EGI-InSPIRE:Turkey-QR9
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
EGI Inspire Main page |
Inspire reports menu: | Home • | SA1 weekly Reports • | SA1 Task QR Reports • | NGI QR Reports • | NGI QR User support Reports |
Quarterly Report Number | NGI Name | Partner Name | Author |
---|---|---|---|
QR9 | NGI_TR | TUBITAK ULAKBIM | Feyza Eryol |
1. MEETINGS AND DISSEMINATION
1.1. CONFERENCES/WORKSHOPS ORGANISED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED
Date | Location | Title | Participants | Outcome (Short report & Indico URL) |
---|---|---|---|---|
1.3. PUBLICATIONS
Publication title | Journal / Proceedings title | Journal references Volume number Issue Pages from - to |
Authors 1. 2. 3. Et al? |
---|
2. ACTIVITY REPORT
2.1. Progress Summary
- TR-Grid CA is operated.
- Regular updates including middleware is followed up and implemented to NGI_TR sites.
- Attendance to OMB meetings.
- Attendance to Grid Operation Meetings.
- CA packages had been updated.
- The Nagios box is operated and maintained.
- ops pilot role is implemented on TR-infrastructure for monitoring services.
- Fixing operational issue reported by CMS and ATLAS VOs.
- Reinstallation and reconfiguration of worker nodes in TR-10-ULAKBIM site
- The reported problems for Turkish Tier-2 centers have been resolved for atlas and cms VOs
- The new Azerbaijan site (AZ-01-IPANAS) is registered into GOCDB.
- The new Azerbaijan site is added to the national nagios instance.
- Stage rollout for EMI 2 User Interface server.
- Stage rollout for EMI VOMS server.
- Stage rollout for EMI LFC_mysql server.
- All grid services are monitored and the raised problems are fixed.
2.2. Main Achievements
The new Azerbaijan site is supported by the NGI_TR Operation Centre to be placed successfully in the EGI-InSPIRE infrastructure.
2.3. Issues and mitigation
Issue Description | Mitigation Description |
---|---|
NGI_TR has a new site which is installed in the beginning of this quarter with nearly ~5000 cpucores. NGI_TR operation centre is decided to use this site with SL6 and EMI components with SLURM resource manager. In addition to this site TR-01-ULAKBIM site which has nearly ~5000 cpucores is now using lcg-CE (gLite3.1). | The aim of the NGI_TR is to configure these two sites with SL6, EMI-2 components which will include SLURM support in a short period. |