Line 1: Line 1:
[[Category:Security Policy Group (SPG) ]]
'''This page is in draft'''
'''This page is in draft'''


Line 7: Line 8:
The announcement and distribution of trust anchors within EGI and the NGIs should be done in a well defined order to ensure consistent deployment and to ensure that the monitoring of the NGIs and sites matches the currently recommended version of the trust anchors.  
The announcement and distribution of trust anchors within EGI and the NGIs should be done in a well defined order to ensure consistent deployment and to ensure that the monitoring of the NGIs and sites matches the currently recommended version of the trust anchors.  


= Transition process =
== Release Schedule ==


For historical reasons, most of the EGI sites (i.e. all those that do not have their own local or national distribution already), use as the meta-package that enshrines the EGI policy on approved CAs one called 'lcg-CA'. In the future, this package will go away, probably at the same time that the distribution repository itself is changed from linuxsoft.cern.ch to the new EGI repositories. Since at that time sites need to change anyway, doing this extra step will hopefully be less intrusive.
EGI Trust Anchor releases are usually done on the '''last Monday of the month''' (except for security or critical bug fixes), but only if such a release would be materially different from the deployed version. EGI will get a preview release  in the previous week for SR.


As of release 1.35, the set of packages distributed via ''both'' the old as well as the new process have not only this legacy RPM, but also the newly named 'ca-policy-egi' RPM. For the time being, both policies are the same, i.e., the same dependencies are included in both RPMs and installing either one of them will trigger the installation of the same set of CAs. After that, the EGI set of endorsed CAs will be encoded in the 'ca-policy-egi' meta-package.
== Trust Anchor Policy and Transition Processes ==


Of course, it is ''not'' guaranteed that, in the future, the EGI and wLCG policies will stay aligned, so sites that relied on the 'lcg-CA' package distributed by EGEE to also comply with the wLCG policies on accepted CAs should keep this in mind. Also, the acceptable CA policy for your organisation, country or region may be different from the EGI one: for example, your organsiation or NGI may have approved additional CAs to support training activities on your infrastructure, or have additional bridges between your countries research federation and your site! As a result, you may want to install additional CAs that are not on the central EGI list.
For historical reasons most EGI sites use the 'lcg-CA' meta-package that reflects EGI as well as wLCG policy on approved CAs. This package is being deprecated: new sites can install the new 'ca-policy-egi-core' package (and ca-policy-lcg if desired). For sites that upgrade, changing the repository URL is enough: 'lcg-CA' will trigger installation of both the 'ca-policy-egi-core' package as well as the 'ca-policy-lcg' package.


= Teams involved =
Today both policies are the same, i.e., the same dependencies are included in both RPMs, and installing either one of them will trigger the installation of the same set of CAs. The EGI specific set of endorsed CAs is encoded in the 'ca-policy-egi-core' meta-package. However, it is ''not'' guaranteed that in the future the EGI and wLCG policies will stay aligned, so sites that relied on the 'lcg-CA' package distributed by EGEE to also comply with the wLCG policies on accepted CAs should keep this in mind. Also, the acceptable CA policy for your organisation, country or region may be different from the EGI one: for example, your organisation or NGI may have approved additional CAs to support training activities on your infrastructure, or have additional CAs for your country or your site! As a result, you may want to install additional CAs that are not on the EGI core list.


* IGTF/EUGridPMA Liaison: David Groep (egi-igtf-liaison@nikhef.nl)
== Teams involved ==
* Monitoring Team (central monitoring configuration centre): CERN/James Casey
 
* Repository Team: GRNET (or CERN for a while?)
* [[IGTF]]/EUGridPMA Liaison: David Groep (egi-igtf-liaison@nikhef.nl)
* EGI-MW team (configuration, integration and staged roll-out): LIP/Mario David
* Repository and SR Team via RT: Kostas Koumantaros, Mario David, Michel Drescher
* Regional follow-up: NGI contacts and All Sites (via CIC portal)
* Monitoring/SAM Team (central monitoring configuration centre): Emir Imamagic <eimamagi@srce.hr>, Konstantin Skaburskas <same-devel@cern.ch>
* NGI Nagios updates: via Monitoring team and SR to NGI operational contacts
* Regional follow-up: NGI contacts and all sites (via CIC portal)
* Security oversight and determination of grace period: EGI CSIRT/Mingchao Ma and Sven Gabriel
* Security oversight and determination of grace period: EGI CSIRT/Mingchao Ma and Sven Gabriel


