Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:WP5 Project Metrics"

From EGIWiki
Jump to navigation Jump to search
Line 27: Line 27:
| align="center" | 6  
| align="center" | 6  
| align="center" style="border-right: 1px dotted black;" | 17  
| align="center" style="border-right: 1px dotted black;" | 17  
| align="center" | 70% (18)<br>
| align="center" | 70% (18)<br>  
| align="center" | <br>
| align="center" | <br>
|-
|-
Line 67: Line 67:
|-
|-
| M.SA2-7  
| M.SA2-7  
| Number of new releases contributed into the Software Repository from all types of software providers  
| Number of new product updates contributed into the Software Repository from all types of software providers  
| style="border-right: 1px solid black;" | TSA2.4  
| style="border-right: 1px solid black;" | TSA2.4  
| align="center" | 0  
| align="center" | 0  

Revision as of 15:26, 9 May 2011

EGI SA2 Metrics

Metric ID Metric Task Q1 Q2 Q3 Q41 Q5
M.SA2-1 Number of software components recorded in the UMD Roadmap TSA2.1 0 0 30 30

M.SA2-2 Number of UMD Roadmap Capabilities defined through validation criteria TSA2.2 0 6 17 70% (18)

M.SA2-3 Number of software incidents investigated in a post-mortem found in production that result in changes to quality criteria2 TSA2.2 0 1 0 0
M.SA2-4 Number of new product releases validated against defined criteria TSA2.3 0 1 1 3

M.SA2-5 Mean time taken to validate a product release TSA2.3 n/a 4h 8h 4h

M.SA2-6 Number of releases failing validation TSA2.3 n/a 0 0 0

M.SA2-7 Number of new product updates contributed into the Software Repository from all types of software providers TSA2.4 0 1 3 4

M.SA2-8 Number of unique visitors to the Software Repository TSA2.4 0 507 412 525

M.SA2-9 Number of unique visits to the Repository backend TSA2.4 0 0 0 1663

M.SA2-10 Number of tickets assigned to DMSU TSA2.5 0 8 144

M.SA2-11 Mean time to resolve DMSU tickets3 TSA2.5 3d 2d n/a n/a

1 Beginning with PQ4 the semantics of some metrics have changed. The exact details can be found in D5.3

2 This metric was narrowed down in scope beginning with collection for PQ4.

3 beginning with PQ4 this metric is not collected until appropriate reporting means in GGUS are implemented. (See D5.3 for more details.)