Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Switzerland-QR4"

From EGIWiki
Jump to navigation Jump to search
Line 78: Line 78:
===2.1. Progress Summary===
===2.1. Progress Summary===
<!-- Provide your test below -->
<!-- Provide your test below -->
==== CSCS ====
* Upgraded cluster by adding 10 Worker Nodes with 240 total cores. Increased storage capacity by 232 TB.
* GPFS introduced to replace Lustre as scratch in the future.
* Participated in staged rollout of gLite CREAM, gLite WN, gLite Torque utils and gLite Torque client for gLite 3.2
* LCG-CEs decommissioned.
* Created a new queue for high-memory ATLAS jobs.
* Migration of SUN Thumpers from Solaris to Linux.
==== PSI ====
* New system engineer joined our team in February
* Improved resilience of the system by a new Nagios service, better low level HW monitoring, centralized backups
* Started to offer an additional number of UI machines for more interactive work


===2.2. Main Achievements===
===2.2. Main Achievements===

Revision as of 13:33, 20 April 2011


Quarterly Report Number NGI Name Partner Name Author
4 NGI_CH Switzerland Andres Aeschlimann


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
11.-14.4.11 Vilnius EGIUF 6 (UniBE, UZH, SWITCH) http://uf2011.egi.eu/


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

CSCS

  • Upgraded cluster by adding 10 Worker Nodes with 240 total cores. Increased storage capacity by 232 TB.
  • GPFS introduced to replace Lustre as scratch in the future.
  • Participated in staged rollout of gLite CREAM, gLite WN, gLite Torque utils and gLite Torque client for gLite 3.2
  • LCG-CEs decommissioned.
  • Created a new queue for high-memory ATLAS jobs.
  • Migration of SUN Thumpers from Solaris to Linux.

PSI

  • New system engineer joined our team in February
  • Improved resilience of the system by a new Nagios service, better low level HW monitoring, centralized backups
  • Started to offer an additional number of UI machines for more interactive work

2.2. Main Achievements

2.3. Issues and mitigation

Issue Description Mitigation Description