= Procedure =
= Procedure =


# David Groep (under EGI contract O-E-15/SA1) will also build the entire trust anchor package, currently called 'ca-policy-egi', and make that available on a special site only intended for INTERNAL use by the deployment process (there is also a ca-policy-lcg package). This "special" distribution would contain:
# David Groep (under EGI contract O-E-15/SA1) will build the EGI-specific trust anchor package, currently called 'ca-policy-egi-core' and dependencies, and make that available on a special site only intended for INTERNAL use by the deployment process (there is also a ca-policy-lcg package). This "special" distribution contains:
#* the IGTF "classic", "mics", and "slcs" CAs (following the Policy on Accepted CAs)
#* all CAs accredited under the IGTF "classic", "mics", and "slcs" profiles (following the Policy on Accepted CAs)
#* the "ca-policy-egi-core" as well as the (equivalent legacy) "lcg-CA" and the ca-policy-lcg meta package
#* the "ca-policy-egi-core" as well as the legacy/compatibility packages  "lcg-CA" and its corresponding "ca-policy-lcg" meta package
#* any other EGI specific CAs or exception as decided by EGI
#* any other EGI specific CAs or exception as decided by EGI (currently none)
#* any appropriate meta-data, the readme file and repo headers
#* the patch RPM for the Apache mod_ssl bug (the "dummycas" RPM)
#: This distribution will be unit tested before being released. These RPMs are made available on the dedicated EGI-IGTF liaison web site (not on production sites at that step). To download, you may need to instruct wget to ignore the robots.txt file:
#* the appropriate NRMS XML, meta-data, SAM/Nagios XML (release date set 2 days to the future), README.txt file, and repo headers, validated as per http://admin-repo.egi.eu/XMLvalidator/
#: <tt>&nbsp;wget -e robots=off -r http://obscure-site.example.org/cadist/lcgpreview-X.YY-R/RPMS.lcg/ </tt>
#* This distribution will be unit tested before being released, and the RPMs copied to the internal release web site under a specific URL named after the release revision (to allow quick roll-back for SAM <U11.2 monitoring probes):
#: or even
#: <tt>./builddist-egi-multi.pl --srcurl=http://dist.eugridpma.info/distribution/igtf/current -v -f</tt>
#: <tt>&nbsp;wget -nd -r -np -i index.html -F --base=http://www.cern.ch/groep/cadist/lcgpreview-X.YY-R/RPMS.lcg/ http://www.cern.ch/groep/cadist/lcgpreview-X.YY-R/RPMS.lcg/ </tt>
#* On egi-igtf the symlink 'egi/' is then set to the proper version '''before''' opening the sw-rel ticket.
#* David will upload this distribution to the EGI Repository "inbound" for starting the staged-rollout process
#: The internal EGI-IGTF liaison web site (not the production site) is:
# New CA release is announced by David Groep (egi-igtf-liaison@nikhef.nl) (following on or forwarding the EUGridPMA-Announce list) to
#: <tt>&nbsp;wget -r http://egi-igtf.ndpf.info/distribution/egi/ </tt>
#: or using rsync from <tt>rsync://egi-igtf.ndpf.info/egi-igtf/egi/</tt>
# David will submit a RT ticket to the <tt>sw-rel</tt> queue
#* the RT URL is [https://rt.egi.eu/rt/Ticket/Create.html?Queue=24 https://rt.egi.eu/rt/Ticket/Create.html?Queue=24].
#* including the release.xml NRMS that gets produced as part of the repository at <tt>&nbsp;<nowiki>http://egi-igtf.ndpf.info/distribution/egi/current/meta/ca-policy-egi-core-</nowiki><i>VERSION</i>-<i>RELEASE</i>.nrms</tt> (also called just <tt>release.xml</tt>).
#* ticket subject will be standard: "CA update, version X.Y.Z-R", with a comment inside saying: "please, follow the EGI-IGTF release process at [[EGI_IGTF_Release_Process]]".
#* The RT ticket that triggers the updates (which can be sent anytime), should systematically include a reminder not to start after mid-week, and '''preferably on a Monday'''.
#* the EGI specific change log in the release file. This change log is intended for direct distribution to the EGI sites
#* In RT, the monitoring team should be involved via a CC to '''eimamagi@srce.hr''', and the security officers via '''sveng@nikhef.nl'''.
#: this triggers the import of distribution to the EGI Repository "unverified" repository for starting the staged-rollout process via the RT link as explained in the [[NSRW New Software Release Workflow]]
#:To ensure a smooth, parallel update of the repository and the monitoring/Nagios tests, the non-urgent updates should be started before Wednesdays noon.
# New ticket (with ticket ID) is announced by David Groep (egi-igtf-liaison@nikhef.nl) (following on or forwarding the EUGridPMA-Announce list) to
#* the EGI CSIRT via egi-csirt-team@mailman.egi.eu
