Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

EGI-InSPIRE:Turkey-QR6

From EGIWiki
Revision as of 16:53, 22 January 2015 by Krakow (talk | contribs) (moved Turkey-QR6 to EGI-InSPIRE:Turkey-QR6)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
QR6 NGI_TR TUBITAK ULAKBIM Feyza Eryol


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
12-14 September 2011 TOBB ETU, Ankara, Turkey Molecular Dynamics Workshop II Feyza Eryol Researcher who runs molecular dynamics simulations were the participants of the national workshop. We had a presentation which introduced the NGI_TR, EGI and related activities.
19-23 September 2011 Lyon, France EGI Technical Forum 2011 Onur Temizsoylu https://www.egi.eu/indico/conferenceTimeTable.py?confId=452#20110919


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

  • TR-Grid CA is operated.
  • The self-audit of TR-Grid CA is presented in the EUGridPMA meeting which is held on 12-14 September, 2011.
  • Service certificates are updated for DPM-disk servers.
  • Regular updates of middleware is followed up and implemented to NGI_TR sites.
  • Security updates are followed up and implemented to sites.
  • The patches had been applied for the torque security bug.
  • Attendance to OMB meetings.
  • Attendance to Grid Operation Meetings.
  • CA packages had been updated.
  • The Nagios box is operated, maintained and updated.
  • Two additional top-BDII services is installed and regular updates have been done in the DNS for High Availability.
  • The VOMS service is migrated to SL5 and gLite3.2.
  • The reported problems for Turkish Tier-2 centers have been resolved

2.2. Main Achievements

After the f2f OMB meeting in Lyon, we installed 2 more top-BDII service and configure the DNS server with NSUpdate patch. Now, NGI_TR has 3 top-BDII services which is loadbalanced with DNS roundrobin method. Also, we had a monitoring script which checks the availability of the top-BDII's and send an update to the DNS server for HA.

2.3. Issues and mitigation

Issue Description Mitigation Description
UMD top-BDII package configuration problems We tried to install the two of the top-BDII service of UMD for the HA of the top-BDII service of NGI_TR. It was installed and configured easily with the ldap2.4 packages. But the slapd deamon is not running stable so we had installed gLite3.2 service nodes. We will try to install UMD top-BDI once more to be able to open a GGUS ticket UMD for top-BDII service.