Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:UK-QR6

From EGIWiki
Revision as of 17:54, 22 January 2015 by Krakow (talk | contribs) (moved UK-QR6 to EGI-InSPIRE:UK-QR6)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR6 NGI_UK STFC Claire Devereux


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
19/9/11 Lyon EGI CSIRT Face to Face CSIRT Team https://www.egi.eu/indico/conferenceDisplay.py?confId=611
22/9/11 Lyon Security Training - see EGI TF Indico pages

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
20/9/11 Lyon OTAG 2 http://indico.cern.ch/conferenceDisplay.py?confId=121319
19/9/11 Lyon OMB 2 http://indico.cern.ch/conferenceDisplay.py?confId=121319
20/9/11 Lyon Globus Integration Workshop 2 -
20/9/11 Lyon Unicore Integration Workshop 1 -
17-19/10/11 Padova, Italy EMI All Hands Meeting 2 http://www.eu-emi.eu/
14/9/11 CERN WLCG GDB 1 -
12/10/11 CERN WLCG GDB 2 -
15-16/9/11 CERN GridPP 27 Conference 6 http://www.gridpp.ac.uk/gridpp27/
19-22/9/11 Lyon EGI Technical Forum 14 http://indico.cern.ch/conferenceDisplay.py?confId=121319
fortnightly CERN HEPIX IPv6 1 -
26-27/9/11 SARA LHC ONE 1 http://indico.cern.ch/conferenceOtherViews.py?view=standard&confId=149042
28/8/11 Edinburgh Turing Festival 1 http://www.turingfestival.com/


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

During the past quarter we have been completing the process of creating the NGI_UK. This has just been fininshed and the creation NGI_UK broadcast has been sent.

2.2. Main Achievements

IPv6 Test Cluster deployment at Glasgow for distributed test bed, underway. LHCONE investigation for the UK @ Glasgow EMI DPM at Durham installed and functional Installed CVMFS and debugged few outstanding problems @ Manchester and an upgrade

UKI ROC -> NGI transition, Glasgow running the preliminary testbed and then full migration. Examining job failure profile with an intent to reduce operational manpower requirements in the long term

A number of deployment problems with EGI services and more general infrastructure such as network problems have been debugged in Manchester. The sets of procedures from the debugging and commands used have been described for the benefit of other sites in the northgrid blog

http://northgrid-tech.blogspot.com/

The CVMFS/upgrade work at Manchester is described in 2 blogs and wiki page

https://www.gridpp.ac.uk/wiki/UK_CVMFS_Deployment

Manchester has started an active collaboration with the DPM developers to test some solutions much in advance to help them get through the process more quickly. it is thought that the help of an experienced system administrator will increase the chances of getting things in the releases.

Manchester is also part of the stage rollout process for the site-BDII and top-BDII. This task is just starting.

2.3. Issues and mitigation

Issue Description Mitigation Description
Heavy deployment problems with the DPM head node reliability Started a collaboration with developers directly
Durham staffing problem + technical problems helped get site back online remotely
RAL T1 publishing incorrect resource metrics revised publishing in testing, should be fixed shortly