#* the EGI CSIRT via egi-csirt-team@mailman.egi.eu
#* the EGI MW unit via david@lip.pt, jorge@lip.pt ('''or later sw-rollout-managment@mailman.egi.eu''')
#* the EGI MW unit via jpina@lip.pt, jorge@lip.pt ('''or later sw-rollout-management@mailman.egi.eu''')
#* the monitoring teams to update the SAM CE probes via project-eu-egee-middleware-iteam@cern.ch (Maria.Alandes.Pradillo@cern.ch, Konstantin.Skaburskas@cern.ch)
#* the monitoring teams to update the SAM CE probes via project-eu-egee-middleware-iteam@cern.ch, eimamagi@srce.hr
#* the NGI Operations managers (to update the Nagios instances) via noc-managers@mailman.egi.eu
#* ''Mail paste list: <tt>egi-csirt-team@mailman.egi.eu, jpina@lip.pt, jorge@lip.pt, inspire-sa2@mailman.egi.eu, project-eu-egee-middleware-iteam@cern.ch, eimamagi@srce.hr, noc-managers@mailman.egi.eu, sveng@nikhef.nl, egi-igtf-liaison@nikhef.nl, dennisvd@nikhef.nl</tt>''
#* ''Mail paste list: <tt>egi-csirt-team@mailman.egi.eu, david@lip.pt, jorge@lip.pt, project-eu-egee-middleware-iteam@cern.ch, Maria.Alandes.Pradillo@cern.ch, Konstantin.Skaburskas@cern.ch, noc-managers@mailman.egi.eu, mingchao.ma@stfc.ac.uk, sveng@nikhef.nl, egi-igtf-liaison@nikhef.nl</tt>''
#* Either the EGI CSIRT, the EGI Operational Security Coordinators, or the MW unit can declare this update as urgent.
#* Either the EGI CSIRT, the EGI Operational Security Coordinators, or the MW unit can declare this update as urgent.
# David will create a GGUS ticket, with with a standard subject: "CA update, version X.Y.Z-R" And with a comment inside saying: "please, assign this ticket to the EGI-MW team". The integration team will also be involved in the ticket to start preparing the repository ("Involve others:" in GGUS), as both changes are independent. The ticket will contain
# The RT ticket will trigger the import into unverified, after which the initial acceptance process will check compliance with the apckage requirements and upload the report.  
#* the URL, e.g.:
#* The Initial QA should be done within a few hours.  
#** http://www.cern.ch/groep/cadist/lcgpreview-X.Y-Z/  
#* This will bring the package to ".../sw/stagerollout/"
#* the EGI specific change log in the body of the ticket. This change log is intended for direct distribution to the EGI sites
# At the transition to .../sw/stagerollout/
#:To ensure a smooth, parallel update of the repository and the monitoring/Nagios tests, the non-urgent updates should be be started prior to Wednesdays at mid-day. The GGUS ticket that triggers the updates (which can be sent anytime), should systematically include a reminder not to start after mid-week, and preferably on a Monday.
#* SR quickly verifies if the package works in an at-most-one-day process, but does not close the ticket. The SR team now ask the monitoring team (Emir) whether there are any pre-U11.2 SAM/Nagios instances still in production. If so, the RT ticket gets assigned to the Monitoring team if SR is successful!
# The EGI MW unit will put the release in staged roll-out for testing. This procedure should not take more than one day.
# '''Now the process WAITS for the official IGTF release, which will be announced through the announce@eugridpma mailing list'''. The new EGI trust anchor release is not to be progressed to production until the IGTF announcement is out (please!)<br/><br/><br/><br/><br/><br/><br/>''and you wait a bit more, and then ...''<br/><br/>
#* The sites that participate in the staged roll-out are: LIP
# ''Only for releases with SAM Nagios < U11.2'': monitoring team updates the old-style WN probres (CE-sft-caver) as described below, based on the data in the SR repository, to update the legacy CE tests if those are still in production use, as both changes are independent. In case the old probes are to be supported, the following steps should be done in quick succession, an fast-update to Nagios prepared '''and rolled out a few hours before the CA announcement''' (new-style probes use dynamic data, from the submission repo for <U11.1, and from production repo for >=U11.2, and do not need to be updated):
# If staged roll-out is successful:
#* updates the ca_dist.dat file using the new CA RPM list (see below!)
#* the EGI-MW unit assigned the GGUS ticket to the Monitoring team, with a CC to the Repository, since the next two steps should be done in rapid succession. The monitoring team should act first (due to the structure of the CAdist-probe logic:
#* updates the ca_dist.conf file with the ''absolute calendar update timings used in Nagios'' (see below as well), in accordance with the EGI-CSIRT or liaison recommendation (8 days for regular, or 1 day for urgent)
