * *
ARC compute cli * *
ARC Infosys * *
dCache *
gLite MPI * *
CREAM_torque * *
CREAM_lsf *
WMS * *
LB * *
FTS No verifiers available yet.
DPM *
LFC_mySQL *
LFC_Oracle No verifiers available yet. Oracle training required.
StoRM * *
APEL *
DGAS *
BDII *
UI *
PX *
VOMS_mySQL *
VOMS_Oracle No verifiers available yet. Oracle training required.
HYDRA No verifiers available yet.
ARGUS *
UNICORE TSI *
UNICORE WS *
UNICORE Client *
UNICORE Registry *
UNICORE Gateway *
UNICORE Hila *
UNICORE xuudb *
UNICORE Uvos *
AMGA *
SAGA-SD No verifiers available yet.
GRAM5 *
GridFTP *
myProxy *
RLS *
GridWay Training required. IGE Contact i.marin(at)fdi.ucm.es
SAM *


Early Adopters per UMD product