Difference between revisions of "EGI Infrastructure operations oversight"
Line 21: | Line 21: | ||
== COD procedures == | == COD procedures == | ||
In this section were collected all procedures in force for COD | |||
* [[Operations:CODOPSmanual | ROD oversight duties]] | * [[Operations:CODOPSmanual | ROD oversight duties]] | ||
* [[Operations:NewNGIs_creation | New NGI creation process coordination]] | * [[Operations:NewNGIs_creation | New NGI creation process coordination]] | ||
* [[Availability_and_reliability_monthly_statistics]] | * [[Availability_and_reliability_monthly_statistics]] | ||
== COD shifters daily work | |||
== COD shifters daily work instructions == | |||
In this section were collected all work instructions containing detailed instructions that specify exactly what steps to follow to carry out an activity. | |||
* Dealing with the GGUS tickets assigned to COD :[http://tinyurl.com/2ws735h GGUS tickets assigned to COD] | * Dealing with the GGUS tickets assigned to COD :[http://tinyurl.com/2ws735h GGUS tickets assigned to COD] |
Revision as of 13:41, 26 November 2010
EGI.eu Operations Oversight Pages
EGI Grid Operations oversight of the e-Infrastructure is a co-ordination task for ensuring that GRID monitoring across EGI runs smoothly. This team communicates among the 3 groups - Operations and e-Infrastructure Oversight (OE); Operational Documentation (OD); and "Coordination of interoperations between NGIs and with other Grids".
The Operations oversight team works with the Tool Developers (and particularly the OTAG group), NGIs and their Operations Teams (ROD). There are regular phone meetings for the co-ordinators and others working in the tasks. The OE co-ordinators also organise face to face meetings for the ROD teams 3 to 4 times a year.
- Co-ordinators:
- Ron Trompert (Chair), Marcin Radecki, Luuk Uljee
- Deputy:
- Malgorzata Krakowian
COD offical web pages
COD procedures
In this section were collected all procedures in force for COD
- ROD oversight duties
- New NGI creation process coordination
- Availability_and_reliability_monthly_statistics
COD shifters daily work instructions
In this section were collected all work instructions containing detailed instructions that specify exactly what steps to follow to carry out an activity.
- Dealing with the GGUS tickets assigned to COD :GGUS tickets assigned to COD
- Handling availability/reliability reports: Availability_and_reliability_internal_procedure_for_COD
Internal area
NOTE: all procedures should contain the following template: https://wiki.egi.eu/wiki/PDT:Procedure_Template
Approved
To be approved by OMB
OTAG topics
- RT tickets
- COD interaction with Dashboard team (draft)
- COD topic to be discussed on OTAG meeting
- Collection of dashboard requirements regarding COD work (draft)