# The Monitoring team copies the old-style YUM headers/header.info file from the secret location to
#* builds and releases the updated org.sam probes via a very-quick SW process in parallel to the update. This will be the new sam release
#*: <tt>&nbsp;http://linuxsoft.cern.ch/LCG-CAs/current/headers/header.info</tt>
#* monitoring team informs the NGI Operations managers to update the Nagios instances via noc-managers@mailman.egi.eu
#*: or has it re-created by hand. This header.info file is read by the Nagios <tt>CAdist-probe</tt> script to find the current list of required CAs.
# The SR team can now progress to release:
# The Repository team copies the RPMs form the secret place to the repository and either
#* check the date. If the date in the SAM/Nagios "release.xml" file (<Date> entry) is already passed, ask Kostas to update this file in the repo on final release. Otherwise, just continue...
#* copies all of the secret directory to the release location. This structure supports new-style Yum3 and old-style Yum2 downloads; or
#* moves release from staged roll-out '''to production''' (so not to UMD), triggering over-write (non-incremental) of the .../sw/production/cas/1/ directory.
#* copies the RPMs into the repository and re-creates the headers locally
#* ''verifyies'' that the update was non-incremental and that the whole contents of the ".../production/cas/1/" directory has indeed been replaced at <tt>&nbsp;http://repository.egi.eu/sw/production/cas/1/</tt>. If the repository has not properly updated itself, contact the repo team (Kostas Koumantatos at <kkoum@GRNET.GR>) to have it fixed: the URL <tt>http://repository.egi.eu/sw/production/cas/1/current/</tt> MUST point to the new release!
#* updates the CA related web page at
# Annoucements to be sent:
#*: <tt>&nbsp;http://grid-deployment.web.cern.ch/grid-deployment/lcg2CAlist.html</tt>
#* the IGTF liaison (DavidG) updates the [[EGI_IGTF_Release]] wiki page with installation information to list the new version number.
#* sends an announcement with changelog (from the GGUS ticket) to the NGI contacts that the repository contains new content through the Operations Portal (select "To ROC Managers", "To Production Site Admin"), with a CC to the gLite EMT. Template emails including email subjects can be found here. The change log to be included in the mail is part of the GGUS ticket, and can also be found at http://www.cern.ch/groep/cadist/lcgpreview-X.Y-Z/ in the file lcg-ca-X.Y-Z.txt.  
#* The SR team sends the announcement with changelog (from the RT ticket) to the NGI contacts and the sites through the Operations Portal (select "To ROC Managers", "To Production Site Admin","Operation tools"), with a CC to the gLite EMT. The change log to be included in the mail is part of the RT ticket NSRW XML and can also be found at <tt>http://repository.egi.eu/sw/production/cas/1/current/meta/</tt> as file ca-policy-egi-core-readme-X.Y.txt(with X.Y the version number).
#* assigns the GGUS ticket to the EGI-CSIRT
# In case the update was marked ''critical'', the EGI-CSIRT verifies that the repository links and release notes of the CA related web pages ([http://repository.egi.eu/sw/production/cas/1/current/] and [[EGI_IGTF_Release]]) have been updated '''and''' that the relevant broadcast of step 8 is achieved by looking at <tt>https://cic.egi.eu/index.php?section=vo&page=broadcast_archive</tt> (limit the dates to the last few days, and fill "Criterion 3" with "CA"). If a critical update was not released in time, it will ''(i)'' warn the technical and operational coordinators of EGI thereof via <tt>michel.drescher@egi.eu, tiziana.ferrari@egi.eu</tt>), and ''(ii)'' take appropriate action to ensure (as always) the security of the EGI infrastructure.
# The ticket opened by David Groep at step 3 is closed by EGI-CSIRT Contact, only after verifying that the following three links of the CA related web page
#* <tt>&nbsp;http://grid-deployment.web.cern.ch/grid-deployment/lcg2CAlist.html</tt> (to be moved later), with the link for Quattor templates at the bottom of the page.
#* <tt>&nbsp;http://linuxsoft.cern.ch/LCG-CAs/current</tt> (to be moved later)
#* <tt>&nbsp;http://glitesoft.cern.ch/LCG-CAs/current/RPMS.production/</tt> (gLite EMT should take care of this one)
#: of step 7 are updated containing reference to the new CA version:
#: '''and''' that the relevant broadcast of step 8 is achieved by looking at <tt>https://cic.gridops.org/index.php?section=vo&page=broadcast_archive</tt> (limit the dates to the last few days, and fill "Criterion 3" with "CA"). GGUS ticket subject should be "CA update, version X.Y.Z-R".


