Alert.png The wiki is deprecated and due to be decommissioned by the end of September 2022.
The content is being migrated to other supports, new updates will be ignored and lost.
If needed you can get in touch with EGI SDIS team using operations @ egi.eu.

Difference between revisions of "EGI-InSPIRE:Sweden-QR3"

From EGIWiki
Jump to navigation Jump to search
 
(6 intermediate revisions by 3 users not shown)
Line 1: Line 1:
__NOTOC__
{{Template:EGI-Inspire menubar}}
 
{{Template:Inspire_reports_menubar}}
{{TOC_right}}


{| border="1" cellspacing="0" cellpadding="2"
{| border="1" cellspacing="0" cellpadding="2"
Line 20: Line 23:


==1. MEETINGS AND DISSEMINATION ==
==1. MEETINGS AND DISSEMINATION ==
=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:=====
<!--=====GENERAL GUIDELINES FOR ALL EVENTS REPORTED IN THE FOLLOWING SECTIONS:=====
*please do not provide a list of participants, only give the number of people that attended
*please do not provide a list of participants, only give the number of people that attended
*for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“
*for outcome, please list tangible agreements, decisions instead of listing program points or presentations you made. Otherwise put: “-“
Line 27: Line 30:
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu.  
**If your presentation is not available online, please send the slides to erika.swiderski@egi.eu.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed.  
Note: Complete the tables below by adding as many rows as needed. -->


===1.1. CONFERENCES/WORKSHOPS ORGANISED===
===1.1. CONFERENCES/WORKSHOPS ORGANISED===
Line 96: Line 99:
Provide your text below
Provide your text below
-->
-->
During the third quarter monitoring switched to Nagios. A major update of the accounting system (SGAS)
During the third quarter monitoring switched to Nagios.
was performed as a part of
 
the NDGF RT project.
A major update of the accounting system (SGAS)
was performed as a part of the NDGF RT project.


As planned a one-day meeting with all the sites were held on Januari 19 2011.  
As planned a one-day meeting with all the sites were held on Januari 19 2011.  
Line 104: Line 108:
===2.3. Issues and mitigation===
===2.3. Issues and mitigation===


Interoperability between the ARC middleware and the operational and monitoring tools remains the main issue. The Information systems of
Interoperability between the ARC middleware and the operational and monitoring tools remains a major issue. The Information systems of
ARC does not really work that well when reported through BDII.
ARC does not really work that well when reported through BDII.


Line 111: Line 115:
!scope="col"| Issue Description
!scope="col"| Issue Description
!scope="col"| Mitigation Description
!scope="col"| Mitigation Description
|-
|Issue description || Issue mitigation
|-
|-
|}
|}

Latest revision as of 17:40, 22 January 2015

EGI Inspire Main page


Inspire reports menu: Home SA1 weekly Reports SA1 Task QR Reports NGI QR Reports NGI QR User support Reports



Quarterly Report Number NGI Name Partner Name Author
3 NGI_SE Sweden Mats Nylén


1. MEETINGS AND DISSEMINATION

1.1. CONFERENCES/WORKSHOPS ORGANISED

Date Location Title Participants Outcome (Short report & Indico URL)
20110119 Stockholm SweGrid All hands meeting 15

1.2. OTHER CONFERENCES/WORKSHOPS ATTENDED

Date Location Title Participants Outcome (Short report & Indico URL)
20101109 Copenhagen NDGF Strategy Workshop 2
20101202 Copenhagen NDGF All Hands meeting 11
20101217 München EGI-Inspire PMB 1
20110124-25 Amsterdam OMB meeting 1 https://www.egi.eu/indico/conferenceDisplay.py?confId=153
20110125 Amsterdam OTAG 1 https://www.egi.eu/indico/conferenceDisplay.py?confId=245


1.3. PUBLICATIONS

Publication title Journal / Proceedings title Journal references
Volume number
Issue

Pages from - to
Authors
1.
2.
3.
Et al?

2. ACTIVITY REPORT

2.1. Progress Summary

During the third quarter, grid operations has progressed smoothly. The availability for the Swedish Tier2 (SE-SNIC-T2) has been well over 95%.

Various persons within Sweden continue to contribute towards in task-forces etc.

During the end of the quarter major upgrades of the Swedish tape storage commenced. This will be completed during the next quarter.

The NDGF transition into a new organization started from Januari 1st, and will continue throughout 2011. This is a major revision of the NDGF organization, even so, the strong collaboration among the Nardic countries will continue.

2.2. Main Achievements

During the third quarter monitoring switched to Nagios.

A major update of the accounting system (SGAS) was performed as a part of the NDGF RT project.

As planned a one-day meeting with all the sites were held on Januari 19 2011.

2.3. Issues and mitigation

Interoperability between the ARC middleware and the operational and monitoring tools remains a major issue. The Information systems of ARC does not really work that well when reported through BDII.

Issue Description Mitigation Description