Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:UK-QR10

From EGIWiki
Revision as of 17:56, 2 November 2012 by Gordon (talk | contribs)
Jump to navigation Jump to search


Quarterly Report Number NGI Name Partner Name Author
QR 10 NGI_UK STFC Denise Small and Claire Devereux


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
12/9/12 Oxford, UK Sustainability of Core UK e-Infrastructure 26 The workshop contained presentations on the Cores Services for UK e-Infrastructure and a discussion session surrounding business models for their sustainability. Demos of some tools including the Training Marketplace were also held. http://digital-research.oerc.ox.ac.uk/programme/sustain
8-12/8/2012 Abingdon Using e-Infrastructures for Research 29 Summer School: http://www.ngs.ac.uk/communities/using-e-infrastructures-for-research-summer-school-2012

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
29-30/8/2012 Panama City TAGPMA Meeting 1 Representing interests of EGI and WLCG: http://indico.rnp.br/conferencedisplay.py?confId=142
4-6/9/2012 Karlsruhe Operational Tools Sustainability 2 http://www.ogf.org/OGF36/
6-7/9/2012 Utrecht TERENA VAMP Meeting 1 2 presentations on FIM4R activity
10-12/9/2012 Lyon EUGridPMA Meeting 1 http://www.eugridpma.org
17-21/9/2012 Prague EGI Technical Forum 9 Multiple workshops and presentations, including accounting, GOCDB, GLUE2, Info Discovery,.. http://tf2012.egi.eu
17-18/10/2012 CERN Atlas Software and Computing Workshop 2
26-27/9/2012 Oxford GridPP 9 GridPP Collaboration http://www.gridpp.ac.uk/gridpp29/
14-18/10/2012 Shonan, Japan 1 Grid and Cloud Security http://www.nii.ac.jp/shonan/


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

The UK NGI has moved NGI_IE VOs into its VOMS framework in preparation for the withdrawal of NGI_IE from EGI InSPIRE at the end of 2012. The VOMS servers and their operation has moved from the Manchester Research Computing group to the Manchester Physics team, although its staffing remains the same. THE UK is hosting the EGI Community Forum 2013 and is busy making preparations for a successful meeting, including getting co-located meetings and workshops signed up.

2.2. Main Achievements

Glasgow - Further development of the IPv6 test cluster. Integration of test cluster into production test environment. Co-ordinated gLite 3.1 service updating. Also update the WMS setup, increasing VO support and additional hardware to handle higher loads. Worker node migration is the next big step to take. Some sites have moved and we are examining the outcomes, so that the NGI makes a phased transition. NA62 VO reached commenced production campaigns, which is a noteworthy milestone.

Imperial College - We have been busy getting rid of all our Glite nodes, including the CE's, APEL host and the two top-BDII's and repacing them with EMI versions. We have submitted two EMI-1 CREAM CE, two EMI-2 CREAM CE and one EMI WMS staged-rollout reports. We have been contributing to the ROD rota. We have continued to maintain and develop the 'state of the nation' web-pages (http://www.hep.ph.ic.ac.uk/~dbauer/grid/state_of_the_nation.html) tracking the roll out of EMI services in the UK.

University of Manchester - Robert Frank joined the group at the start of September from the University of Manchester NGS team, and has been updating the GridPP/NGS VOMS system as it transitions to being a GridPP responsibility again. He has co-ordinated this with VOMS backup installations being set up at other GridPP sites (Oxford and Imperial).

Manchester is a member of the WLCG middleware deployment and perfsonar deployment coordination task forces. After installing the perfsonar machines at this site help was given to other 3 sites installing theirs. Helped debug UK connections with FZK. Manchester staff are coordinating the transition of sites to EMI-2 on the atlas side coordinating with GridPP operations.

2.3. Issues and mitigation

Issue Description Mitigation Description
T2 Scotgrid Power/cooling Problems Specific issues to be dealt with at affected sites -
T2 London Glexel tarball EMI WN awaiting a tarball -
T2 London Problem interacting with dcache SE to be worked on -