= Notes on the CAdist probe =
= Notes on the SAM tests =
 
* the list of required packages is based on parsing the old-style Yum header.info file. Once yum-arch has been completely replaced, this file should be created by hand and contain at least this one line:
*: <tt>&nbsp;0:ca_policy_igtf-classic-([\d.]+)-.*</tt>
*: where [\d.]+ contains a version number like "1.35"
* the release date of the EGI distribution is taked from the Last-Modified header sent by the web server hosting the header.info file
* The latest IGTF version and release date are taken from the CHANGES file at <tt>http://dist.eugridpma.info/distribution/igtf/current/CHANGES</tt>, which the utility expects to be in a specific format (see sources)
* the grace period is always 7 days -- there is no means to enforce critical updates from the 'outside' of a site


= Notes on the SAM tests =
* SAM tests need to be updated, specifically the "lcg-sam-client-sensors" and "grid-monitoring-probes-org.sam" and these need to be installed in production:


* SAM tests need to be updated, specifically the "lcg-sam-client-sensors" and "grid-monitoring-probes-org.sam" and these need to be installed in production
Hi Emir,
* Only them, upload the new CA RPMs to the gLite middleware repository
I've found back the instructions for generating those magic Python
dictionaries for the worker-node CA probes.
You can do it in three steps:
- download the CE-sft-caver probe:
    wget http://svnweb.cern.ch/guest/sam/trunk/probes/src/wnjob/org.sam/probes/org.sam/sam/CE-sft-caver
- download the to-be-latest RPMs in a separate directory:
    mkdir input && cd input && \
    wget -q -nH -nd -c -r -l 1 \
      http://repository.egi.eu/sw/stagerollout/cas/1/1.XX-R/current/RPMS/
  or if you want to use the production one
    wget -q -nH -nd -c -r -l 1 \
      http://repository.egi.eu/sw/production/cas/1/current/RPMS/
- REMOVE the 'dummyca' RPM:
    rm dummy-ca-certs-20090630-1.noarch.rpm
- move back up (keeps things clean)
    cd ..
- generate the dictionaries
    ./CE-sft-caver -a input -T
  (or use the "-u" option for an urgent update of 1 day)
- do something useful with the generated files
- update the RT ticket and allow it to be closed (thus installing
  the stagerollout/ version into production/)
However, there is a fundamental problem with the probe: it uses OpenSSL
to calculate the hashes, so the generated dictionaries work *either*
with OpenSSL 0.x, OR with OpenSSL1, but NOT with both. That is a
limitation of the probe itself.
So, generate the ca_data.dat file on a machine that matches the target
of the CE probes!
Anyway, the old-style probe has to go away, because it deals with
'removed' CAs in the wrong way. It will start complaining even if the
CA is still technically OK ...
Long live the new probe!

