Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:UK-QR10"

From EGIWiki
Jump to navigation Jump to search
Line 101: Line 101:
Co-ordinated gLite 3.1 service updating.  Also update the WMS setup, increasing VO support and additional hardware to handle higher loads.  Worker node migration is the next big step to take.  Some sites have moved and we are examining the outcomes, so that the NGI makes a phased transition.
Co-ordinated gLite 3.1 service updating.  Also update the WMS setup, increasing VO support and additional hardware to handle higher loads.  Worker node migration is the next big step to take.  Some sites have moved and we are examining the outcomes, so that the NGI makes a phased transition.
NA62 VO reached commenced production campaigns, which is a noteworthy milestone.
NA62 VO reached commenced production campaigns, which is a noteworthy milestone.
Imperial College
We have been busy getting rid of all our Glite nodes, including the CE's, APEL host and the two top-BDII's and repacing them with EMI versions.  We have submitted two EMI-1 CREAM CE, two EMI-2 CREAM CE  and one EMI WMS staged-rollout reports. We have been contributing to the ROD rota. We have continued to maintain and develop the 'state of the nation' web-pages (http://www.hep.ph.ic.ac.uk/~dbauer/grid/state_of_the_nation.html) tracking the roll out of EMI services in the UK.


===2.3. Issues and mitigation===
===2.3. Issues and mitigation===

Revision as of 15:08, 2 November 2012


Quarterly Report Number NGI Name Partner Name Author


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
8-12/8/2012 Abingdon Using e-Infrastructures for Research 2 Summer School http://digital-research.oerc.ox.ac.uk/ -
29-30/8/2012 Panama City TAGPMA Meeting 1 Representing interests of EGI and WLCG
4-6/9/2012 Karlsruhe Operational Tools Sustainability 2 http://www.ogf.org/OGF36/ -
6-7/9/2012 Utrecht TERENA VAMP Meeting 1 2 presentations on FIM4R activity -
10-12/9/2012 Lyon EUGridPMA Meeting 1 http://www.eugridpma.org -
10-12/9/2012 Oxford Digital Research 2012 1 1st meeting of the e-infrastructure User Forum -
17-21/9/2012 Prague EGI Technical Forum 8 GOCDB GLUE2 Info Discovery... http://tf2012.egi.eu -
17-18/10/2012 CERN Atlas Software and Computing Workshop 1
26-27/9/2012 Oxford GridPP 6 GridPP Collaboration http://www.gridpp.ac.uk/gridpp29/ -
14-18/10/2012 Shonan, Japan 1 Grid and Cloud Security http://www.nii.ac.jp/shonan/ -
30/10/2012 Swindon EPSRC Workshop on training provision 1 Training Marketplace, talked to academic providers about the Training Market Place -


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

2.2. Main Achievements

Glasgow Further development of the IPv6 test cluster. Integration of test cluster into production test environment. Co-ordinated gLite 3.1 service updating. Also update the WMS setup, increasing VO support and additional hardware to handle higher loads. Worker node migration is the next big step to take. Some sites have moved and we are examining the outcomes, so that the NGI makes a phased transition. NA62 VO reached commenced production campaigns, which is a noteworthy milestone.

Imperial College We have been busy getting rid of all our Glite nodes, including the CE's, APEL host and the two top-BDII's and repacing them with EMI versions. We have submitted two EMI-1 CREAM CE, two EMI-2 CREAM CE and one EMI WMS staged-rollout reports. We have been contributing to the ROD rota. We have continued to maintain and develop the 'state of the nation' web-pages (http://www.hep.ph.ic.ac.uk/~dbauer/grid/state_of_the_nation.html) tracking the roll out of EMI services in the UK.

2.3. Issues and mitigation

Issue Description Mitigation Description
Power/cooling Problems Specific issues to be dealt with at affected sites -
Glexel tarball EMI WN awaiting a tarball -
Problem interacting with dcache SE to be worked on -