Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI Infrastructure operations oversight"

From EGIWiki
Jump to navigation Jump to search
Line 30: Line 30:
In this section were collected all work instructions containing detailed instructions that specify exactly what steps to follow to carry out an activity.  
In this section were collected all work instructions containing detailed instructions that specify exactly what steps to follow to carry out an activity.  


* Dealing with the GGUS tickets assigned to COD :[http://tinyurl.com/2ws735h GGUS tickets assigned to COD]
* Dealing with the GGUS tickets assigned to COD: [http://tinyurl.com/2ws735h Link to all GGUS tickets assigned to COD]
* Handling availability/reliability reports: [[Availability_and_reliability_internal_procedure_for_COD]]
** COD shifter is oblige to check current status of all tickets assigned in GGUS to COD
** If the ticket is waiting for COD action then he/she should perform the action
*** [[Procedure_to_handle_new_ROD_certification_GGUS_tickets | New ROD team certification work instruction]]
** If the shifter doesn't know what kind of action should be taken, he/she should contact with COD managers
* Handling availability/reliability reports: [[Availability_and_reliability_internal_procedure_for_COD | Availability and reliability work instruction]]
** [[Availability_and_reliability_internal_procedure_for_COD_tickets |  Ticket Numbers for COD for handling AR reports]]
** [[Availability_and_reliability_internal_procedure_for_COD_tickets |  Ticket Numbers for COD for handling AR reports]]
** [[Availability_and_reliability_internal_procedure_for_COD_metrics |  AR reports metrics]]
** [[Availability_and_reliability_internal_procedure_for_COD_metrics |  AR reports metrics]]
** [[Procedure_to_handle_new_ROD_certification_GGUS_tickets | New ROD team certification work instruction]]


== Internal area ==
== Internal area ==

Revision as of 13:48, 26 November 2010

EGI.eu Operations Oversight Pages

EGI Grid Operations oversight of the e-Infrastructure is a co-ordination task for ensuring that GRID monitoring across EGI runs smoothly. This team communicates among the 3 groups - Operations and e-Infrastructure Oversight (OE); Operational Documentation (OD); and "Coordination of interoperations between NGIs and with other Grids".

The Operations oversight team works with the Tool Developers (and particularly the OTAG group), NGIs and their Operations Teams (ROD). There are regular phone meetings for the co-ordinators and others working in the tasks. The OE co-ordinators also organise face to face meetings for the ROD teams 3 to 4 times a year.

Co-ordinators:
Ron Trompert (Chair), Marcin Radecki, Luuk Uljee
Deputy:
Malgorzata Krakowian



COD offical web pages


COD procedures

In this section were collected all procedures in force for COD

COD shifters daily work instructions

In this section were collected all work instructions containing detailed instructions that specify exactly what steps to follow to carry out an activity.

Internal area


NOTE: all procedures should contain the following template: https://wiki.egi.eu/wiki/PDT:Procedure_Template

Approved

To be approved by OMB

OTAG topics

Pages in draft state