Revision as of 08:26, 22 June 2015

This page is in draft

About this distribution

This page describe the procedure for the announcement and propagation of a new release of the EGI Trust Anchor distribution. The EGI Policy on Approved Certification Authorities describes the set of trust anchors accepted by EGI and put forward for consideration by the NGIs to install as the 'agreed set' of Identity Management trust anchors. For the time being, only PKI trust achors ('Certification Authorities') are included in this release.

The announcement and distribution of trust anchors within EGI and the NGIs should be done in a well defined order to ensure consistent deployment and to ensure that the monitoring of the NGIs and sites matches the currently recommended version of the trust anchors.

Release Schedule

EGI Trust Anchor releases are usually done on the last Monday of the month (except for security or critical bug fixes), but only if such a release would be materially different from the deployed version. EGI will get a preview release in the previous week for SR.

Trust Anchor Policy and Transition Processes

For historical reasons most EGI sites use the 'lcg-CA' meta-package that reflects EGI as well as wLCG policy on approved CAs. This package is being deprecated: new sites can install the new 'ca-policy-egi-core' package (and ca-policy-lcg if desired). For sites that upgrade, changing the repository URL is enough: 'lcg-CA' will trigger installation of both the 'ca-policy-egi-core' package as well as the 'ca-policy-lcg' package.

Today both policies are the same, i.e., the same dependencies are included in both RPMs, and installing either one of them will trigger the installation of the same set of CAs. The EGI specific set of endorsed CAs is encoded in the 'ca-policy-egi-core' meta-package. However, it is not guaranteed that in the future the EGI and wLCG policies will stay aligned, so sites that relied on the 'lcg-CA' package distributed by EGEE to also comply with the wLCG policies on accepted CAs should keep this in mind. Also, the acceptable CA policy for your organisation, country or region may be different from the EGI one: for example, your organisation or NGI may have approved additional CAs to support training activities on your infrastructure, or have additional CAs for your country or your site! As a result, you may want to install additional CAs that are not on the EGI core list.

Teams involved

  • IGTF/EUGridPMA Liaison: David Groep (egi-igtf-liaison@nikhef.nl)
  • Repository and SR Team via RT: Kostas Koumantaros, Mario David, Michel Drescher
  • Monitoring/SAM Team (central monitoring configuration centre): Emir Imamagic <eimamagi@srce.hr>, Konstantin Skaburskas <same-devel@cern.ch>
  • NGI Nagios updates: via Monitoring team and SR to NGI operational contacts
  • Regional follow-up: NGI contacts and all sites (via CIC portal)
  • Security oversight and determination of grace period: EGI CSIRT/Mingchao Ma and Sven Gabriel

Procedure

  1. David Groep (under EGI contract O-E-15/SA1) will build the EGI-specific trust anchor package, currently called 'ca-policy-egi-core' and dependencies, and make that available on a special site only intended for INTERNAL use by the deployment process (there is also a ca-policy-lcg package). This "special" distribution contains:
    • all CAs accredited under the IGTF "classic", "mics", and "slcs" profiles (following the Policy on Accepted CAs)
    • the "ca-policy-egi-core" as well as the legacy/compatibility packages "lcg-CA" and its corresponding "ca-policy-lcg" meta package
    • any other EGI specific CAs or exception as decided by EGI (currently none)
    • the patch RPM for the Apache mod_ssl bug (the "dummycas" RPM)
    • the appropriate NRMS XML, meta-data, SAM/Nagios XML (release date set 2 days to the future), README.txt file, and repo headers, validated as per http://admin-repo.egi.eu/XMLvalidator/
    • This distribution will be unit tested before being released, and the RPMs copied to the internal release web site under a specific URL named after the release revision (to allow quick roll-back for SAM <U11.2 monitoring probes):
    ./builddist-egi-multi.pl --srcurl=http://dist.eugridpma.info/distribution/igtf/current -v -f
    • On egi-igtf the symlink 'egi/' is then set to the proper version before opening the sw-rel ticket.
    The internal EGI-IGTF liaison web site (not the production site) is:
     wget -r http://egi-igtf.ndpf.info/distribution/egi/
    or using rsync from rsync://egi-igtf.ndpf.info/egi-igtf/egi/
  2. David will submit a RT ticket to the sw-rel queue
    • the RT URL is https://rt.egi.eu/rt/Ticket/Create.html?Queue=24.
    • including the release.xml NRMS that gets produced as part of the repository at  http://egi-igtf.ndpf.info/distribution/egi/current/meta/ca-policy-egi-core-VERSION-RELEASE.nrms (also called just release.xml).
    • ticket subject will be standard: "CA update, version X.Y.Z-R", with a comment inside saying: "please, follow the EGI-IGTF release process at EGI_IGTF_Release_Process".
    • The RT ticket that triggers the updates (which can be sent anytime), should systematically include a reminder not to start after mid-week, and preferably on a Monday.
    • the EGI specific change log in the release file. This change log is intended for direct distribution to the EGI sites
    • In RT, the monitoring team should be involved via a CC to eimamagi@srce.hr, and the security officers via sveng@nikhef.nl.
    this triggers the import of distribution to the EGI Repository "unverified" repository for starting the staged-rollout process via the RT link as explained in the NSRW New Software Release Workflow
    To ensure a smooth, parallel update of the repository and the monitoring/Nagios tests, the non-urgent updates should be started before Wednesdays noon.
  3. New ticket (with ticket ID) is announced by David Groep (egi-igtf-liaison@nikhef.nl) (following on or forwarding the EUGridPMA-Announce list) to
    • the EGI CSIRT via egi-csirt-team@mailman.egi.eu
    • the EGI MW unit via jpina@lip.pt, jorge@lip.pt (or later sw-rollout-management@mailman.egi.eu)
    • the monitoring teams to update the SAM CE probes via project-eu-egee-middleware-iteam@cern.ch, eimamagi@srce.hr
    • Mail paste list: egi-csirt-team@mailman.egi.eu, jpina@lip.pt, jorge@lip.pt, inspire-sa2@mailman.egi.eu, project-eu-egee-middleware-iteam@cern.ch, eimamagi@srce.hr, noc-managers@mailman.egi.eu, sveng@nikhef.nl, egi-igtf-liaison@nikhef.nl, dennisvd@nikhef.nl
    • Either the EGI CSIRT, the EGI Operational Security Coordinators, or the MW unit can declare this update as urgent.
  4. The RT ticket will trigger the import into unverified, after which the initial acceptance process will check compliance with the apckage requirements and upload the report.
    • The Initial QA should be done within a few hours.
    • This will bring the package to ".../sw/stagerollout/"
  5. At the transition to .../sw/stagerollout/
    • SR quickly verifies if the package works in an at-most-one-day process, but does not close the ticket. The SR team now ask the monitoring team (Emir) whether there are any pre-U11.2 SAM/Nagios instances still in production. If so, the RT ticket gets assigned to the Monitoring team if SR is successful!
  6. Now the process WAITS for the official IGTF release, which will be announced through the announce@eugridpma mailing list. The new EGI trust anchor release is not to be progressed to production until the IGTF announcement is out (please!)






    and you wait a bit more, and then ...

  7. Only for releases with SAM Nagios < U11.2: monitoring team updates the old-style WN probres (CE-sft-caver) as described below, based on the data in the SR repository, to update the legacy CE tests if those are still in production use, as both changes are independent. In case the old probes are to be supported, the following steps should be done in quick succession, an fast-update to Nagios prepared and rolled out a few hours before the CA announcement (new-style probes use dynamic data, from the submission repo for <U11.1, and from production repo for >=U11.2, and do not need to be updated):
    • updates the ca_dist.dat file using the new CA RPM list (see below!)
    • updates the ca_dist.conf file with the absolute calendar update timings used in Nagios (see below as well), in accordance with the EGI-CSIRT or liaison recommendation (8 days for regular, or 1 day for urgent)
    • builds and releases the updated org.sam probes via a very-quick SW process in parallel to the update. This will be the new sam release
    • monitoring team informs the NGI Operations managers to update the Nagios instances via noc-managers@mailman.egi.eu
  8. The SR team can now progress to release:
    • check the date. If the date in the SAM/Nagios "release.xml" file (<Date> entry) is already passed, ask Kostas to update this file in the repo on final release. Otherwise, just continue...
    • moves release from staged roll-out to production (so not to UMD), triggering over-write (non-incremental) of the .../sw/production/cas/1/ directory.
    • verifyies that the update was non-incremental and that the whole contents of the ".../production/cas/1/" directory has indeed been replaced at  http://repository.egi.eu/sw/production/cas/1/. If the repository has not properly updated itself, contact the repo team (Kostas Koumantatos at <kkoum@GRNET.GR>) to have it fixed: the URL http://repository.egi.eu/sw/production/cas/1/current/ MUST point to the new release!
  9. Annoucements to be sent:
    • the IGTF liaison (DavidG) updates the EGI_IGTF_Release wiki page with installation information to list the new version number.
    • The SR team sends the announcement with changelog (from the RT ticket) to the NGI contacts and the sites through the Operations Portal (select "To ROC Managers", "To Production Site Admin","Operation tools"), with a CC to the gLite EMT. The change log to be included in the mail is part of the RT ticket NSRW XML and can also be found at http://repository.egi.eu/sw/production/cas/1/current/meta/ as file ca-policy-egi-core-readme-X.Y.txt(with X.Y the version number).
  10. In case the update was marked critical, the EGI-CSIRT verifies that the repository links and release notes of the CA related web pages ([1] and EGI_IGTF_Release) have been updated and that the relevant broadcast of step 8 is achieved by looking at https://cic.egi.eu/index.php?section=vo&page=broadcast_archive (limit the dates to the last few days, and fill "Criterion 3" with "CA"). If a critical update was not released in time, it will (i) warn the technical and operational coordinators of EGI thereof via michel.drescher@egi.eu, tiziana.ferrari@egi.eu), and (ii) take appropriate action to ensure (as always) the security of the EGI infrastructure.

Notes on the SAM tests

  • SAM tests need to be updated, specifically the "lcg-sam-client-sensors" and "grid-monitoring-probes-org.sam" and these need to be installed in production:
Hi Emir,

I've found back the instructions for generating those magic Python
dictionaries for the worker-node CA probes.

You can do it in three steps:

- download the CE-sft-caver probe:
   wget http://svnweb.cern.ch/guest/sam/trunk/probes/src/wnjob/org.sam/probes/org.sam/sam/CE-sft-caver 

- download the to-be-latest RPMs in a separate directory:
    mkdir input && cd input && \
    wget -q -nH -nd -c -r -l 1 \
      http://repository.egi.eu/sw/stagerollout/cas/1/1.XX-R/current/RPMS/

  or if you want to use the production one
    wget -q -nH -nd -c -r -l 1 \
      http://repository.egi.eu/sw/production/cas/1/current/RPMS/

- REMOVE the 'dummyca' RPM:
    rm dummy-ca-certs-20090630-1.noarch.rpm

- move back up (keeps things clean)
    cd ..

- generate the dictionaries
    ./CE-sft-caver -a input -T
  (or use the "-u" option for an urgent update of 1 day)

- do something useful with the generated files

- update the RT ticket and allow it to be closed (thus installing
 the stagerollout/ version into production/)

However, there is a fundamental problem with the probe: it uses OpenSSL
to calculate the hashes, so the generated dictionaries work *either*
with OpenSSL 0.x, OR with OpenSSL1, but NOT with both. That is a
limitation of the probe itself.
So, generate the ca_data.dat file on a machine that matches the target
of the CE probes!

Anyway, the old-style probe has to go away, because it deals with
'removed' CAs in the wrong way. It will start complaining even if the
CA is still technically OK ...
Long live the new probe!